UAT (User Acceptability Testing)

Download Report

Transcript UAT (User Acceptability Testing)

Breaking the Surface!
UAT Testing Process and Documentation for
SAP Business Objects
Sara Allen
Associate Director Of Analytics
July 8th, 2013
UAT-User Acceptability Testing
Process Overview
•
•
•
•
•
•
•
•
Data Prep
Data validation
Joins
BO Attributes
Changes
Critical Dates
Report Validation
Misc. Test
https://www.mtholyoke.edu/datawarehouse/documents-and-templates
Overall Use of the Document:
•
Tabs number correlate with the Test Case
o
•
•
Example: 400 correlate with Critical Dates Test Case
Home Page: Date Tested and Sign offs- List the Names of all the testers
Test Cases:
o
Test ID numbers for each item Example 100-1
o
List the Query criteria when applicable
o
List the expected results
o
PASS/FAIL
o
Retest Date
o
Comments- start with the date- then your comment-your initials.
• Example: 7/1/12- Smith was listed instead of Jones-SA
Data Prep –
Regroup and really think through what we have.
•
Circle back to the Data Inventory - do we have what we need?
anything we don't?
•
•
•
Naming
Organization (in universe)
Domain validation - do the attribute names describe the values in
the data
•
Data types, Format
•
Data validation (100) –
This test case validates all
of the data attributes and
ensures that those data
elements are displaying the
correct values and the
correct format, examples;
mm/dd/yyyy, $, commas,
text vs. numeric. Is
everything there that we
need?
•
Joins (200) - This test
case validates how the
data elements are joined
with the tables at the
source level. How are the
attributes are joined/ fit
together and what is the
query criteria.
•
Counts and BO Created
Attributes (300) - This test
case validates that all the
counts are counting accurately
and that all attributes created
only in BO function as defined
in the requirements.
Essentially testing the
measures created by the Data
Architect and validate the
query criteria behind them.
•
Changes (400) - Tests the
changes to the source system
and how they are reflected in
BO. Tests that all "track" data
elements defined in the
requirements, are actually
tracking the history. This test
case is testing how new data is
introduced, which in essence is
tracking the business process.
We want to see how the data is
populated, refreshed and
tracked.
•
Critical Dates (500) Testing that all critical
dates and/or snapshots
function as they should.
Testing a point in time.
•
Report Validation (600)
- Reconcile reports run from
the core system against
reports created and
produced in BO.
•
Misc. Test (700) - Any
misc. test scenarios
determined to test during
UAT
Looking Ahead
•
What’s Next? Universe will go into
Production/Swan.
Tidbits of advice to make testing less painful:
•
•
•
Ask for help
Patience is a virtue
Communication is a must
THANK YOU!
PowerPoint presentation is saved on AMBR under data-
warehouse>users-group.