ERCOT Annual Validation Suspension Analysis Update to RMS Carl Raish ERCOT Load Profiling
Download ReportTranscript ERCOT Annual Validation Suspension Analysis Update to RMS Carl Raish ERCOT Load Profiling
ERCOT Annual Validation Suspension Analysis Update to RMS Carl Raish ERCOT Load Profiling October 12, 2005 Test Data Aggregation Runs Objective: Quantify the settlement impact associated with 2005 Annual Validation Residential Profile Assignment Changes Lodestar iTest environment set up and refreshed as of 07/30/2005 Sample of 30 days selected between October 2004 – April 2005 Stratified by differences between RESHIWR and RESLOWR profiles Base-line data aggregations have been run for all 30 days Profile IDs have been updated to reflect Annual Validation changes 578,000 Residential Assignment changes Data Aggregation has been re-run to capture the affect of the assignment changes Next steps Compare before and after results to estimate differences attributable to AV 2005 Primary metrics will be UFE and Load Ratio Share 2 Residential Survey Update Objective is to quantify the accuracy of the 2005 Annual Validation Residential Profile Assignment Changes Build an accurate algorithm to predict presence and use of electric space heating based on the survey responses in conjunction with each responder’s usage history in Apply the algorithm to each of the ESIIDs with Profile Assignment changes Determine the percent of changes which are correct RESHIWR with electric heat RESLOWR without electric heat If the majority of changes are correct then AV 2005 is improving Profile Assignment Accuracy Survey status 41,000 surveys were mailed on August 30 (plus Pilot Survey) Returns have been received and processed Response rate is 11.4% (4,669 returns) as of 09/30/2005 Data entry is complete and response data has been provided in electronic form by the Market Research firm Next steps Response validation is underway Statistical Assignment Algorithm development Apply algorithm to all ESIIDS with Profile Assignment Changes and determine accuracy 3 Conclusion Analysis findings will be presented to PWG in October Findings and a PWG recommendation to either suspend or continue with AV 2005 transactions will be presented to RMS in November RMS recommendation to TAC and the Board in December Note: based on the Board motion, submission of transactions will commence December 31, 2005 ... Suspension of AV 2005 will require approval of a motion 4 Questions? 5