Trinity College Universal Design Issues
Access
Cobble
Reduction
Access to Historic (Protected) Buildings
Slide no.1
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
Access
Slide no.2
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
Temporary/immediate solutions
House 39 – Law School
Slide no.3
April 03-June06
Anatomy Building
Director of Buildings' Office
Trinity College Universal Design Issues
Permanent solutions Historic Buildings
Front Square Houses
New access ramps
Slide no.4
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
Permanent solutions - Historic Buildings
House 27
Slide no.5
April 03-June06
Entrance to Catex
Director of Buildings' Office
Trinity College Universal Design Issues
Permanent solutions Historic Buildings
The Old Library
Slide no.6
April 03-June06
The GMB
(Sounder/beacon retrofitted)
Director of Buildings' Office
Trinity College Universal Design Issues
Permanent solutions Historic Buildings
Cobble Reduction
Slide no.7
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
Permanent solutions - New Buildings
East End 4/5
Slide no.8
April 03-June06
SNIAMS (automatic doors)
Director of Buildings' Office
Trinity College Universal Design Issues
Permanent solutions - New Buildings
Berkeley Podium (ramp)
Slide no.9
April 03-June06
Ussher Podium (platform lift)
Sounder/beacon retrofitted)
Director of Buildings' Office
Trinity College Universal Design Issues
Permanent solutions - Existing Buildings
Lecky Library (Arts Building)
Slide no.10
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
Permanent solutions- New Buildings
Ussher/Berkeley Library (ramp and lift)
Slide no.11
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
General Facilities
UA Toilet
Desiginated Parking Bay
Slide no.12
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
Permanent solutions- New Buildings
Ussher/Berkeley Library (ramp and lift)
Slide no.13
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
Interim solutions
Portable Ramp
Slide no.14
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
General Requirements
Slide no.15
April 03-June06
Mobility: ease of access for all
Hearing: Induction loops, strobe alarms
Vision: Tactile clues, lighting, audible alarms
Director of Buildings' Office
Trinity College Universal Design Issues
Completed Projects – Lecture Halls
Accessible for all new buildings
Note: Access to lecture theatres in old buildings to be
considered.
Slide no.16
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
Completed Projects – Goldsmith Hall Residences
All units accessible by lift
All units ‘visitable’ and adaptable when required.
Specifically designed bathrooms available.
Slide no.17
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
Completed Projects – Botany Bay Residences
Refurbishment
Provision of 9 no places in 3 no. units
Each unit is fully adapted to suit Universal Design
requirements
Including specifically designed kitchens and bathrooms
In addition facilities can be provided for both the visually
impaired and deaf persons in the remaining units.
Slide no.18
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
Current Programs/Projects - Trinity Hall Residences
Each of the three new buildings is fully accessible
All apartments are 'visitable‘
45 of 938 bed spaces are enabled bed spaces with specially designed
toilet/shower facilities with 'nurse call' system centrally monitored and
enabled kitchen facilities.
Each apartment has an 1800 turning circle for wheelchair access.
All switches, door furniture etc are universally accessible-visibility socket
switches fitted
Specifically designated parking bays
Provision of facilities for both the visually impaired and deaf occupants.
Slide no.19
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
Priority List 1
GMB: internal lift
The Pavilion Bar: platform lift.
East Theatre: automate entrance door.
Arts Building (Faculty Area): automate doors/platform lift
Chemistry Building: improve access to Large Lecture Theatre.
Physiology/Zoology Building: Access provision.
The Boathouse: provision of UA toilets
Santry Pavilion: provision of UA toilets/changing room
Slide no.20
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
Priority List - General
Induction Loop System
Deaf alerter – Fire Alarms.
Cobble reduction.
Improve external/internal circulation routes
Visual/tactile provisions.
Slide no.21
April 03-June06
Director of Buildings' Office
Trinity College Universal Design Issues
For Consideration
Front Square: Access provision/automate doors
Provost’s House: Access provision.
New Square: Access provision/automate doors
East End: Improve access to existing buildings.
Islandbridge: improve access/lift installation/UD facilities.
Santry Pavilion: improve access/lift installation/UD facilities.
Slide no.22