Future Business Opportunities
www.wetex.ae
• Distributed Renewable Resources Regulations and Standards:
DSCE/DEWA has defined
initiatives in this regards:
1. Distributed Renewable
• Off-Grid: installation firms licensing, acceptable manufacturer,
training….. etc.
• On-Grid: Consultancy for the regulation and technical standards.
Resources Regulations.
2. The Consultancy Services for
the connection of Renewable
Resources Generators into
Transmission and
Distribution Network of
DEWA awarded to M/s.
TRACTEBEL Engineering S.A
The detailed study for the connection of renewable resources
generators into the Transmission and Distribution network of DEWA is
carried out by the competent team of Consultants in developing
Technical codes and Standards, perform specific tasks directed towards
the physical connection of distributed Generation of Renewable
resources (DER) to DEWA’s Distribution network and the development
of a pricing mechanism for all Renewable Resources Generators
(RRGs) on implementation.
. together with M/s. ELIA and
ENERGINET.DK as their Sub-
Business opportunity will be opened for suppliers , installation
Consultants are in the final
contractors and developers for Distributed Energy Resources
stages of reporting and
Generators (DERG) and Renewable Energy Resources Generators
finalizing the Regulation, Grid
(RRGS).
Code (Technical Standards)
and Implementation Plan.
www.wetex.ae
SOLAR PLANT:
The consultancy contract awarded to M/s. ILF Consulting Engineers
on 22nd February 2012 for the development of 1000 MW Solar Power
DEWA has defined initiatives in
Park . The formal launch of DUBAI SOLAR PARK was performed by
this regards:
the Hon’ Prime Minister of UAE and Ruler of Dubai HH Sheik
1. Distributed Renewable
Muhammed Bin Rashid Al - Maktoum on 9th January 2012 in Grand
Resources Regulations.
2. Development of 1000 MW Solar
Power Park launched in Dubai.
Consultancy Contract awarded
for construction of 10 MW PV
solar plant to be installed &
commissioned by August 2013.
3. Dubai Integrated Energy
Hyatt Dubai in a colorful ceremony.
The salient points of this contract are:
o Review of the available technologies. Payback period, cost of electricity
generated …. etc.
o Design Engineering and Supervision of Construction of a 10 MW solar
plant based on PV technology.
As the first step towards developing the Solar Power Park, a solar plant
of 10MW capacity with PV Thin Film technology will be installed. This
Strategy ( DIES 2030)
10MW Photovoltaic Plant will be constructed as a partnership project
implementation of energy
with the investment and ownership shared between six Dubai Supreme
resources diversification
Council of Energy member entities (DEWA, DM, DPE, DUBAL,
projects a 1% renewable of
DUSUP & ENOC).
total Dubai energy portfolio by
Business opportunity will be opened for suppliers , installation
2020 and 5% by 2030.
contractors and developers.
www.wetex.ae
Stages of the First Project (21 Months)
1st Quarter 2012 (2 Months) The scope covers the overall layout of the Park as well
as all requirements for the 1st Project -10 MW PV Contractor (Engineering &
Supervision).
The consultancy contracts has been awarded to ILF Consulting Engineers.
DEWA has defined initiatives in
this regards:
1. Distributed Renewable
Resources Regulations.
2. 10 MW Pilot Project Plant in
Dubai .
3. Dubai Integrated Energy
Strategy ( DIES 2030)
implementation of energy
resources diversification
projects a 1% renewable of
total Dubai energy portfolio by
2020 and 5% by 2030.
2nd Quarter 2012 (3 Months): The consultant has undertaken an overall plan and
environmental detailed study for the park as well as Engineering & Supervision of the
1st 10 MW Project. The Consultant is currently in the process of short listing the EPC
Contractors through structured pre qualification process in close coordination with
DEWA and the EPC Tender for 10MW Photovoltaic Plant will be issued (June 2012).
3rd Quarter 2012 (3 Months): The consultant has evaluated the bids of the 1st
project.
Beginning of 4th Quarter 2012 (1 Month): Contract Awarded for the 1st Solar Project
(10 MW) to M/s. First Solar Inc.
The “10 MW Photovoltaic Power Plant” will be located in “Saih al Dahal”
approximately 50 km south of Dubai and 20 km southeast of the small town of Al
Lisaili, United Arab Emirates. The PV power plant shall have a total output power of
10 MW at Reference Site Conditions (RSC), which means that the PV power plant
shall have total installed power of 13 MW under Standard Test Conditions (STC).
The electrical power shall be generated with cadmium telluride (CdTe) modules
connected to an adequate number of monitored DC junction boxes. The DC junction
boxes shall be further connected to central inverters which convert the current from
DC to AC. The output voltage of the inverters shall be transformed to 33 kV level
End of 4th Quarter 2013 (12 Months): 1st Project Operation with total capacity of 10
MW.
www.wetex.ae
As part of conservation measures and reduce energy consumption, DEWA is going to replace all
conventional lights and lighting fixtures with energy efficient light and lighting fixtures for DEWA
offices, Head Office, Al Hudaiba, Al Wasl, Burj Nahar, Umm Ramol, 157 Substations and ‘D’
Station, Jebel Ali Complex.
DEWA placed order with M/s Value Addition LLC, Dubai to implement the above conservation
measures.
The contract value is Dhs. 4.75 Mln and contract duration is 5 months.
Supply, Installation, Testing and Commissioning of Grid based Solar Panel Power System at
DEWA Building (Rooftop) at Al Quoz.
DEWA placed order with M/s Value Addition LLC, Dubai for the above.
The contract value is Dhs. 5.1 Mln and contract duration is 10 weeks.
www.wetex.ae
In order to ensure safety and security of DEWA asset and infrastructure, DEWA is going to install
High Definition Cameras to 179 substations and 400KV tunnel including modification of DEWA
existing networks and installation of new communication infrastructure and high tech security
control station.
DEWA placed order with M/s HCL Infosystems MEA, Dubai to implement the above CCTV
systems.
The Order value is Dhs. 25.57 mln and execution time is 22 months.
www.wetex.ae
Clean Coal Plant Project:
The consultants M/s. McKinsey & Co. have submitted the feasibility report. The report covers
Technology Selection, Coal type Coal sourcing Environmental aspects Construction and
Operation model . Dubai inland no. site was selected for further detailed site specific
investigation for the setting up of the coal based power generation plant. Consultants were
advised to conduct detailed study of Infrastructure and supply chain developments for the setting
up of the coal based power generation plant at the selected site and submit final report. Final
report was submitted by the Consultant . However, Hassyan site is currently being considered for
the development.
• Next Steps:
• Feasibility LNG facility at offshore Hassyan site.
• Feasibility Study for Syn Gas Process Plant.
• To Carry out site development study for building 2 x 705 MW, of coal based power
generation plants at the Hassyan site for commissioning by 2020/2021, and which is to
be built as an IPP project.
www.wetex.ae
Smart Grid:
•
Project Driven by the need to the growing demand for energy and electricity, grid
infrastructure expansion, the Dubai Energy strategy to diversify the energy mix and
introduce the environmentally friendly energy sources, the Dubai Energy strategy initiative
related to conservation and Demand Side Management programme, reduce carbon
emissions, and improve customer service.
•
No. of Firms submitted the offer : 16
Tender under final evaluation and the Contract Award is expected in October 2012.
www.wetex.ae
DEWA – RWE Engineering consultancy Company
is a new initiative from DEWA
Access to world class
solution & Practices
Gain exposure to new & innovation solution and idea that could
lead to improvement of DEWA’s current operations as well as help
shape future developments through RWE’s knowledge &
experience.
www.wetex.ae
Water Bottling Plant:
• Naming: An internal naming competition announcement was made on 16th of May. The chosen
name was “Mai Dubai”
• company registration :The law firm, Afridi & Angell, was hired on May 6th to proceed with the
company registration
• Tender for consultancy services released on May 30th and closing date for receipt of completed
tender is 2nd July 2012. Tenders are under evaluation and the Consultancy Contract award is
expected in October 2012.
• Site :selected to be next to Al Ghafat water reservoirs
www.wetex.ae







Purchase of 106 nos of Various Light Motor Vehicles including SUV’s, 4 Wheelers,
Single and Double cabin Pick-ups, Mini Vans, Buses & Golf Carts etc worth AED
7,500,000.00 awarded in 2012.
Purchase of 15 Nos of various Heavy Vehicle & Vehicular equipments including Wheel
Loaders, Backhoe Loaders, Excavators, Forklifts, Hydraulic Truck Cranes of upto 30
Tone Range, Hot-Line Washing Equipments etc worth AED 9,700,000.00 awarded in
2012 .
Purchase of 5 nos 1500 KVA Diesel Generator Sets with all wheel drive Truck worth AED
10,000,000.00 awarded in 2012.
Silicon Coating equipments for 12 nos of 400 KV substations worth AED 3,000,000.00
awarded in 2012.
Purchase of UV Corona Camera for monitoring OHL worth AED 500,000.00 awarded in
2012
Purchase of Partial discharge equipment worth AED 500,000.00 awarded in 2012.
Purchase of Vehicular Batteries of various ranges, Types & Models worth AED
700,000.00 awarded in 2012.
www.wetex.ae

Purchase of 12 Nos of various Heavy Vehicle & Vehicular equipments including Wheel
Loaders, Backhoe Loaders, Excavators, Forklifts, Hydraulic Truck Cranes of up to 30
Tone Range, Hot-Line Washing Equipments etc worth AED 12,000,000.00 is expected to
be awarded in 2012.

Various Auto Garage Related equipments such as Pint Booth Equipments, Air
Compressors, Drilling & Cutting machines, Lift poles of various sizes and
lifting capacities, A/c Recovery Machines, Battery Chargers, Jacks Trolleys, Overhead
cranes etc worth AED 18,000,000.00 to be awarded in 2012.

Purchase of 12 nos of Various Light Motor Vehicles including 4 WD Single and Double
cabin Pick-ups etc worth AED 1,500,000.00 to be awarded in 2012.

Purchase of Insulators & Fittings for 132kV Over Head Line circuits worth AED
25,000,000.00 expected to be awarded in 2012
www.wetex.ae

Supply of 11 KV XLPE Power Cables (Cable Length – 3CX240 sqmm. Al.420 Km &
3CX300 sqmm. Cu. 525 Km) recently awarded.

Supply of 1000 KVA Pocket Substations (600 Nos.) recently awarded

Supply of 1500 KVA Mineral Oil filled Transformers (122 Nos.) recently awarded

Supply of Low Voltage XLPE Power Cables (Cable Length – 4CX120 sqmm. Al.37 Km &
4C X300 sqmm. Al. 235 Km) recently awarded.

Civil Works for Installation of 11/33 KV Cables recently awarded.

Supply, Installation, Testing and Commissioning of 132kV Cable laying works for Mushrif
(MUSH) 132/33kV Substation and associated works (Cable Length -10 Km) recently
awarded.

Supply, Installation, Testing and Commissioning of 132KV Cable Laying works for 5 Nos.
400/132kV Substations, 11 Nos. 132/11 KV Substations, 1 No. Reactor and Associated
Modification works. (Cable Length -130 Km) recently awarded.
www.wetex.ae

Supply, Installation, Testing and Commissioning of 132kV Cables for Pearl Jumeriah 132
/11kV Substation (Cable Length – 14.4 Km) to award in 2012.

Supply, Installation, Testing and Commissioning of 132kV Cables for 50 nos. 400/132 kv
Substations, 11 Nos. 132/11 kv Substations, 1 No. Reactor & associated works (Cable
Length -140 Km) to award in 2012.

SITC of 132kV Cable Laying works for 5 Nos. 400/132kV substations, 11 Nos. 132/11kV
substations, 1No 132/33kV substation ,2 Nos. Reactor and associated modification works
(Cable Length -300 Km) to award in 2013

Consultancy Services for Risk Assessment on the installed equipment 132/11 kv Substations
facing the road to award in 2012.

Consultancy Services for reviewing & upgrading Fire Protection Design Specification to
award in 2013.
www.wetex.ae

Supply of FGRP Kiosks to award in 2012 (AED 6,447,240/-)

Supply of Mini Distribution Pillars to award in 2012 (AED 2,999,000/-)

Supply of Earthing Materials to award in 2012
www.wetex.ae

Construction of Lussaily Reservoirs (120 MIG) and associated works 2X60 MIGD).

Supply, Installation, Testing and Commissioning of Communication Network Water
Scada.
Supply, Installation of Mechanical Level Gauges for Water Reservoirs.



Supply of various House Connection Materials like Stop cock, LDPE / HDPE Pipes,
Ferrules, etc.
Consultancy Services for Design & Supervision of Construction of Solar Innovation
Centerm
Supply, Installation of Fibre Optic Cable at Sheik Zayed Road & Hatta.

Supply, Installation, Testing and Commissioning of a New Water SCADA Control Centre.

Supply & Installation of 350 kms of 100 mm to 450mm Water Distribution Pipeline &
associated works at various locations in Emirate of Dubai - to award in 2012.

Supply & Installation of Water Distribution Pipeline & associated works at Hatta - to
award in 2012.

www.wetex.ae

Dubai Water System Leakage Detection & Network Restitution Project (RC4)

Replacement of the 4 nos. Soft Starter and Supply, Installation, Testing &
Commissioning of 4 Nos. 250 KW VFD in Jebel Ali Habab Pumping Station Phase I
Stream A-LV2 - Pilot Project

Supply, Installation, Testing and Commissioning of a New Water SCADA Control Centre.

Supply & Installation of 400 kms of 100 mm to 450mm Water Distribution Pipeline &
associated works at various locations in Emirate of Dubai - to award in 2012.

Supply & Installation of Water Distribution Pipeline & associated works at Hatta.

Auto Workshop & Garage Building and Associated Civil & Electromechanical works.