Transcript ppt

GLAST LAT Project
LAT Mgr’s Meeting 2005
LAT Planning Meeting
Mechanical/Thermal Systems
June 15, 2005
Marc Campell
1
LAT Mgr’s Meeting 2005
GLAST LAT Project
Status
SLAC
• Grid 2 is in inspection at Tapemation
– Delivery to SLAC ECD: 7/1/05
• Static Load Test awarded to National Test Systems (NTS),
Santa Clarita, CA
• LAT Transporter
– RFQ issued 6/13/05
– Continue investigation of refurbishing NRL container
2
GLAST LAT Project
LAT Mgr’s Meeting 2005
Grid 2 Machining complete
3
LAT Mgr’s Meeting 2005
GLAST LAT Project
Status (cont)
Lockheed Martin - X-LAT
• Completed X-LAT thermal cycling test
– Key is to demonstrate that there is no change in the X-LAT heat
pipe bonds before and after the test.
– Ultrasonic inspection used to map disbonds
• Pre and post-test results
– 12 changes most approximately +/-0.1” (probe is .12” dia)
– 3 significant changes on heat pipe 0
• .3 x 1.2 to .3 x1 .7
• .3 x 1.2 to .3 x 1.7
• .3 x .25 to .3 x 1.2
– 8 new one areas ~.2 x .2”
– Total disbonded area still within limits
• Next steps
– Proceed with Weight and CG measurements
– Re-measure this heat pipe 0
– Need to return to MRB with final results summary and
recommendation
4
LAT Mgr’s Meeting 2005
GLAST LAT Project
Status (cont)
Lockheed Martin - Radiators
• Fabrication of both Radiator panel is complete less instrumentation
installation.
– ECD 6/24
• MLI design finalized (interfacing velcro locations)
– LM SCD to be revised
Environmental test preps moving forward
• Vibration testing
– Acoustic and Sine vibe fixtures complete
– TRR held 6/14
• 9 action items – key ones are need more details from pre-test
analysis and additional details into procedure
• Acoustic facility is being repaired (ECD 6/24)
• SBIRS still on Vibe table (ECD 6/24)
• Delta TRR to be held upon closure of action items, flight
hardware complete and procedure released
5
LAT Mgr’s Meeting 2005
GLAST LAT Project
Status (cont)
Lockheed Martin – Radiators cont.
• Thermal Vacuum testing
– Thermal vacuum test plan in review
– Test fixture design 90% complete
– MLI test blankets available
– SLAC provided EGSE console is 90% complete
– ATP for console in review
6
LAT Mgr’s Meeting 2005
GLAST LAT Project
MECH Milestones
7
LAT Mgr’s Meeting 2005
GLAST LAT Project
Threats to RFI
• LM X-LAT & Radiator delivery have no float.
• X-LAT
– Conclusive story on disbonds
• Radiator
– Potential cost over runs in testing
• Vibration/Acoustic tests
– Instrumentation requirements to qualify Radiator interface
• Final test plan for thermal vacuum.
– Lots of test prep work to go here
• Timely resolution of test anomalies.
– Pre-ship reviews
• Closing all of the paperwork
8