Well barriers & annular pressure management
Download
Report
Transcript Well barriers & annular pressure management
INTERNATIONAL STANDARD ISOTC67/SC4M
1 st edition 2010 5 - 8
Petroleum and natural gas industries — Well
integrity for the operational phase.
Participating Work groups
Well integrity management & handover
–
Gary Limb (ConocoPhillips) Lead
–
Simon Spark ( Tullow Oil )
–
Nina Ringoen( Centrica )
–
Joe Anders ( BP ) / Mike Payne BP > replaces Joe
Define well types & risk based monitoring
–
Paul Hopmans ( Shell ) ( Iso standard Convener )
– Andre Luiz Rocha Alves Petrobras
–
Gavin Mundie ( Centrica )
–
Crawford Hair ( Chevron
- Grant Lintern (Woodside) added
Well barriers & annular pressure management
–
Hilde Brandanger ( Statoil )
– Alex Crabtree ( Hess ) lead
–
Pier Alberto Magarini (Eni )
Well review & test criteria
–
Nigel Snow ( Maersk )Lead
–
Mike Murrey ( ExxonMobil )
–
Remco Donders (Total)
Other participants
ISO contacts
'[email protected]';
'[email protected]‘; Reeve,
Neil TN GSNL-PTE/DTST;
OGP focal point'[email protected]';
Participating companies to review.
Petro China
Adco / Zadco Abu Dahbi;
Petronas Malaysia
Billiton
Petroleum Development Oman
Gazprom
Qatar Petroleum
Referenced standards (So far )
API 14 A / B / D/ H
API 6 A
API 90
Norsok D 10
Iso 17776 Hazard identification
Iso 14224 reliability and maintenance data for equipment
ISO 31000 risk management
ISO standard content
Scope / Definitions /References
Well Integrity Management System
Organizational Structure
Competence
Data Management
Handover
Assessment Well Integrity
Assurance Process
Performance indicators KpI’s
Management of Change
Barrier Principle
Barrier Principle/Philosophy
Barrier Definition (WBE/SCE)
Barrier Schematics
Barrier Performance Matrix
Barrier Reliability/survivability (safety case)
ESD/Related Safety Systems
Risk management
Risk factors and assessment Matrix
Corrosion\ Erosion Management
Conductor\Structural\Reservoir Compaction
Risk Based Maintenance Process
Annulus Pressure Management
Annuli Pressure Monitoring Process
Definition/Calculation of MAASP/ MAWOP
Sustained Pressure Management
Integrity assurance
Closed in/temporary suspended wells
Acceptance criteria / Leak Rates
Integrity Fault Mitigation
Integrity Deviation/Waver Process
Incident/ response planning
Lifecycle management.
Well Review/ Health Check Process
Life Cycle Extension
Abandonment criteria for end of well life
Definition of Well integrity
Well integrity process is:
Application of technical , operational and organizational
solutions to reduce risk of uncontrolled release of well bore
fluids through out the life cycle of a well, to avoid harm to
people , environment and assets and the required barriers
and assurance task in place to prevent this .
This well integrity standard addresses the operate phase of
the well from well construct hand over to abandonment only.
Team 1 topics ( Gary )
1. Organisation R&R
2. Information management
3. Well hand over
1. Well design basis
2. Traceability of SCE materials
4. People & competence
5. Procedures
6. Management of change
7. KPI’s metric’s
8. Assessment health check ( system)
Team 2 topics (Paul )
1.
2.
3.
4.
5.
6.
7.
Risk matrix
Performance standards
Mitigation of faults
Emergency response plan
Deviation process
Reliability process
Condition monitoring all wells that are not abandoned
1.
Corrosion proposal Nigel
8. Risk based monitoring , inspection & maintenance,
1.
flow wetted and non flow wetted components
9. Reservoir compaction assurance task and risk
Team 3 topics (Alex)
1.
2.
3.
4.
5.
6.
7.
8.
Barriers
Barrier schematic’s matrix
Safety systems / ESD ‘s
Annular pressure management
Methods of monitoring of annular pressure
Risk acceptance criteria definition
Acceptance criteria table
Mitigating measures
Team 4 topics ( Nigel )
Well review process
Well review scope
Triggers for Well review
Well review documentation process
Technical health check
End of well life review
Valve testing & barrier verification
Leak rates
Block and bleed
Barrier verification test
Testing methods
Function testing
Interface seal testing
Well head maintenance ( OEM spares definition )
Annular pressure test
SCV testing
Timeline plan for development of ISOTC67/SC4M standard 1 st
edition 2010 5 – 8 Well integrity for the operational phase I
2010
Q1 Q2
Draft ballot
ballot
1 st f2f
Scope initiation
Work group reviews other operators
Q3
Q4
2011
Q1 Q2
Q3
Q4
2012
Q1 Q2
Q3
Q4
2013
Q1 Q2
Q3
30 % progress on
content
60 % progress on
content
2nd f2f 12 / 13 /14 th April Houston
3rd f2f Netherlands , following SPE work shop in Noordwijk 15
th / 16 th Sept and 19 th / 20 th Sept in Rijswijk
4 th f2f
5 th f2f
6 th f2f
Celebration
100 % progress on
content
Technical autor ediiting
100 %
Committee draft
Committee draft
Comments
National committee endorsement
Note: 15 th afternoon after SPE start and continue in Grand Palace Noordwijk hotel,
continue on Monday Tuesday in Rijswijk, details to follow.
Q4