Trinity College Universal Design Issues
Access
Cobble
Reduction
Access to Historic (Protected) Buildings
Slide no.1
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
Access
Slide no.2
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
Temporary/immediate solutions
House 39 – Law School
Slide no.3
April 03-June06
Anatomy Building
Director of Buildings' Office
Trinity College Universal Design Issues
Permanent solutions Historic Buildings
Front Square Houses
New access ramps
Slide no.4
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
Permanent solutions - Historic Buildings
House 27
Slide no.5
April 03-June06
Entrance to Catex
Director of Buildings' Office
Trinity College Universal Design Issues
Permanent solutions Historic Buildings
The Old Library
Slide no.6
April 03-June06
The GMB
(Sounder/beacon retrofitted)
Director of Buildings' Office
Trinity College Universal Design Issues
Permanent solutions Historic Buildings
Cobble Reduction
Slide no.7
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
Permanent solutions - New Buildings
East End 4/5
Slide no.8
April 03-June06
SNIAMS (automatic doors)
Director of Buildings' Office
Trinity College Universal Design Issues
Permanent solutions - New Buildings
Berkeley Podium (ramp)
Slide no.9
April 03-June06
Ussher Podium (platform lift)
Sounder/beacon retrofitted)
Director of Buildings' Office
Trinity College Universal Design Issues
Permanent solutions - Existing Buildings
Lecky Library (Arts Building)
Slide no.10
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
Permanent solutions- New Buildings
Ussher/Berkeley Library (ramp and lift)
Slide no.11
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
General Facilities
UA Toilet
Desiginated Parking Bay
Slide no.12
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
Permanent solutions- New Buildings
Ussher/Berkeley Library (ramp and lift)
Slide no.13
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
Interim solutions
Portable Ramp
Slide no.14
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
General Requirements



Slide no.15
April 03-June06
Mobility: ease of access for all
Hearing: Induction loops, strobe alarms
Vision: Tactile clues, lighting, audible alarms
Director of Buildings' Office
Trinity College Universal Design Issues
Completed Projects – Lecture Halls

Accessible for all new buildings

Note: Access to lecture theatres in old buildings to be
considered.
Slide no.16
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
Completed Projects – Goldsmith Hall Residences

All units accessible by lift

All units ‘visitable’ and adaptable when required.

Specifically designed bathrooms available.
Slide no.17
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
Completed Projects – Botany Bay Residences
Refurbishment
Provision of 9 no places in 3 no. units

Each unit is fully adapted to suit Universal Design
requirements

Including specifically designed kitchens and bathrooms

In addition facilities can be provided for both the visually
impaired and deaf persons in the remaining units.
Slide no.18
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
Current Programs/Projects - Trinity Hall Residences
Each of the three new buildings is fully accessible
All apartments are 'visitable‘

45 of 938 bed spaces are enabled bed spaces with specially designed
toilet/shower facilities with 'nurse call' system centrally monitored and
enabled kitchen facilities.

Each apartment has an 1800 turning circle for wheelchair access.

All switches, door furniture etc are universally accessible-visibility socket
switches fitted

Specifically designated parking bays

Provision of facilities for both the visually impaired and deaf occupants.
Slide no.19
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
Priority List 1

GMB: internal lift

The Pavilion Bar: platform lift.

East Theatre: automate entrance door.

Arts Building (Faculty Area): automate doors/platform lift

Chemistry Building: improve access to Large Lecture Theatre.

Physiology/Zoology Building: Access provision.

The Boathouse: provision of UA toilets

Santry Pavilion: provision of UA toilets/changing room
Slide no.20
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
Priority List - General


Induction Loop System
Deaf alerter – Fire Alarms.

Cobble reduction.

Improve external/internal circulation routes

Visual/tactile provisions.
Slide no.21
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
For Consideration

Front Square: Access provision/automate doors

Provost’s House: Access provision.

New Square: Access provision/automate doors

East End: Improve access to existing buildings.

Islandbridge: improve access/lift installation/UD facilities.

Santry Pavilion: improve access/lift installation/UD facilities.
Slide no.22
April 03-June06
Director of Buildings' Office