Presentation: SDG&E Transmission Improvements by Jim Avery

Download Report

Transcript Presentation: SDG&E Transmission Improvements by Jim Avery

SDG&E Transmission Improvements
Jim Avery
Chief Development Officer
ORANGE
CO.
Four 230 kV lines
to SCE
Trabuco
SDG&E Existing & Proposed
Transmission System
Margarita
Capistrano
Synchronous
Condensers
Laguna
Niguel
Cristianitos
RIVERSIDE CO.
Talega
SAN DIEGO CO.
Pala
Borrego
Monserate
SAN ONOFRE
NUCLEAR POWER PLANT
Rincon
Warners
San Luis Rey
Narrows
Lilac
Wellhead
Escondido
Valley
Center
Calpeak
Peaker
ENCINA
POWER PLANT
Ash
Escondido
Santa Ysabel
Esco
Lake
Hodges
SX-PQ
Palomar Energy
Poway
Boulder Creek
Pomerado
Suncrest
Reactive Support
Creelman
Penasquitos
Sycamore
Canyon
Alpine
Los
Coches
Descanso
Suncrest
Substation
MEF
Ocotillo
El Cajon
To El Centro
(IID)
Kumeyaay
Synchronous
Condenser
Glencliff
Loveland
Mission
Calpeak
Peaker
Old Town
Crestwood
Barrett
Miguel
Main Street
Bay Blvd.
Otay
Border00
Cameron
Boulevard
To North Gila
Substation
Arizona
Otay Lake
IMPERIAL VALLEY
ECO
MEXICO
TO TIJUANA
(CFE)
IV Flow
Controller
TO ROA (CFE)
2
Projects Approved in the 2012-13
Transmission Plan
Project
Talega Synchronous Condenser
Status
• Completing in-service testing
Exp. In –
Service
Date
2015
New 230 kV line from Sycamore • SDG&E selected to build March
to Penasquitos Substation
2014
• CPCN deemed Complete July 2014
• CPUC approval expected early 2016
2017
SONGS Switchyard Synchronous • Major equipment and contractor
Condenser
selection underway
• Site development to begin in 2015,
pending final approvals
2017
3
Projects Approved in the 2013-14
Transmission Plan
Project
Status
Exp. In –
Service
Date
San Luis Rey Synchronous
Condenser
• Site prep and major equipment
procurement underway
• Site development to begin in
2015
2017
Imperial Valley Phase Shifter
• Equipment design underway
• Construction expected to begin
in mid-2016
2017
Miguel Synchronous Condenser • Design and major equipment
procurement underway
Suncrest Static Var
Compensator
• CAISO awarded project to NEET
West, LLC
• System impact studies underway
2017
2017
4