AMBRIDGE AREA HIGH SCHOOL Ambridge, Pennsylvania November 29, 2006 Brandon McKee

Download Report

Transcript AMBRIDGE AREA HIGH SCHOOL Ambridge, Pennsylvania November 29, 2006 Brandon McKee

AMBRIDGE AREA HIGH SCHOOL
Ambridge, Pennsylvania
November 29, 2006
Brandon McKee
Construction Management
SITE OVERVIEW
• Building adjacent to existing school
• 245,325 SF
• Construction cost - $39.2 million
Greening Public Schools
Critical Issues Research
• Identify barriers to green school design
from both school district and designer
point of view
• Compare needs of initial vs. lifecycle costs
• Develop LEED point list from owner
desires and designer suggestions
Precast Panels vs. Brick
• Examine erection time of two methods
• Compare lead time of methods
• Explore benefits of precast for LEED
design
• Possible increased energy efficiency
• Identify methods to make greener schools
and lower operation costs
• Reduction in mason scaffolding allows
other shell trades to begin earlier
Extreme Schedule Acceleration
• 24 month schedule delayed
• Scheduled for occupancy Jan. 2008
Middle of school year
• Reduce schedule for occupancy Sept. 2007
Beginning of school year
• Examine steel erection sequence and
methods
• GC cost reduction vs. accelerated steel
erection costs
Green Roof vs. EPDM
• Incorporate a green roof to part or whole
of roof area
• Study its effect on heating/cooling
loads/mechanical equipment size
• Examine LEED point addition
• Possible incorporation as educational tool
QUESTIONS ?