Balancing Authority Area Transmission Service Cost Estimates
25 MW Generator
Location
Cost (in
Millions of
dollars)
$0
See footnote 1
South of Great Falls
on the next
page
North of Great Falls
$8.75
East of Billings
E Bil
Boz-Bil
Bozeman-Billings
Missoula-Butte
WAPA
$25
$12.5
$0
Unknown
Transmission Cost Attributable
To 25 MW Project
25 MW
Generator
Location
South of
Great Falls
North of
Great Falls
East of
Billings
BozemanBillings
MissoulaButte
WAPA
NE MT
Full/Share (Full-CREP
Triggers upgrade,
Cost (in
Total Potential
Share-CREP shares in Millions of Cost (in Millions
cost for upgrade)
dollars)
of dollars)
Full
Full
Full
Full
N/A
Full
$0 - $14.25
$8.75
$10 - $25
$10 - $12.5
$0
N/A
Comments
No known congestion at this time with the current TSR
queue. If needed, CREP will reconductor the line they are
1
$0 connected to in the SOGF area.
If needed, CREP will reconductor the line they are
$8.75 connected to in the NOGF area.
If needed, CREP will reconductor the line in the Billings
$25 area.
If needed, CREP will reconductor the line in the Bozeman $12.50 Billings area.
At this time, no transmission congestion has been identified
and it is assumed that there is capacity on the lines to
$0 accommodate 25 MW.
WAPA interconnection, balancing and regulation reserves,
Unknown and transmission service costs are unknown.
1. Assumes the project is injecting its power a the Great Falls 230 Switch Yare. Should a project connect on one of 100 kV lines in the south