Transcript 06/423r0

September 2006
doc.: IEEE 15-06-0423-00-003c
Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)
Submission Title: [TG3c Closing Report September 2006 Melbourne Australia]
Date Submitted: [21 September 2006]
Source: [Reed Fisher]
Company [Oki Electric Industry Co., Ltd.]
Address [2514 E. Maddox Rd., Buford, GA 30519 USA.]
Voice:[1-770-271-0529]
E-Mail:[[email protected]]
Re
: []
Abstract:[Description of TG3c September 2006 meeting proceedings ]
Purpose:[Report to 802.15 Closing Interim Meeting, 22 September 2006]
Notice :This document has been prepared to assist the IEEE P802.15. It is offered as a basis for
discussion and is not binding on the contributing individual(s) or organization(s). The material in
this document is subject to change in form and content after further study. The contributor(s)
reserve(s) the right to add, amend or withdraw material contained herein.
Release:The contributor acknowledges and accepts that this contribution becomes the property of IEEE
and may be made publicly available by P802.15.
TG3c
Slide 1
R. Fisher, Oki Electric Industry co. Ltd
September 2006
doc.: IEEE 15-06-0423-00-003c
TG3c 9th Meeting, Melbourne
Closing Report
22 September, 2006
TG3c
Slide 2
R. Fisher, Oki Electric Industry co. Ltd
September 2006
doc.: IEEE 15-06-0423-00-003c
1.
08:00 September 19. Call to order.
2.
TG3c Leadership:
Chair: R. Fisher.
vice Chair: A. Mathew
Secretaries : H. Ikeda, S-K Yong
3. Attendance:
Approx. 54-58 attendees in each slot
4.
Ten 2-hour time slots were allocated
Sep. 19
(Tue)
Sep. 20
(Wed)
Sep. 21
(Thu)
AM1
X
X
X
AM2
X
X
PM1
X
X
PM2
X
X
X
5. 18:00 September 21 Meeting adjourned
TG3c
Slide 3
R. Fisher, Oki Electric Industry co. Ltd
September 2006
doc.: IEEE 15-06-0423-00-003c
Meeting Accomplishments

Reviewed and updated channel modeling work.
Five LOS models and one NLOS model are defined.

Five Usage Models were reviewed and approved.

Heard four contributions on modulation, PHY
computer simulation, and 60GHz Power Amplifier.

Discussed and updated TG3c project timeline.
TG3c
Slide 4
R. Fisher, Oki Electric Industry co. Ltd
September 2006
doc.: IEEE 15-06-0423-00-003c
Contribution List
#
Title
Doc. #
1
tg3c-opening-introduction
06/373r1
- R. Fisher
2
15-3c-sep06-meeting-agenda-and-objectives
06/372r3
- R. Fisher
3
CHANNEL MODEL STATUS REPORT
06/037r4
- A. Mathew
4
merging-two-path-and-v-models-los-desktop-channel-environments.pdf
06/297r3
- H. sawada
5
LOS office channel model based on TSV model
06/377r2
- H. sawada
6
LOS residential channel model based on TSV model
06/393r0
- H. sawada
7
MATLAB code and its flowchart for TSV model
06/389r0
- H. Harada
8
channel-model-large-scale-and-small-scale-parameterization
06/400r1
- S. K. Yong
9
An MSK system for Mobile Multi-Gb/s at 60GHz, concept, application and implementation
06/392r2
- B. Gaucher
10
phy-layer-modulation-802-15-3c-system-level-issues
06/387r2
- A. Bourdoux
11
A scheme to evaluate PHY performance by computer simulation
06/386r1
- H. Harada
12
Behavior model of 60GHz power amplifier for system/PHY simulation
06/396r1
- C.S. Choi
13
Usage Model Document Status Report
06/146r4
- A. Sadri
14
Re-summarization of merged UMD parameters
06/379r2
- C.S. Choi
15
summary-usage-model
06/369r6
- A. Sadri
16
usage-model-document-comments-final-draft-bosco
06/399r1
- J. Barr
17
summary-available-channel-models
06/411r0
- A. Seyedi
18
tg3c-technical-requirement-sub-group-report.ppt
05/430r10
- A. Seyedi
19
tg3c-project-plan.
05/311r9
- A. Seyedi
TG3c
Slide 5
Presented by
R. Fisher, Oki Electric Industry co. Ltd
September 2006
doc.: IEEE 15-06-0423-00-003c
05/311r9
Plan to Get to Baseline Document
• 09/06 (Melbourne, Aus.) - Continued channel model discussions. Continued
development of UMD.
Future plan:
• 11/06 (Dallas TX) – Finalize channel model. Finalize channel model
document. Finalize UMD document. Finalize Technical Requirements. Issue
CFP. Continue MAC discussions and make recommendation for MAC
development.
• 01/07 (London, UK) – Presentation of preliminary proposals.
• 03/07 (Orlando, FL) – Final proposals due 1 week prior to meeting.
Presentation of all proposals.
• 05/07 (Montreal, CA) – Present updated/merged proposals. Down selection
begins. If down-selection finishes, begin drafting Standard.
TG3c
Slide 6
R. Fisher, Oki Electric Industry co. Ltd
September 2006
doc.: IEEE 15-06-0423-00-003c
05/311r9
Ballot plan
•
•
•
•
•
TG3c
07/07 – First letter ballot
09/07 – Re-circulation
11/07 – 802 Sponsor ballot
01/08 – 802 Sponsor re-circulation
03/08 – Standard finished.
Slide 7
R. Fisher, Oki Electric Industry co. Ltd
September 2006
doc.: IEEE 15-06-0423-00-003c
TG3c Timeline
TG3c Timeline
(Based on 05/311r9 Project timeline)
5
x
6
7
Task Group Formed
Call for application created July 2004
x
Call for intent(CFI) to propose
x
System requirements document
Selection criteria document
x
Channel Models creation
Channel Models Release
Down-selection procedure document
Usage Model Document(UMD)
MAC related System Attributes
Recommendation for MAC modification
Call for proposal issued
Present preliminary proposals
Present all final proposals
Present updated/merged proposals
Down Selection started
Down Selection finished
Draft Baseline completed
1st letter ballot completed
Resolution of comments completed
Re-circulation completed
Resolve re-circulation comments
TG3c
2005
8 9 10 11 12 1
x
x
2
5
2006
6 7
x
x
x
x
x
x
x
x
x
x
3
4
8
9 10 11 12 1
x
x
x
x
x
x
x
x
x
x
x
x
x
2007
2 3 4
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Slide 8
R. Fisher, Oki Electric Industry co. Ltd