Transcript 802.11

doc.: IEEE 802.11-09/0657r0
July 2009
WG11 Snapshot July ‘09
Date: 2009-07-11
Authors:
Name
Company
Address
Phone
email
Bruce Kraemer
Marvell
5488 Marvell Ln
Santa Clara, CA
95054
+1-321-4274098
[email protected]
Submission
Slide 1
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-09/0657r0
July 2009
WG11 Task & Study Group Officers
Group
Chair
Vice Chair
Technical Editor
Secretary
WG11
Bruce Kraemer
Jon Rosdahl
Adrian Stephens
Terry Cole
Stephen McCann
Mb
Matthew Gast
Michael Montemurro
Adrian Stephens
Jon Rosdahl
N
Bruce Kraemer
Sheung Li
Adrian Stephens
Jon Rosdahl
P
Lee Armstrong
none
Wayne Fisher
Susan Dickey
S
Donald Eastlake
none
Kazuyuki Sakoda
Stephen Rayment
U
Stephen McCann
none
Necati Canpolat
-OPEN-
V
Dorothy Stanley
none
Emily Qi
-OPEN-
W
Jesse Walker
none
Nancy Cam-Winget
-OPEN-
Z
Menzo Wentink
none
Menzo Wentink
Daniel Borges
AA
Ganesh Venkatesan
Alex Ashley
Hang Liu
-OPEN-
AC
Osama Aboul-Magd
Menzo Wentink, Joonsuk Kim
-NYRQ-
-OPEN-
AD
Eldad Perahia
Vinko Erceg, John Barr
-NYRQ-
-OPEN-
ARC
David Bagby
Darwin Engwer
JTC1
Jesse Walker
NYRQ = Not yet required, nominations are not open
Submission
OPEN = Candidate Nominations are open
Slide 2
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-09/0657r0
July 2009
July 2009 WG11 Task & Study Group Officers
Group
Chair
Vice Chair
Technical Editor
Secretary
WG11
Bruce Kraemer
Jon Rosdahl
Adrian Stephens
Terry Cole
Stephen McCann
Mb
Matthew Gast
Michael Montemurro
Adrian Stephens
Jon Rosdahl
N
Bruce Kraemer
Sheung Li
Adrian Stephens
Jon Rosdahl
P
Lee Armstrong
none
Wayne Fisher
Susan Dickey
S
Donald Eastlake
none
Kazuyuki Sakoda
Stephen Rayment
U
Stephen McCann
none
Necati Canpolat
-OPEN-
V
Dorothy Stanley
none
Emily Qi
-OPEN-
W
Jesse Walker
none
Nancy Cam-Winget
-OPEN-
Z
Menzo Wentink
none
Menzo Wentink
Daniel Borges
AA
Ganesh Venkatesan
Alex Ashley
Hang Liu
-OPEN-
AC
Osama Aboul-Magd
Menzo Wentink, Joonsuk Kim
-NYRQ-
-OPEN-
AD
Eldad Perahia
Vinko Erceg, John Barr
-NYRQ-
-OPEN-
ARC
David Bagby
Darwin Engwer
JTC1
Jesse Walker
NYRQ = Not yet required, nominations are not open
Submission
OPEN = Candidate Nominations are open
Slide 3
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-09/0657r0
July 2009
WG11 Editor Abstract / Agenda – July 2009
•
•
•
•
•
•
Roll Call / Contacts / Reflector
Go round table and get brief status report
Review action items from previous meeting
Numbering Alignment process
Amendment Ordering / ANA Status / Draft Snapshots
MB (87% approval) discussion
– 15 mins
• Conference Calls
Submission
Slide 4
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-09/0657r0
July 2009
July/2009
WNG SC – Meeting Goals July 09
• Review WNG SC Plans
• Scheduled Presentations
–
–
–
–
–
–
–
802.11 Energy Consumption and Policy - Nordman
QoS for Management Frames - McCann
Enhancement Technology for vehicular communications - Cho
WLAN Public Easements - Paine
802.11 in TVWS - Kennedy
Enhanced Security for 802.11i - Harkins
Broadband V2I Access for High Speed Transportation - Morioka
Submission
Slide 5
BruceTK
Kraemer
Tan (GCT
(Marvell)
Semi)
doc.: IEEE 802.11-09/0657r0
July 2009
IEEE 802.11 ARC SC – July 2009
• Held conference calls since March sessions
– Provided update on MIB usage recommendation activity in May
• This week
– Further MIB var recommendation discussion with .11 chairs
– Continue work on MAC model
– Discuss low .11 attendance impact on ARC
• Agenda in document 11-09-xxxx
Submission
Slide 6
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-09/0657r0
July 2009
TGmb July 2009 Summary
• LB 149 closed June 27, 2009
– 87% approval
– 730 comments received and recorded in 11-09/0706r1
• 9 ad hoc groups will process comments
– General, Editorial, Security, MAC operation, MAC management,
framing and architecture, SAP, PHY and regulatory, and MIB
– Some comments have been identified as potentially wide-ranging,
and have scheduled discussions on the agenda (11-09/0732r0)
• Editorial coordination meeting to be held Wednesday
PM2 to synchronize baseline and post-REVmb
amendments
Submission
Slide 7
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-09/0657r0
July 2009
IEEE 802.11n – July 2009
Completed Recirculation Sponsor ballots #3, 4, 5 on
Drafts 10 , 11 during May, June and July
– 20, 15, 1 comments received
• Comment resolutions completed on conference calls
• Primary session activity will be finalization of EC
package
• Goals
– Present request to EC to submit D11.0 to
RevCom/Standards Board September 9-11 (July 31
submission deadline)
• TGn meeting report is submission 11-09/0659
Submission
Slide 8
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-09/0657r0
July 2009
July2009
TGp Snapshot for July 2009
LB 151 passed
• 158 affirmative votes
• 27 negative votes
• 26 abstention votes
• ====
• 211 votes received
180 comments, 96 are editorial
6 time slots this week
Proposed resolution for most comments prepared and
discussed in teleconferences
Should complete comment resolutions this week, go to
recirculation ballot
Submission
Slide 9
Lee Armstrong (Armstrong
Bruce Kraemer
Consulting,
(Marvell)
Inc.)
doc.: IEEE 802.11-09/0657r0
July 2009
IEEE 802.11u – July 2009
•
•
•
•
•
Review of Teleconferences meetings
LB 152 Re-circulation Comment Resolution
Preparation for Sponsor Ballot
Liaisons (incoming and outgoing)
Agenda in document 11-09-0679r0
Submission
Slide 10
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-09/0657r0
July 2009
IEEE 802.11v – July 2009
• Held 6 con calls since May 2009 session
– Notes in 11-09-0677-05
• This week
– Complete LB 150 Comment Resolution
– Recirculation Letter Ballot
– Conditional approval for Sponsor Ballot
• Agenda in document 11-09-0675
Submission
Slide 11
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-09/0657r0
July 2009
TGw July Meeting Status & Objectives
• P802.11w D11.0 completed Sponsor Ballot
Recirculation with no comments received
– We are done
• TGw to meet only once, on Wednesday PM2
– Agenda: motion to petition ExCom to progress P802.11w to
RevCom for publication
Submission
Slide 12
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-09/0657r0
July 2009
IEEE 802.11z – July 2009
• The main goal for this meeting is to resolve the
comments received on the second recirculation ballot
on TGz draft 5.0 (LB153z)
– LB153z passed with 92% approval rate
– Currently at 94% approval rate, due to after ballot changes
– We received 97 comments
• TGz has 5 timeslots this week
• We expect to start a third TGz recirculation ballot after
this meeting on TGz draft 6.0
• We will be working on a request to ExCom for
conditional approval to start a sponsor ballot
Submission
Slide 13
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-09/0657r0
July 2009
IEEE 802.11aa – San Francisco (July, 2009)
•
•
Since the Montreal session:
• 3 Teleconferences.
Goals for the SFO Session:
• OBSS


•
Joint meeting with 802.1AVB:



•
•
•
•
Converge on the TGaa solution to OBSS
Discuss TGaa goals for OBSS with TGac
TSpec mapping
Triggered 802.11k traffic stream/category statistics
Other requirements on 802.11 that may be useful to AVB
Resolve comments from Internal review of Draft D0.01
Review timeline
PAR Scope Review
Opening Report/Agenda in document 11-09-0667r0
Submission
Slide 14
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-09/0657r0
July 2009
IEEE 802.11ac – July 2009
• 09-059r4 is the baseline document for the selection
procedure.
• 09-0161r2 is the baseline document for the usage models.
• 09-308r2 is the baseline document for the channel models
addendum.
• Continue the work on functional requirements and
evaluation. methodology (09-0451r2).
• Started the discussion on the Specification Framework
document.
• Technical submissions and technical presentations
• Review with Tgaa issues related to OBSS
• Agenda in document 11-09-0723r0
Submission
Slide 15
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-09/0657r0
July 2009
TGad – July Meeting Goals
• Continue working on task group documents
– Contributions to improve existing documents
– Set timeline for completion of documents
• Technical contributions
• Joint meeting with 802.15.3c on Wed PM2
Submission
Slide 16
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-09/0657r0
July 2009
JTC1 Ad Hoc July Meeting Status
• Issues arising from Tokyo SC6 meeting
– China will fast track a WAPI independent standard
• Has asked for a copyright release from IEEE
– SC6 member countries opposed to FDIS fast tracks as
provided by the PSDO
• Feel this grants IEEE more rights than member countries
• Seek candidates to chair JTC1 Ad Hoc after July
IEEE 802 meeting
Submission
Slide 17
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-09/0657r0
July 2009
Submission
Slide 18
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-09/0657r0
July 2009
LB149
•
•
•
"Should P802.11mb D1.0 be forwarded to Sponsor Ballot?".
Ballot Opening Date: Monday
May 18, 2009 - 23:59 ET
Ballot Closing Date: Saturday Jun 27, 2009 - 23:59 ET
RESPONSE RATE:
246 eligible people are in this ballot group.
155 affirmative votes
23 negative votes
29 abstention votes
===
207 votes received = 84.15% valid returns
= 14.01% valid abstentions
•
•
APPROVAL RATE:
155 affirmative votes
= 87.08 % affirmative
23 total negative votes = 12.92 % negative
The 75% affirmation requirement has been met, Motion passes.
There were 730 comments received.
Submission
Slide 19
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-09/0657r0
July 2009
LB150
•
Should P802.11v D6.0 be forwarded to Sponsor Ballot?
•
Ballot Opening Date: Thursday
Ballot Closing Date:
Friday
RESPONSE RATE:
•
May 28, 2009 - 23:59 ET
June 12, 2009 - 23:59 ET
254 eligible people are in this ballot group.
•
•
•
172 affirmative votes
20 negative votes
38 abstention votes
===
230 votes received = 90.55% valid returns
= 16.52% valid abstentions
APPROVAL RATE:
172 affirmative votes
=
89.58 % affirmative
20 total negative votes =
10.42 % negative
The 75% affirmation requirement has been met, Motion passes.
There were 140 comments received.
Submission
Slide 20
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-09/0657r0
July 2009
•
•
•
LB151
Should P802.11p D7.0 be forwarded to Sponsor Ballot?".
Ballot Opening Date: Friday
May 29, 2009 - 23:59 ET
Ballot Closing Date: Saturday Jun 13, 2009 - 23:59 ET
RESPONSE RATE:
232 eligible people are in this ballot group.
158 affirmative votes
27 negative votes
26 abstention votes
===
211 votes received = 90.95% valid returns
= 12.32% valid abstentions
•
•
APPROVAL RATE:
158 affirmative votes
= 85.41 % affirmative
27 total negative votes = 14.59 % negative
The 75% affirmation requirement has been met, Motion passes.
There were 184 comments received.
Submission
Slide 21
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-09/0657r0
July 2009
LB152
•
•
•
Should P802.11u D7.0 be forwarded to Sponsor Ballot?".
Ballot Opening Date: Friday
Jun 04, 2009 - 23:59 ET
Ballot Closing Date: Friday
Jun 19, 2009 - 23:59 ET
RESPONSE RATE:
213 eligible people are in this ballot group.
142 affirmative votes
19 negative votes
33 abstention votes
===
194 votes received = 91.08% valid returns
= 17.01% valid abstentions
•
•
•
APPROVAL RATE:
142 affirmative votes
= 88.20 % affirmative
19 total negative votes = 11.80 % negative
The 75% affirmation requirement has been met, Motion passes.
There were 225 comments received.
Submission
Slide 22
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-09/0657r0
July 2009
LB153
•
•
•
"Should P802.11z D5.0 be forwarded to Sponsor Ballot?". Ballot
Opening Date:
Monday
Jun 08, 2009 - 23:59 ET
Ballot Closing Date: Tuesday
Jun 23, 2009 - 23:59 ET
RESPONSE RATE:
254 eligible people are in this ballot group.
183 affirmative votes
15 negative votes
34 abstention votes
===
232 votes received = 91.34% valid returns
= 14.66% valid abstentions
•
•
•
APPROVAL RATE:
183 affirmative votes
= 92.42 % affirmative
15 total negative votes = 07.58 % negative
The 75% affirmation requirement has been met, Motion passes.
There were 97 comments received.
Submission
Slide 23
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-09/0657r0
July 2009
TGn - Sponsor Ballot Recirc #3
• IEEE P802.11n 15 day Recirculation Sponsor Ballot #3 asked the
question “Should P802.11n Draft 10.0 be forwarded to RevCom?”
• Ballot Opening Date: Friday
May 15 , 2009 - 23:59 ET
Ballot Closing Date: Saturday May 30, 2009 - 23:59 ET
• RESPONSES:
277 eligible people are in this ballot group.
190 affirmative votes
26 negative votes
17 abstention votes
=======
237 votes received = 86 % valid returns
= 7 % valid abstentions
APPROVAL RATE:
190 affirmative votes
=
26 total negative votes =
Submission
88.0 % affirmative
12.0 % negative
Slide 24
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-09/0657r0
July 2009
TGn - Sponsor Ballot Recirc #4
• IEEE P802.11n 15 day Recirculation Sponsor Ballot #4 asked the
question “Should P802.11n Draft 11.0 be forwarded to RevCom?”
• Ballot Opening Date: Friday
Ballot Closing Date: Saturday
June 05 , 2009 - 23:59 ET
June 20, 2009 - 23:59 ET
• RESPONSES:
277 eligible people are in this ballot group.
195 affirmative votes
22 negative votes
17 abstention votes
=======
238 votes received = 83 % valid returns
= 7 % valid abstentions
APPROVAL RATE:
195 affirmative votes
=
22 total negative votes =
Submission
89.9 % affirmative
10.1 % negative
Slide 25
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-09/0657r0
July 2009
TGn - Sponsor Ballot Recirc #5
• IEEE P802.11n 10 day Recirculation Sponsor Ballot #5 asked the
question “Should P802.11n Draft 11.0 be forwarded to RevCom?”
• Ballot Opening Date: Tuesday
Ballot Closing Date: Friday
June 23 , 2009 - 23:59 ET
July 03, 2009 - 23:59 ET
• RESPONSES:
277 eligible people are in this ballot group.
198 affirmative votes
20 negative votes
17 abstention votes
=======
238 votes received = 86 % valid returns
= 7 % valid abstentions
APPROVAL RATE:
198 affirmative votes
=
20 total negative votes =
Submission
90.8 % affirmative
9.2 % negative
Slide 26
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-09/0657r0
July 2009
TGW SB3
•
•
•
•
“Should P802.11w Draft 10.0 be forwarded to RevCom?”
Ballot Opening Date: Sunday
Ballot Closing Date: Sunday
RESPONSE RATE:
May 31 , 2009 - 23:59 ET
June 14, 2009 - 23:59 ET
148 eligible people are in this ballot group.
107 affirmative votes
8 negative votes
9 abstention votes
=======
124 votes received = 83.8 % valid returns
= 7.3 % valid abstentions
•
•
APPROVAL RATE:
107 affirmative votes
=
93.0 % affirmative
8 negative votes
=
7.0 % negative
Motion passes
15 comments received have been posted in document 11-09-0683 r0
Submission
Slide 27
Bruce Kraemer (Marvell)
doc.: IEEE 802.11-09/0657r0
July 2009
TGW SB4
•
•
•
•
“Should P802.11w Draft 11.0 be forwarded to RevCom?”
Ballot Opening Date: Thursday June 18 , 2009 - 23:59 ET
Ballot Closing Date: Sunday
June 28, 2009 - 23:59 ET
RESPONSE RATE:
148 eligible people are in this ballot group.
110 affirmative votes
6 negative votes
9 abstention votes
=======
125 votes received = 84.5 % valid returns
= 7.2 % valid abstentions
•
•
APPROVAL RATE:
110 affirmative votes
= 94.8 % affirmative
6 negative votes
=
5.2 % negative
Motion passes
Zero comments were received during this ballot.
Submission
Slide 28
Bruce Kraemer (Marvell)