Installation Planning

Download Report

Transcript Installation Planning

Installation – Accelerator Systems
Installation Planning & Schedules
Install org chart & planning
2007 Installations
BTH -> FEH “2008” Installation
October 29-31, 2007
FAC Review – Accelerator Installation
1
Richard M. Boyce
[email protected]
*
October 29-31, 2007
FAC Review – Accelerator Installation
2
Denotes IMT member
Richard M. Boyce
[email protected]
Installation Planning
2007 SLAC Shutdown
SLAC downtime – September, October, November 2007
2007 Installation Planning
Installation through BC2 & all cable plant; including
cables through the BSY into the BTH West
Using SLAC Schedule process for SLAC resource loading
2008 Installation Planning
LCLS installations begin at Early Occupancy dates
defined by TCCo & LCLS
2008 Installation schedule developed to begin detailed
planning & integration process – refined by the rebaseline
Early Co-Occupancy dates being defined
Will follow on 2007 Installation learning curve and use P3 for
detailed install schedule (shift work, multiple calendars, etc)
Schedule shows Metrology work starting as early as
December 2007
October 29-31, 2007
FAC Review – Accelerator Installation
3
Richard M. Boyce
[email protected]
2007 Installation Schedule
LCLS 2007 Installation schedule includes:
Facilities Work
Sector 21 – 30 electrical
BTH West MEP & LCW
Cable Plant
Sector 24 – 30
I&C and DC cables for BC2
BSY Work
Cables from B005, B105, B106, B136 into BTH West
BPM S21 to BSY
Mechanical/Vacuum
Sector 24 – 29 removal and installations of BC2 & L3
Controls
BCS; BC2 Magnet controls; Vacuum System; BC2
Timing System; BC2 MPS; BC2 Networks; BC2
Motion Control System
October 29-31, 2007
FAC Review – Accelerator Installation
4
Richard M. Boyce
[email protected]
2007 Installation Schedule (cont)
LCLS 2007 Installation schedule, as of 10/19/07,
contains 550 task lines
Shift work and multiple crews being used for
Mech/Vac; shift work in schedule for Cable Plant
work during PPS no access periods
Critical Path
As of 10/19/07, CP runs through BC2
Removal of hardware - Cable plant and component
install – cable terminations – cable testing; complete
11/23/07
Magnet testing & checkouts need to interleave and
follow cable completion through end of downtime
Further testing may need ROD periods
October 29-31, 2007
FAC Review – Accelerator Installation
5
Richard M. Boyce
[email protected]
2007 Installation Schedule (cont)
LCLS 2007 Installation schedule 6/22/07
BSY Work (for example)
Cable Plant from B005, B105, B106, B136 into
BTH West
Requires Downtime (obviously) to install cables,
therefore needed in 2007 down. Magnet loads
not installed until ~March 2008, but need to
checkout & commission before next downtime
Cable plant (Controls) install needs to be
coordinated with BTH West MEP (LCLS CF)
October 29-31, 2007
FAC Review – Accelerator Installation
6
Richard M. Boyce
[email protected]
BSY Work – B005 to BTH West
Cable run from B005
through the BSY, into BTH
West via ~12 small
penetrations
B005
October 29-31, 2007
FAC Review – Accelerator Installation
7
Richard M. Boyce
[email protected]
2007 LCLS Installation Schedule 0 of 4
Started integrating
schedules in July
October 29-31, 2007
FAC Review – Accelerator Installation
8
Richard M. Boyce
[email protected]
2007 LCLS Installation Schedule 1 of 4
Status as of 10/19/07
Completed items removed
October 29-31, 2007
FAC Review – Accelerator Installation
9
Richard M. Boyce
[email protected]
2007 LCLS Installation Schedule 2 of 4
October 29-31, 2007
FAC Review – Accelerator Installation
10
Richard M. Boyce
[email protected]
2007 LCLS Installation Schedule 3 of 4
October 29-31, 2007
FAC Review – Accelerator Installation
11
Richard M. Boyce
[email protected]
2007 LCLS Installation Schedule 4 of 4
Several Controls Systems
schedules included: PPS,
BCS, Magnet, Vacuum,
MPS, etc.
October 29-31, 2007
FAC Review – Accelerator Installation
12
Richard M. Boyce
[email protected]
2007 Installation Schedule (cont)
Installation checks & balances
RSWCF for linac & cable way penetrations
ES&H review of Statement Of Work’s (SOWs)
Subcontractor installations
Appropriate training
Work authorization forms (WAF)
AD & LCLS forms
Radiation Work Permit (RWP)
Electrical safety for cable plant install &
connection to PS
PO lockdown procedure being used
October 29-31, 2007
FAC Review – Accelerator Installation
13
Richard M. Boyce
[email protected]
Shutdown Planning & Installation Schedule
Installation Planning & Schedules
BTH -> FEH 2008 Installation
October 29-31, 2007
FAC Review – Accelerator Installation
14
Richard M. Boyce
[email protected]
2008 Installation Planning
2008 Installation Planning
LCLS installations begin at Early Occupancy dates
defined by TCCo
BTH, Undulator Hall & Service Buildings available as
early as December 5, 2007; NEH 12/21/07; X-ray tunnel
1/8/08; FEH 3/24/08; SB 2.3 late December
TCCo has priority over co-occupied space until B.O.
BTH-NEH B.O. 3/21/08; X-ray tunnel – FEH B.O. 6/23/08
NEH elevator not available until ~March 2008, will limit
early equipment installation
Subcontract SOWs are being prepared
Need to ensure this work does not impact the 2007
installation effort, but stay on schedule (cable plant
already slipped into February 2008)
October 29-31, 2007
FAC Review – Accelerator Installation
15
Richard M. Boyce
[email protected]
2008 LCLS Installation Schedule 1 of 7
2008 Schedule
2007 Downtime
Co-Occupancy dates
defined
Major subcontracts used for
installations
First activity is Metrology
network installation
LTU components
connect to cables
installed through
BSY in 2007
downtime
October 29-31, 2007
FAC Review – Accelerator Installation
16
Richard M. Boyce
[email protected]
LTU Hardware contained inside BTH West and BTH
Entry areas are East & West mazes, and openings at
headhouse
Will plan access areas to limit interferences with
Undulator and LTU installation phases
East Maze – Undulator
entry point
West Maze entry point
Headhouse entry
SB 2.1
SB 2.2
BTH West tunnel
October 29-31, 2007
FAC Review – Accelerator Installation
SB 2.3
17
Undulator Hall
Richard M. Boyce
[email protected]
2008 LCLS Installation Schedule 2 of 7
LTU components
installed in BTH
Undulator girder
installation
October 29-31, 2007
FAC Review – Accelerator Installation
18
Richard M. Boyce
[email protected]
LCLS UNDULATOR SYSTEM
33 rf Beam Position Monitors
33 Beam Finder Wires
Wire Position Monitor
Hydro static level system
33 Undulators
33 Quadrupoles/Correctors
EM air-cooled
10 Long breaks
22 Short Breaks
Supports with movers
5 DOF plus horizontal slider
Vacuum System interconnects
October 29-31, 2007
FAC Review – Accelerator Installation
19
Richard M. Boyce
[email protected]
Egress space between aisle
and back of undulators
(cleared with Fire Marshal)
October 29-31, 2007
FAC Review – Accelerator Installation
Undulator
Elevation
20
Richard M. Boyce
[email protected]
~430’ long
Integration also means knowing
what the facility looks like prior
to installing equipment
October 29-31, 2007
FAC Review – Accelerator Installation
21
Richard M. Boyce
[email protected]
Undulator Hall
SB 2.3
SB 3.1
Beam dump/Fee area
October 29-31, 2007
FAC Review – Accelerator Installation
22
Richard M. Boyce
[email protected]
2008 LCLS Installation Schedule 3 of 7
E- Dump components
installed
FEE installation
October 29-31, 2007
FAC Review – Accelerator Installation
23
Richard M. Boyce
[email protected]
LCLS 2008 Installation schedule
FEE systems are well along in the planning stages
October 29-31, 2007
FAC Review – Accelerator Installation
24
Richard M. Boyce
[email protected]
2008 LCLS Installation Schedule 4 of 7
NEH Installations;
most of which are
delayed into FY09
October 29-31, 2007
FAC Review – Accelerator Installation
25
Richard M. Boyce
[email protected]
LCLS 2008 Installation schedule
NEH overview
NEH Hutches
October 29-31, 2007
FAC Review – Accelerator Installation
26
Richard M. Boyce
[email protected]
2008 LCLS Installation Schedule 5 of 7
X-Ray tunnel and
FEH installation
delayed until
FY2009
October 29-31, 2007
FAC Review – Accelerator Installation
27
Richard M. Boyce
[email protected]
2008 LCLS Installation Schedule 6 of 7
LTU ready – 8/11/08
Und ready – 10/15/08
FEE ready – 4/30/09
October 29-31, 2007
FAC Review – Accelerator Installation
28
Richard M. Boyce
[email protected]
2008 LCLS Installation Schedule 7 of 7
2008 Downtime
Systems ready for
first electron beam
into LTU & dump by
10/22/08
Commissioning
activities
leading to CD-4
2009 Downtime
October 29-31, 2007
FAC Review – Accelerator Installation
29
Richard M. Boyce
[email protected]
Summary
2008 Installation Planning
Early occupancy of Conventional Facilities will
begin the installation process for technical systems
Working to understand definition of early occupancy
for each area
Does not require Linac/PEPII down for LCLS
installations
BTH West installation puts some limits on beam
operation to other areas like ESA
Need to coordinate several subcontracts (~3-4?) to
install mechanical systems and cable plant
simultaneously
Detailed Installation planning in process by
coordinators
October 29-31, 2007
FAC Review – Accelerator Installation
30
Richard M. Boyce
[email protected]
End of Presentation