Transcript 802.22

doc.: IEEE 802.22-12/0064r01
July Plenary Opening Report
IEEE P802.22 Wireless RANs
Authors:
Name
Company
Apurva N. Mody BAE Systems
Date: 2012-07-12
Address
Phone
email
P. O. Box 868,
MER 15-2350,
Nashua, NH 03061
1-404-8190314
apurva.mody@baesyst
ems.com
apurva_mody@yahoo.
com
Notice: This document has been prepared to assist IEEE 802.22. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in
this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein.
Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE
Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit
others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.22.
Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures http://standards.ieee.org/guides/bylaws/sb-bylaws.pdf including the
statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to
patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard
is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair
Apurva N. Mody < [email protected] > as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a
draft standard being developed within the IEEE 802.22 Working Group. If you have questions, contact the IEEE Patent Committee Administrator at [email protected].
>
Submission
Slide 1
Apurva N. Mody, BAE Systems
doc.: IEEE 802.22-12/0064r01
Outline
•
•
•
•
•
•
•
•
•
•
IEEE 802.22 WG Agenda
IEEE P802.22 – Progress Report
IEEE P802.22.1 – Progress Report
IEEE P802.22.2 – Progress Report
IEEE P802.22a – Progress Report
IEEE 802.22b – Progress Report
New Study Group on Amendment to IEEE P802.22.1
Letters of Assurance
Past and Future Meetings
Likely WG Motions at the March EC Meeting
Submission
Slide 2
Apurva N. Mody, BAE Systems
doc.: IEEE 802.22-12/0064r01
IEEE P802.22 WG Agenda
• Opening Plenary
• Motions at the EC - Request the chair to make the following motions to the EC
– Request that EC Approve the formation of a Study Group for an
amendment to the IEEE 802.22.1
• IEEE P802.22 – Project Completed. Standard published on July 1st, 2011.
• IEEE P802.22.1 – Project Completed. Standard published on November 1st
2010
• IEEE 802.22.2 – Submitted to RevCom
• Opening Plenary
• Tutorial – None
• Mid-week plenary – No Mid-week Plenary
• Closing Plenary (Thursday, PM1, PM2)
• EC Meeting
Submission
Slide 3
Apurva N. Mody, BAE Systems
doc.: IEEE 802.22-12/0064r01
IEEE P802.22.1 Progress Report
• IEEE802.22.1-2010 Standard was published in 2010
• We would like to sincerely thank the 802.22 members and
contributors, Members of the IEEE 802 Executive Committee,
Members of the IEEE SA RevCom, Members of the IEEE SA
Board and the IEEE SA Staff.
Submission
Slide 4
Apurva N. Mody, BAE Systems
doc.: IEEE 802.22-12/0064r01
IEEE P802.22 Progress Report
• IEEE802.22-2011 Standard was published on July 1st 2011.
• We would like to sincerely thank the 802.22 members and
contributors, Members of the IEEE 802 Executive Committee,
Members of the IEEE SA RevCom, Members of the IEEE SA
Board and the IEEE SA Staff.
Submission
Slide 5
Apurva N. Mody, BAE Systems
doc.: IEEE 802.22-12/0064r01
IEEE P802.22.2 Progress Report
• P802.22.2 Sponsor Ballot process has been completed
• 802.22 received an approval from the EC to forward 802.22.2 to the
RevCom.
• The approval and response ratios can be found below:
Submission
Slide 6
Apurva N. Mody, BAE Systems
doc.: IEEE 802.22-12/0064r01
Motion
Motion for a Approval to forward the IEEE P802.22.2
to the IEEE SA RevCom
Submission
Apurva N. Mody,
Slide BAE
7
Systems
doc.: IEEE 802.22-12/0064r01
Motion for Approval to forward the IEEE P802.22 to
the IEEE SA RevCom
Rules
Motions requesting conditional approval to forward
when the prior ballot has closed shall be accompanied
by:
• Date the ballot closed
• Vote tally including Approve, Disapprove and
Abstain votes
• Comments that support the remaining disapprove
votes and Working Group responses.
• Schedule for confirmation ballot and resolution
meeting.
Submission
doc.: IEEE 802.22-12/0064r01
Motion for a Conditional Approval to forward the IEEE
P802.22.2 to the IEEE SA RevCom
Number of People in the Sponsor Ballot Pool = 102
IEEE
Sponsor /
Re-circ
Ballot
Respo
nse
Ratio
Approval
Ratio
Negative
Votes
Number of
Negative
Comments
Received
Comment
Resolutio
n Status
Draft
Status
Sponsor Ballot #1
Open – Feb 20
2012, Closed –
Mar 20, 2012
81%
97%
2 Negative Votes
with Comments
5
Comments
addressed &
resolved - 2212-0029 Rev4
P802.22.2/
D 2.0
prepared
100%
0 Negative Votes
Received
0
Comments
addressed &
resolved – 2212-0029 Rev4
P802.22/D
3.0
prepared
100%
0 Negative Votes
Received
0
No more
comments to
resolve
P802.22/D
3.0 to be
sent to
RevCom
Sponsor Ballot
Re-circ #1
Open – Apr. 22nd,
2012, Closed –
May 7th, 2012
Sponsor Ballot
Re-circ #1
Open – May.
23rd, 2012,
Closed – June
2nd, 2012
Submission
(4%
abstain)
85%
(8%
abstain)
87%
(6%
abstain)
Apurva N. Mody,
Slide BAE
9
Systems
doc.: IEEE 802.22-12/0064r01
P802.22 WG Motions
WG Motion #7 Document – 22-11-0048
Rev0
Move to authorize the P802.22 WG Chair and
the Ballot Resolution Committee (Gerald
Chouinard, Apurva Mody, Tom Gurley) to
continue the comment resolution of the
P802.22.2 comments for Draft v1.0. The Chair
to issue Draft v2.0 of the P802.22.2
Recommended Practice and launch a 30 day
Sponsor Ballot or 15 day Sponsor re-circulation
ballot as he sees fit no later than April 20th.
Subsequently to resolving the comments for
P802.22.2 authorize the P802.22 WG Chair to
issue further drafts and launch other rounds of
re-circulation ballot, if required to meet the
conditions to send the draft to RevCom.
Move: Apurva Mody
Second: Jerry Kalke
For: 8
Against: 0
Abstain: 0
Submission
WG Motion #2 Document – 22-110059 Rev0
The IEEE 802.22 Working Group
authorizes the WG Chair to seek
(Conditional) Approval from the
IEEE 802 Executive Committee to
forward P802.22.2/D3.0 to the IEEE
SA RevCom.
Move: Ivan Reede
Second: Dr. Chang-woo Pyo
For: 8
Against: 0
Abstain: 0
Motion passes unanimously
Apurva N. Mody,
Slide 10
BAE Systems
doc.: IEEE 802.22-12/0064r01
Motion for Un-conditional Approval to forward the IEEE
P802.22.2 Draft Standard to the IEEE SA RevCom
Move that EC grants un-conditional approval as per the IEEE
802 Operations Manual to forward IEEE P802.22.2 D3 to the
IEEE Standards Association Review Committee.
(13 EC Members present during the June 5th EC Telecon)
Move: Apurva N. Mody,
Second: James Gilb
Any Objection for unconditional approval?
No Objections
MOTION PASSES
http://www.ieee802.org/minutes/Conferencecalls/2012_06_05_Call_Minutes_R0.pdf
Submission
Apurva N. Mody,
Slide 11
BAE Systems
doc.: IEEE 802.22-12/0064r01
IEEE P802.22a MIBs and Managememt Plane
Procedures
• First P802.22a WG letter ballot is under-way.
• Received 42 Comments
• Implemented resolution of comments discussed during last faceto-face
• Continuing work on MIB development.
Submission
Slide 12
Apurva N. Mody, BAE Systems
doc.: IEEE 802.22-12/0064r01
IEEE P802.22b Enhancement for Broadband
Services and Monitoring Applications
Task Group formed
Process document
Functional Requirements
Call for Proposals issued
Selection Criteria
Technical/Informative Contributions
Proposal presentations
Baseline proposal selected
Draft for 1st letter ballot
1st letter ballot completed
2012
1 3 5 7 9
x
11
1
11
2014
1 3 5 7 9
11
x x
x x
x
x x x
x x x
x
x
x x
x
Comment Resolution
x
2nd letter ballot completed
Comment Resolution and recirculation
Sponsor ballot
Comment Resolution and recirculation
RevCom/NesCom Approval
Submission
2013
3 5 7 9
x
x
x
x x
x
Chang-woo Pyo (NICT)
x
March 2012
doc.: IEEE 802.22-12/0064r01
IEEE P802.22 Letter of Assurance
• The LoAs can be found on the website at www.ieee802.org/22
as well as on the IEEE SA website
Submission
Slide 14
Apurva N. Mody, BAE Systems
doc.: IEEE 802.22-12/0064r01
Future Sessions
IEEE 802.22 Future Sessions are planned as follows
Submission
Session
Dates
Location
Plenary
July 15-20, 2012
San Diego, CA
Interim
Sep 16-21, 2012
Indian Wells, CA
Plenary
Nov 11-16, 2012
San Antonio, Tx
Interim
Jan 13 -18, 2013
Vancouver, BC
Plenary
March 17 – 22, 2013
Orlando, FL
Interim
May 12-17, 2013
Waikoloa, HI
Slide 15
Apurva N. Mody, BAE Systems
doc.: IEEE 802.22-12/0064r01
Likely P802.22 WG Motions to the EC(2)
Request that EC Approve the formation of a Study Group
for an amendment to the IEEE 802.22.1
Submission
Slide 16
Apurva N. Mody, BAE Systems
doc.: IEEE 802.22-12/0064r01
802.22 Sponsored Tutorial
There are no 802.22 Tutorials for this session
Submission
Slide 17
Apurva N. Mody, BAE Systems
doc.: IEEE 802.22-12/0064r01
References
• IEEE 802.22 WG Agenda, July Plenary, San Diego, CA.
https://mentor.ieee.org/802.22/dcn/12/22-12-0062-00-0000-july-plenary-working-groupagenda.xls
• Meeting minutes, June 5th EC Telecon: http://www.ieee802.org/minutes/Conferencecalls/2012_06_05_Call_Minutes_R0.pdf
Submission
Slide 18
Apurva N. Mody, BAE Systems