pluto eslides final

Download Report

Transcript pluto eslides final

PLUTO FOR WINDOWS
Planning Land Use and
Transport Options
Dr. Csaba OROSZ associate Prof.
Department. of Highway and Railway Engineering, BUTE
Introduction

Simulation of the land use and transport
system in a hypothetical city: ‘Plutopia’ (midsize city in Britain)

Helps explore the interaction of transport
planning policies

Users (You) = transport and land use
planners in the city & politicians

Conditions and trends  set objectives and
strategies  achievements and feedback
analysis
2
PLUTO for Windows
Structure of Plutopia
- Symmetrical circular city
- 10 concentric
zones
(administration)
- 10
identical sectors
- 10 radial routes (each
consists of 9 links)
- 2 ring roads
3
Options
CONSTRUCTION
1
BUS SERVICES
2
BUS LANES
3
PARKING
4
MANAGEMENT
TRAFFIC
CALMING
AND SAFETY
5
TRAFFIC
6
MANAGEMENT
AND RESTRAINT
DEVELOPMENT
CONTROL
7
MAINTENANCE 8
EXPENDITURE
FINANCIAL
DECISIONS
9
4
PLUTO for Windows
Options
6 - TRAFFIC MANAGEMENT AND
RESTRAINT:
a) Cell System
b) Cordon Charge
c) Road Pricing
d) Park and Ride
e) SCOOT/TRANSYT
f) Traffic Information
5
PLUTO for Windows
Annual Report
domiv1 RUN NO 1
PEAK HOUR - INBOUND TRAFFIC PER SECTOR
LINK
CAPACITY
VEH. BUSES
1 2500
2
3
4
5
6
7
8
9
RR 1
RR 2
2300
2200
2400
2500
2500
2900
3000
2400
2400
2600
FLOWS
CARS BUSES
SPEED
CARS BUSES
0
2618
19
9
9
0
0
0
0
0
0
0
0
2765
3024
3527
3061
2721
2402
1854
971
1560
1538
19
19
19
19
19
19
19
19
5
2
8
7
6
10
12
17
22
28
22
23
6
5
4
6
6
7
9
10
13
14
6
PLUTO for Windows
Annual Report
domiv1 RUN NO 1
- OUTBOUND TRAFFIC PER SECTOR
LINK
1
2
3
4
:
8
9
RR 1
RR 2
CAPACITY
VEH. BUSES
2500
0
2300
0
2200
0
2400
0
FLOWS
CARS BUSES
862
19
286
19
206
19
675
19
3000
2400
2400
2600
726
355
1560
1538
LOCAL LINKS
0
0
3393
19
19
5
2
SPEED
CARS BUSES
21
6
26
10
28
15
27
19
31
32
22
23
25
30
13
14
8
7
PLUTO for Windows
Annual Report
domiv1 RUN NO 1
MORNING PEAK HOUR TRIP ENDS (HOME BASED)
ZONE
ORIGINS
CAR
NO CAR
1
1406
708
2
3
:
9
10
3615
5759
11839
12497
TOTAL
94694
DESTINATIONS
MODE SPLIT
CAR
WALK
33991
0.57
0.13
1041
1796
19859
10640
0.64
0.66
0.14
0.13
798
411
6305
5972
0.70
0.70
0.06
0.04
108240
0.65
0.11
13546
0,30
0,24
8
PLUTO for Windows
Annual Report
domiv1 RUN NO 1
PEAK PERIOD TRIP CHARACTERISTICS
CAR
USER
AV DISTANCE / LEG
(KMS)
AV IN-VEH-TIME / LEG
(MINS)
AV EXCESS TIME / LEG
(MINS)
AV FARES & FEES
PAID ($) / LEG
AV BEHAVIOURAL COST
(GENERALISED $)
3.66
BUS USER
CO NCO
3.68
3.32
17.45
25.55 22.48
2.45
14.57 14.57
0.09
0.59
0.57
3.10
8.85
6.29
18
67
9
29
THOUSANDS OF TRIPS /
DAY
70
THOUSANDS OF PAX. KM 256
WALKER
0.82
ALL
3.34
19.42
10.18
5.46
0.20
2.40
4.25
11
9
108
361
9
Annual Report
domiv1 RUN NO 1
OFF-PEAK HOUR - INBOUND TRAFFIC
PER SECTOR
LINK
1
2
:
RR 2
CAPACITY
VEH. BUSES
2500
0
2300
0
2600
FLOWS
CARS BUSES
1546
9
1602
9
517
- OUTBOUND
LINK
CAPACITY
VEH. BUSES
2500
0
2300
0
1
2
:
RR 2 2600
LOCAL LINKS
0
31
18
TRAFFIC PER SECTOR
FLOWS
CARS BUSES
407
9
139
9
517
484
SPEED
CARS BUSES
16
16
16
12
0
SPEED
CARS BUSES
23
6
26
11
31
8
18
10
Annual Report
domiv1 RUN NO 1
MORNING OFF-PEAK HOUR TRIP END
(HOME BASED)
ZONE
1
:
10
TOTAL
ORIGINS
DESTINATIONS
CAR NO CAR
675
415
15741
5999
45458
241
7943
MODE SPLIT
CAR WALK
0.65 0.11
3812
53401
0.68
0.66
0.04
0.10
OFF-PEAK PERIOD TRIP CHARACTERISTICS
CAR
USER
AV DISTANCE / LEG
(KMS)
:
THOUSANDS OF PAX. KM
BUS USER
CO
NCO
WALKER ALL
3.60
3.80
3.44
0.80
3.33
1264
293
182
43
1781
11
Annual Report
domiv1 RUN NO 1
PARKING REPORT
ZONE
PNR
PUBLIC
SPACES SPACES
PUBLIC
PARKING
CHARGE
$/HR
LONG STAY
1
7000
2
5500
3
4500
4
3500
5
2750
6
3000
6000
5000
3500
2500
2500
2500
5144
3929
891
500
638
1681
0.23
0.09
0.06
0.06
0.06
0.00
SHORT STAY
1
8000
2
5000
3
5000
4
3500
5
2500
6
2500
7000
4500
4500
2000
2000
2000
37960
5950
3290
6010
7610
7770
0.00
0.20
0.10
0.00
0.00
0.00
CONGESTION
*****
TOTAL REV $/DY = 13424 (LONG STAY) 2278 (SHORT STAY)
12
Annual Report
domiv1 RUN NO 1
PUBLIC TRANSPORT REPORT
COMMERCIAL
PEAK OFF-PEAK
FREQUENCY
19 28 9 18
PER HOUR
FIXED FARE PART ($) 0.30
0.13
VARIABLE FARE
0.08
0.04
PART ($/KM)
COST (K$) TO THE
CITY
BUS FLEET
IMPLEMENTED
PEAK OFF-PEAK
19
9
0.30
0.08
0.13
0.04
0
0
223
76
13
PLUTO for Windows
Annual Report
domiv1 RUN NO 1
MEASURES OF ENVIRONMENTAL
DISTURBANCE
LINK
NOISE
P
1
2
3
4
5
6
7
8
9
RR 1
RR 2
LOCAL
OP
3.7 3.0
3.4
3.3
3.5
3.4
3.1
3.0
2.6
1.9
2.6
1.8
1.7
2.7
2.6
2.8
2.5
2.2
1.9
1.6
1.0
2.2
0.9
1.3
CITY 2.6 2.0
PARTICLES
P
OP
3.7 2.9
3.3
3.2
3.5
3.0
2.7
2.4
1.9
1.1
2.2
1.3
1.3
2.4
2.6
2.4
2.6
2.2
1.8
1.4
1.1
0.7
1.8
0.9
1.3
1.9
CO
P
DAYTIME
OP
3.9 3.0
3.4
3.3
3.7
3.2
2.8
2.5
2.0
1.0
2.4
1.6
1.3
2.6
2.5
2.8
2.3
1.9
1.5
1.2
0.7
2.0
0.9
1.3
2.4 1.9
INDEX
3.1
2.8
2.6
2.8
2.5
2.1
1.8
1.4
0.9
2.1
1.0
1.3
2.0
14
Annual Report
domiv1 RUN NO 1
ACCIDENT REPORT FOR THE ENTIRE CITY
VEHICLE USER CASUALTIES
FATAL SERIOUS SLIGHT
PEDESTRIAN CASUALTIES
FATAL SERIOUS SLIGHT
LINK
1
2
3
4
:
9
RR 1
RR 2
LOCAL
1
13
82
1
11
27
0
1
1
10
11
19
63
70
124
1
1
1
6
5
6
16
13
16
0
0
0
1
2
3
2
24
12
17
13
143
0
0
0
2
2
2
3
29
6
6
7
89
126
795
10
87
237
TOTAL 7
17
15
PLUTO for Windows
Annual Report
domiv1 RUN NO 1
ACCESSIBILITIES AND PLANNING POLICY
%ACCESSIBILITY PROP. APPLICATIONS APPROVED
CAR USER NC USER HOUSING RETAIL COMMERCIAL
P OP
P OP
ZONE
1 69 99
61 55
0.50
0.50
0.50
2 69 99
61 55
0.50
0.50
0.50
3 72 97
52 48
0.50
0.50
0.50
4 82 97
16 14
0.50
0.50
0.50
5 81 95
9
9
0.50
0.50
0.50
6 82 93
5
5
0.50
0.50
0.50
7 83 92
5
5
0.50
0.50
0.50
8 85 93
4
5
0.50
0.50
0.50
9 80 88
3
4
0.50
0.50
0.50
10 78 87
3
3
0.50
0.50
0.50
16
PLUTO for Windows
Annual Report
domiv1 RUN NO 1
LAND USE DATA
HOUSEHOLDS
SPACE (KSQM)
CO
NCO NEW
ZONE
1 1695
2 4245
3 6770
4 9668
5 12980
6 13834
7 15893
8 16875
9 13934
1145
1683
2902
3707
3693
2841
2529
1472
1310
31
56
80
122
163
247
312
402
546
TOTAL
110630 21960 2607
RETAIL FLOOR COMMER. FL.
SPACE (KSQM)
TOTAL NEW TOTAL NEW
34
15
9
9
10
10
11
12
12
-1
0
0
0
0
0
1
1
356
215
117
63
63
65
62
81
61
-6
-2
1
3
3
3
3
3
3
134
4
1151
16
17
Annual Report
domiv1 RUN NO 1
PROJECT REPORTS
EXPENDITURE ON TRAFFIC CALMING THE LOCAL NETWORK
SO FAR IS 100 K$
EXPENDITURE ON SAFETY EDUCATION CAMPAIGNS SO FAR
IS: 500 K$
EXPENDITURE SO FAR ON NETWORK SAFETY
IMPROVEMENTS IS
FOR LINKS 1 TO 9 : 200 100 100 400 100 100 100 100 100
FOR THE TWO RINGROADS AND THE LOCAL NETWORK:
200 200 500
18
PLUTO for Windows
Annual Report
domiv1 RUN NO 1
MAJOR CONSTRUCTION PROJECTS(K$)
PROJ DESCR
NO
INVESTM
SO FAR
1 LINK 1 3000 PCU
2000
2 LINK 2 2800 PCU
0
3 LINK 3 3000 PCU
0
4 LINK 4 2400 PCU 10000
5 LINK 4 3200 PCU
0
6 LINK 5 3000 PCU
0
7 LINK 6 3000 PCU
0
8 RR1 3000 PCU
0
9 RR2 3000 PCU
0
10 RR1 INTERCH 3000 PCU
11 PARKING ZONE 1 +1000 LS
12 PARKING ZONE 2 +1000 LS
13 PARKING ZONE 3 +1000 LS
14 PARKING ZONE 4 +1000 LS
0
0
0
0
0
REQUIRED
INVESTM
/YR
18000
15000
15000
0
16000
8000
2000
15000
12000
22000
3000
2000
1200
1000
MAX STATUS
INVEST
10000 SHELVED
7500
7500
0 COMPLETE
8000
4000
1000
7500
6000
11000
3000
2000
1200
1000
19
Annual Report
domiv1 RUN NO 1
CAPITAL ACCOUNT (K$)
INHERITED BALANCE
8558
INTEREST ON DEPOSITS, (RATE = 4%)
CENTRAL GOVT GRANT
TOTAL INCOME
342
5199
5541
EXPENDITURE ON ENGINEERING PROJECTS
ROAD MAINTENANCE
BUS LANE CAPITAL
CAR PARK CAPITAL WORKS
PARK AND RIDE CAPITAL WORKS
TRAFFIC RESTRAINT CAPITAL WORKS
TRAFFIC MANAGEMENT CAPITAL WORKS
SAFETY AND TRAFFIC CALMING CAPITAL WORKS
TOTAL OUTGOINGS
-5100
-3814
0
0
0
0
0
-1300
-10214
NET TRANSFER
7408
BALANCE
11293
20
Annual Report
CURRENT ACCOUNT (K$)
INHERITED BALANCE
12876
INTEREST ON DEPOSITS, (RATE = 4%)
LOCAL TAXATION, (RATE = 15$/HEAD/YR)
COMMERCIAL TAXATION, (RATE = 400$/PROP./YR)
PARKING REVENUE
ROAD USER FEES
PARK AND RIDE REVENUE
TOTAL INCOME
515
3899
506
4039
0
0
8959
ADMINISTRATIVE AND STAFF COSTS
SUBSIDY TO BUS COMPANY
CAR PARK OPERATION COSTS
PARK AND RIDE OPERATIONS
TRAFFIC RESTRAINT OPERATION
TRAFFIC MANAGEMENT OPERATION COSTS
SAFETY CAMPAIGNS
BUS LANE OPERATION COSTS
TOTAL OUTGOINGS
NET TRANSFER
BALANCE
-5000
0
-1730
0
0
0
-100
0
-6830
-7408
7597
21
Annual Report
domiv1 RUN NO 1
RESOURCE COSTS (M$)
THIS PREVIOUS INTEREST
YEAR YEARS
ON PREV
YEARS
TRAVELLER TIME 443
439
18
RESOURCE COSTS
OF ACCIDENTS
8
9
0
COSTS OF CAR
OWNERSHIP
89
85
3
CAR OPERATING
COSTS
53
50
2
BUS OPERATING
COSTS
10
12
0
TOTAL
900
18
177
106
22
continued on next slide…
22
Annual Report
domiv1 RUN NO 1
/RESOURCE COSTS (M$)/
THIS PREVIOUS
YEAR YEARS
CAR PARK
LAND RENTAL
18
INTEREST ON
CAPITAL EXPENDIT. 0
POLICY OPERATION
AND ADMIN COSTS 5
TOTAL
626
INTEREST
ON PREV
YEARS
TOTAL
18
1
37
0
0
1
5
0
10
618
24
1271
CURRENT VALUE OF CAPITAL ASSETS (M$)
108
23
PLUTO for Windows
Annual Report
domiv1 RUN NO 1
PUBLIC OPINION REPORT
ROAD USERS APPALLED AT THE POOR STATE OF
MAINTENANCE
BUS USERS PROTEST NOT ENOUGH BUSES IN THE PEAK
BUS USERS PROTEST NOT ENOUGH OFF PEAK BUSES
PROTEST AT SHORTAGE OF LONG STAY PARK SPACES
PROTESTS OVER PEAK PERIOD CONGESTION
PROTESTS OVER BUSES SLOW SPEED IN PEAK
AT ELECTIONS YOU WOULD GET 57 % OF THE VOTE
/Best result is approx. 85 % /
INDEX OF BUSINESS CONFIDENCE = 79
/Best result is approx. 165)/
24
PLUTO for Windows
Have a successful work in
PLUTOPIA!
25
PLUTO for Windows