Transcript Document
DeCA EUROPE ZONE MEETING Operations Update Bob Hayden Performance and Policy Directorate of Performance and Policy ROBERT E. HAYDEN (137) Director, Performance & Policy (4) Myrtis McClung Secretary Eric Swayzee, Chief, DOB Operations Business Group Div (12) Terri Kerby, Chief, DOA Acquisition Division (18) Diana GrossBendall, Chief, DOAM Support & MHE Branch Purple boxes = HQS Gray boxes = FOA Gray & Purple = HQS & FOA Hector Granado Chief, DOW Workforce of the Future Division (3) Doreen Cadigan Chief, DOAE Acquisition Equip Br Tony Collazo Chief, DOS Systems Division (9) Vacant Chief, DOL Logistics Division (41.5) Gary Kimball, Chief, DOP Plans Division (4) Ken Walker, Chief, DOC Facilities Programming Division (4) Boyce Bourland Chief, DOF Facilities Sustain & Construction Division (28.5) Jerry Trevino Chief, DOFC Construction Branch Steve Brunow Chief, DOLM Equipment Maintenance & Replacement Branch Vacant Chief, DOLP Property Accountability Branch Kitty Jolley Chief, DOLS Support Supply Branch Vacant Chief, DOLU Logistics Branch Europe John Stuit Chief, DOFM Maintenance & Repair Branch Fred Stein Chief, DOX Security Division (13) AGENDA • Front End Audits • Infrastructure Support • Energy Conservation 3 Management Checklist • Store Director • Front End Manager/Daily System Checklist 4 Infrastructure Support 5 Organizational Chart Robert Hayden - DO Performance & Policy Ft Lee, VA Boyce Bourland - DOF Program Manager Lackland AFB, TX John Stuit Chief, DOFM Lackland AFB, TX West Region Field Engineer John Thompson West Region Field Engineer Hebert Nuchi West Region Field Engineer Manual Mendoza East Region Field Engineer Dave Smith East Region Field Engineer Marianus Ekka East Region Field Engineer Tarun Sen Europe Office Joaquin Hernandez Chief, Facilities Europe GS-0801-13 Alexander Bak Construction Rep C-07a Andy Walker Technical Inspector C-06a Hubertus Krieger Construction Rep C-07a Will Blackburn Contract Admin GS-07 Vacant Construction Rep C-07a 6 Facilities Engineering CONSTRUCTION PROJECTS PM/REPAIRS PROGRAM - Accountable for Facility matters in Europe - Covers facilities and equipment - Support Major Construction - MCIP Design and Acquisition - Energy Surveys and Projects - Special Projects (<$150k) - Centralized contracts for Germany, Holland & Belgium Regionalized Individual Base Contracts in UK Base or PWD Support at others 7 Facilities Engineering Area Engineers Responsibilities • Interpret and execute DeCA facility policies within Europe area • Team is responsible for all facets of facilities support • Minor construction projects are designed and executed • Extensive major construction project involvement • Attend meetings in lieu of or in support of HQ personnel • Region manages its own total facility maintenance program for Germany, Holland, Belgium • Region responsible for all facility maintenance contracts • All funding is managed by Europe RM Office 8 Facilities Engineering Europe Uniques • Local national engineers: – Hubertus Krieger – Alexander Bak • Primary duty is construction representative • Maintenance group: – Andrew Walker – William Blackburn • Primary duty is executing maintenance contracts and quality assurance 9 Facilities Engineering Construction Methods • Indirect design & construction • Changes difficult, slow, expensive • Different laws and regulations by country • Host nation involvement - multiple bureaucratic layers • Different construction Agents (EUD, NAVFAC, DE, Army, AF) • DeCA criteria must be adapted 10 Facilities Engineering Facility Maintenance Methods • Direct contract with Wiesbaden Army Contracting • Single call center for all central Europe stores • Staff a full time work order desk to receive request for repairs and maintenance from stores, distribution centers, cold storage facilities, meat processing plant and region offices • Evaluate and prioritize calls and issue work orders to maintenance contractors • Perform regular on site quality assurance and inspections of the contractor’s work 11 Facilities (DOF) Support to Europe • Design and Construction Management – Lackland office manages major project design and construction • Support provided by USACE or NAVFAC • Recently completed new stores at Grafenwoehr, GE and Rota, SP (2007) • New stores at Chievres, BE and Livorno, IT are under construction • Design underway for projects at Ansbach, GE (new store), Spangdahlem, GE (new store), RAF Alconbury (Upgrade) and Ramstein, GE (Add/Alter) – Field Engineer and staff (four) • Support major construction from European Region • Execute minor construction and region-funded projects • Apply DeCA Design Criteria and insure host-nation requirements are met 12 Facilities (DOF) Support to Europe • Maintenance and Repair – Field Engineer • Staff of four located with the European Region • Total facility maintenance contract in place for Germany, Belgium and the Netherlands -- used as the model for the new CONUS total facility maintenance approach • Task-specific contracts are used for maintenance and repair in the United Kingdom and the Mediterranean • Conduct energy surveys 13 Energy Program 14 DeCA Energy Goals • Set by Executive Order 13423 and the Energy Independence and Security Act of 2007 (P.L. 110-140) • Reduce energy consumption per square foot by 9% of the FY 2003 Baseline by the end of FY 2008 with a reduction of 30% by the end of FY 2015 15 Minimizing the Impact • Aggressively evaluating DeCA standards to reduce energy consumption – Evaluating lighting criteria – Evaluating HVAC and refrigeration control requirements • Validating facility square footages • Increased energy audits • Increase requests for ECIP funds – FY 2009 ECIP funding doubled compared to prior years 16 Energy & Environmental Program (FY 2007 Commissaries Only Energy Profile) DeCA Commissaries Progress Toward FY10 Energy Use Goal FY10 FY09 FY08 FY07 FY06 FY05 FY04 FY03 FY02 FY01 FY00 FY99 FY98 FY97 FY96 FY95 FY94 FY93 FY92 FY91 FY90 FY07 through Quarter 4 0% 179 170.3 174 168.0 169 162.9 10% 164 164.8 155.5 158.9 15% Goal 156.7 153.5 152.7 159 150.8 154 155.9 149 Actuals 20% 149.1 149.6 144 25% 30% FY05 Goal = 146.0 kBTU/sf = 20 Percent Reduction FY10 Goal = 136.9 kBTU/sf = 25 Percent Reduction 139 Rolling Annual EUI (kBTU/sf) Percentage Reduction from FY90 5% 134 129 124 35% 119 Figure 5-1 17 FY 2007 DeCA Energy Profile DeCA Facilities Progress Toward FY15 Energy Use Goal -10% FY15 FY14 FY13 FY12 FY11 FY10 FY09 FY08 FY07 FY06 FY05 FY04 FY03 FY07 through Quarter 4 161 156 146.6 151 144.3 0% 146 146.1 142.1 5% 141 139.9 136 10% 131 126 15% 121 20% 25% 116 111 Reduction 106 Actuals 30% 101 FY15 Goal = 102.3 kBTU/sf = 30 Percent Reduction 35% 40% Rolling Annual EUI (kBTU/sf) Percentage Reduction from FY03 -5% 96 91 86 Figure 5-3 DeCA is currently not meeting Energy Reduction Goal 18 New Stores • New stores are currently not meeting the 30% energy reduction per square foot goal of 2015 • Designed prior to FY 2005 – New stores are increasing relative sales area, and adding additional refrigerated displays – Sales area has much higher energy usage per square foot compared to other areas • Higher Heating and Cooling energy requirements • Twice the lighting energy per square foot • More refrigerated displays 19 Cost Versus Consumption • Electric rates ($/kWh) have increased 7.3% with an overall energy rate ($/MBtu) increase of 5% • First quarter FY 2008 energy analysis projects an annual consumption per square foot increase of 0.8% from FY 2007 Energy & Environmental Program (Energy Cost Comparison) Category DeCA East Commissaries DeCA Europe Commissaries DeCA West Commissaries All Commissaries Non-Commissaries All Facilities FY03 $16,894,584 $4,057,157 $20,520,196 $41,471,937 $2,167,973 $43,639,909 Energy Costs FY06 FY07 $18,975,211 $20,664,085 $6,259,358 $7,259,665 $23,540,345 $23,975,096 $48,774,914 $51,898,845 $3,253,190 $3,180,159 $52,028,104 $55,079,004 FY06/FY07 Comparisons $1,688,874 8.9% $1,000,307 16.0% $434,751 1.8% $3,123,931 6.4% ($73,031) -2.2% $3,050,900 5.9% Number of Facilities FY03 FY06 FY07 103 98 98 56 53 48 112 111 110 271 263 256 11 11 9 282 274 265 21 Energy & Environmental Program (Energy Consumption Comparison) Category DeCA East Commissaries DeCA Europe Commissaries DeCA West Commissaries All Commissaries Non-Commissaries All Facilities Energy Use, kBTU/sf FY03 FY06 FY07 161.6 151.7 152.3 128.2 137.3 139.3 157.4 154.2 150.1 155.1 150.8 149.6 67.7 72.8 64.0 146.1 142.1 139.9 FY03/FY07 Comparison -5.8% 8.7% -4.6% -3.5% -5.5% -4.2% FY06/FY07 Comparison 0.4% 1.5% -2.7% -0.8% -12.1% -1.5% Number of Facilities FY03 FY06 FY07 103 98 98 56 53 48 112 111 110 271 263 256 11 11 9 282 274 265 22 "Top 5“ Things Store Directors Can Do to Ensure They Are Conserving Energy 23 Conserve Energy • Treat your store as you would your home relative to how your employees, vendor stockers and baggers use energy and water • Show all your employees, vendor stockers, and baggers the DeCA 12 minute video “Put Yourself in the DeCA Energy Efficiency Picture” • Turn off ½ of sales area lights (where possible) and refrigerated case lights during stocking hours • Have employees turn off lights when they leave the area (office, break room, rest room, prep room, freezer, and cooler) • CLOSE freezer and cooler doors, sales area doors to the warehouse and warehouse receiving doors CLOSED when not receiving or stocking Questions? 25