CDM Issues (incl. installation)

Download Report

Transcript CDM Issues (incl. installation)

CDM Issues

1

Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009

CDM Issues

What is CDM?

C

ONSTRUCTION work in host D ESIGN AND M ANAGEMENT

It’s the safety framework that UK civil engineering sites have to It’s a non-negotiable legal obligation on STFC’s part as MICE’s It’s implemented by a Principal Contractor,

Willie Spensley

And it’s monitored externally by

EDP Consulting Engineers Ltd Interaction with Users

Take Willie’s induction courseWear PPE (hard hat, safety shoes and hi-vis vest)Prepare Risk Assessments and Method Statements (RAMS) for

your work

Use common sense and take notice of WillieSign in and out of the Hall

CDM Issues

Always sign in and out of the Hall or control room, whatever you are doing.

Until the main Hall PPS is implemented, Willie must know who is In the Hall at any time

CDM Issues

All work on magnets or other electrical Equipment must be covered by an A uthorisation If unsure T o W ork (ATW) form, signed Off by Willie or his deputy (Andy) The form is self-explanatory, but ask Willie