Conventional Facilities Update

Download Report

Transcript Conventional Facilities Update

Meeting of the
LCLS Facilities Advisory Committee
LCLS Conventional Facilities
Jess Albino
April 16, 2007
FAC CF Overview
Jess Albino
[email protected]
Conventional Facilities
Major Developments
Project Team
Status of Construction
Construction Schedule
6 Month Look-ahead
Summary
April 16, 2007
FAC CF Overview
Jess Albino
[email protected]
Major Developments
Construction Underway
Beam Transfer Hall
Undulator Hall Tunnel
Electron Beam Dump/Front End
Enclosure
Near Experimental Hall
Access Tunnel
April 16, 2007
FAC CF Overview
Jess Albino
[email protected]
Major Developments – cont’d
Relocation of CM/GC
Preparation of Laboratory Functionality
Strategy
Contractor Claim
April 16, 2007
FAC CF Overview
Jess Albino
[email protected]
PROJECT TEAM
Additional Hires in CF
CM/GC Personnel Changes
ES&H / SME Support
Consultants for Quality Control Testing
April 16, 2007
FAC CF Overview
Jess Albino
[email protected]
CONSTRUCTION
April 16, 2007
FAC CF Overview
Jess Albino
[email protected]
Beam Transfer Hall (BTH)
April 16, 2007
FAC CF Overview
Jess Albino
[email protected]
BTH SLAB
April 16, 2007
FAC CF Overview
Jess Albino
[email protected]
BTH
April 16, 2007
FAC CF Overview
Jess Albino
[email protected]
UNDULATOR HALL TUNNEL PORTAL
April 16, 2007
FAC CF Overview
Jess Albino
[email protected]
PRE-DRILLING
April 16, 2007
FAC CF Overview
Jess Albino
[email protected]
UTILITIES CROSSING BEAM DUMP
April 16, 2007
FAC CF Overview
Jess Albino
[email protected]
PLACING NEAR HALL SLAB
1200+ cu. yds
April 16, 2007
FAC CF Overview
Jess Albino
[email protected]
PLACING SUBBASEMENT FORMS
April 16, 2007
FAC CF Overview
Jess Albino
[email protected]
STRIPPING SUBBASEMENT FORMS
April 16, 2007
FAC CF Overview
Jess Albino
[email protected]
ROADHEADER AT THE FACE
April 16, 2007
FAC CF Overview
Jess Albino
[email protected]
LHD IN ACCESS TUNNEL
April 16, 2007
FAC CF Overview
Jess Albino
[email protected]
PREPARING TO APPLY SHOTCRETE
April 16, 2007
FAC CF Overview
Jess Albino
[email protected]
INTO THE HILLSIDE
April 16, 2007
FAC CF Overview
Jess Albino
[email protected]
ACCESS TUNNEL
April 16, 2007
FAC CF Overview
Jess Albino
[email protected]
CONSTRUCTION SCHEDULE
MARCH 2007 UPDATE
BEAM TRANSFER HALL
Concrete Work ahead 6 days
Excavation at East end subject to Undulator Tunnel late
start.
UNDULATOR HALL TUNNEL
Delayed Start 11 days – late submittals and temporary
power
ELECTRON BEAM DUMP – Excavation may be
delayed by Undulator Tunnel and Utilities
April 16, 2007
FAC CF Overview
Jess Albino
[email protected]
CONSTRUCTION SCHEDULE
MARCH 2007 UPDATE
FRONT END ENCLOSURE – Excavation may be
delayed by Utilities – partial excavation completed
NEAR EXPERIMENTAL HALL – Ahead of
schedule 7days
X- RAY TUNNEL – No Activity this month
FAR EXPERIMENTAL HALL – No Activity this
month
ACCESS TUNNEL – late start; late submittals and
temporary power – approx. 100 ft mined to date
April 16, 2007
FAC CF Overview
Jess Albino
[email protected]
CONSTRUCTION SCHEDULE
MARCH 2007 UPDATE
RECOVERY OPTIONS
Accelerate Undulator Hall Tunnel
Value Engineer Predecessor Activities
Begin Second Shift of Mining
Value Engineer Excavation / Support Sequence
April 16, 2007
FAC CF Overview
Jess Albino
[email protected]
6 MONTH LOOK-AHEAD
CONSTRUCTION
Complete BTH
Complete UH tunnel
Excavate and Pour Electron Beam Dump
Excavate and Pour CUP base slab
Excavate and Pour FEE
Complete Access Tunnel
April 16, 2007
FAC CF Overview
Jess Albino
[email protected]
6 MONTH LOOK-AHEAD (cont.)
Construction (cont.)
Start Excavation of Far Experimental Hall
Start Excavation of X-Ray Tunnel
April 16, 2007
FAC CF Overview
Jess Albino
[email protected]
Summary
Construction is underway for all major areas
CF staff has been strengthened / tailored for
construction phase
Contractor Staff Changes
Schedule Recovery Plans are in process
Continue to Value Engineer
Interface with SLAC, Tech. Systems, CM/GC
Re-double efforts to support TCCo and Construction to
prevent delays – keep to the schedule.
April 16, 2007
FAC CF Overview
Jess Albino
[email protected]
End of Presentation
April 16, 2007
FAC CF Overview
Jess Albino
[email protected]