Objective
• Provide requirements for Age Hardened Nickel
Base alloys used in the manufacture of API 6A
pressure-containing and pressure-controlling
components to assure they are not embrittled by
the presence of an excessive level of deleterious
phases and meet minimum metallurgical quality
requirements.
• These additional requirements include detailed
process control requirements and detailed
testing requirements.
Participants
Patrick Markle
Adran Mills
Bill Bailey
Josh Rooker
Steven Shademan
Kevin Johnson
Paul Maxwell
James Buchanan
John Farraro
Gus Mangaly
Al Gavenas
Brian Wilfahrt
Joel Russo
Stan Gregory
Veronica Vasquez
Eric Caldwell
ATI Allvac
ATI Allvac
Baker Hughes
Bohler Edelstahl
BP
Cameron
Carpenter
Chevron
Chevron
Dril-Quip
Energy Alloys
ExxonMobil
FMC
Foroni Metals
Foroni Metals
GATE, LLC
Tim Haeberle
Greg Chitwood
John Sisk
Abhay Singh
John Elwell
Suresh Nath
Carl Stroud
Kleber Sernik
Rashmi Bhavsar
Brett Puckett
Deba Maitra
Steve Tassen
Marco Deuterio
John Groth
Al Coffey
William Howie
GE Oil & Gas
Halliburton
Halliburton
Hamilton Metals
Howco Group
Howco Group
Latrobe Specialty Steel
Latrobe Specialty Steel
Schlumberger
Shell
Special Metals
Special Metals
Special Quality Alloys
ThyssenKrupp VDM
Tube Supply
Weatherford
Meetings
• September 27, 2011
• November 29, 2011
• April 18, 2012
Progress
Definition of Scope and Purpose
Chemical Compositions
Manufacturing Requirements
Heat Treatment Procedures
Hardness Requirements
To Be Done
• Finalize Mechanical Property Requirements
– Test Orientation
– Properties for Sizes >10 in.
• Develop an Appropriate Hardness Conversion Table
• Develop Hardness Re-Test Procedure
• Develop Grain Size & Microstructure Requirements
including Photomicrographs
• Determine Whether Additional Testing will be Required to
Validate Requirements
Next Meeting
Anticipated to be in August
Goal to Ready for Ballot