Document 7717994

Download Report

Transcript Document 7717994

Quality Assurance Test Stand
University of Rochester
o QTC at Rochester, NY
• What’s new compared to KSU


Vacuum Base Chuck Positioner
Extra switch to decouple guard box
o Test crosscheck
• 5 Test Structures

Tested by Vienna, Karlsruhe QTC

Tested by Perugia QTC
• 2 OB2 sensors
o Handling the results
• Data Base
o Conclusion, plans
October 7, 2003
US Silicon Tracker group
Sergey Korjenevski
University of Rochester
1
Setup is completed
 Hardware is in
October 7, 2003
US Silicon Tracker group
Sergey Korjenevski
University of Rochester
place and
operational.
 Software is
working as well, test results are
consistent with
other testing
centers (more
details later).
 Clean room is to
be completed by
20th of October.
2
Personnel
•
•
•
•
•
•
Regina Demina (585) 275-7357
Thomas Ferbel (585) 275-4396
Elizabeth A. Groves (585) 275-4001
Sergey Korjenevski (585) 275-8550
David R. Martell (585) 275-5938
Daniel Schwaab (585) 275-4394
October 7, 2003
US Silicon Tracker group
Sergey Korjenevski
University of Rochester
3
List of the Equipment
• Probe Station Alessi REL-6142 8 in. guarded
chuck, Semi-Auto
• Microscope Mitutoyo 2x 10x 20x, 10x
• Vacuum base positioners with 4 coax probes
• Needles diameter 5 m
• LCR HP 4284A
• V-source/Ammeter Keithley 237 and Keithley 487
• Switching Matrix Agilent 34970A with two 8x4
switch 34904A
• Vibration-free table Kinetics 1201
• Custom made dark box
October 7, 2003
US Silicon Tracker group
Sergey Korjenevski
University of Rochester
4
New Features
• Solid stable
location of the
chuck positioner.
• Significant to
ensure safety and
helps to
minimize noise
October 7, 2003
US Silicon Tracker group
Sergey Korjenevski
University of Rochester
5
New Features
• New switch is
added to discharge
decoupling
capacitors.
• Significant to
ensure safety and
helps to minimize
noise.
October 7, 2003
US Silicon Tracker group
Sergey Korjenevski
University of Rochester
6
Cross Check, - Full strip tests
• Two OB2 sensors, ST, tested by Perugia
– 30210420275924
– 30210414739923
• 5 Test Structures, HPK
–
–
–
–
–
60548-050
60548-051
60549-055
60550-065
60551-087
October 7, 2003
from
from
from
from
from
Karlsruhe
Karlsruhe
Vienna
Vienna
Vienna
US Silicon Tracker group
Sergey Korjenevski
University of Rochester
7
IV Test
IV Test St 60548-050
18
16
14
Current, nA
12
10
UR
KRLS
8
6
4
2
0
0
October 7, 2003
100
200
300
400
Volt Tracker group
US Silicon
Sergey Korjenevski
University of Rochester
500
600
8
IV Test
IV TestSt 60550-065
12
10
Current, nA
8
Rochester
Vienna
6
4
2
0
0
100
200
300
400
500
600
Volt
October 7, 2003
US Silicon Tracker group
Sergey Korjenevski
University of Rochester
9
CV Test
1/C^2, ST 30210414739923
0.00000045
0.0000004
0.00000035
0.0000003
Vdepl=150V
UofR
Perugia
UofR 10-03
0.00000025
0.0000002
0.00000015
0.0000001
0.00000005
0
0
October 7, 2003
50
100
150
200
Volt
250
US Silicon Tracker group
Sergey Korjenevski
University of Rochester
300
350
400
10
CV Test
1/C^2 Test St 60548-050
0.00004
0.000035
0.00003
0.000025
UR
KRLS
0.00002
0.000015
0.00001
0.000005
0
0
October 7, 2003
50
100
150
200 group250
US Silicon
Tracker
Sergey Korjenevski
University of Rochester
300
350
11
Strip tests - Leakage
Strip Leakage, Test St 60548-050
0.4
0.35
0.3
Current, nA
0.25
UR
KRLS
0.2
0.15
0.1
0.05
0
0
20
40
60
80
100
120
140
Strip #
October 7, 2003
US Silicon Tracker group
Sergey Korjenevski
University of Rochester
12
Strip tests - Leakage
Strip Leakage, Test St 605551-087
0.12
0.1
Current, nA
0.08
vienna
Rochester
0.06
0.04
0.02
0
0
20
40
60
80
100
120
140
Strip #
October 7, 2003
US Silicon Tracker group
Sergey Korjenevski
University of Rochester
13
Strip tests - Rpoly
Rpoly, Test Structure 60548-050
1.96
1.95
1.94
1.93
1.92
UR
KRLS
1.91
1.9
0
October 7, 2003
20
40
60
80
US Silicon Tracker group
Sergey Korjenevski
University of Rochester
100
120
140
14
Strip tests - Rpoly
Rpoly, ST 30210414739923
1.34
1.32
1.3
R, MOhm
1.28
1.26
Perigua
UofR
1.24
1.22
1.2
1.18
1.16
0
October 7, 2003
100
200
300
400
Strip #Tracker group
US Silicon
Sergey Korjenevski
University of Rochester
500
600
15
Strip tests - Cac at 100Hz
Coupling AC, ST 30210414739923
600
580
560
540
C, pF
520
UofR
Perugia
500
480
460
440
420
400
0
100
200
300
400
500
600
Strip #
October 7, 2003
US Silicon Tracker group
Sergey Korjenevski
University of Rochester
16
Strip tests - Cac at 100Hz
Coupling AC, Test St 60548-050
99
98
C, pF
97
KRLS
UR
96
95
94
93
0
20
40
60
80
100
120
140
Strip #
October 7, 2003
US Silicon Tracker group
Sergey Korjenevski
University of Rochester
17
Strip tests - Idiel
Pinhole Test, ST 30210414739923
10
9
8
Current, nA
7
6
Perugia
UofR
5
4
3
2
1
0
0
100
200
300
400
500
600
Strip #
October 7, 2003
US Silicon Tracker group
Sergey Korjenevski
University of Rochester
18
Strip tests - Idiel
Pinhole Test, ST 30210414739923
0.2
0.18
0.16
Current, nA
0.14
0.12
Perugia
UofR
0.1
0.08
0.06
0.04
0.02
0
0
October 7, 2003
100
200
300
400
Strip
#
US Silicon
Tracker
group
Sergey Korjenevski
University of Rochester
500
600
19
Data Base
• We were not able to simulate data handling with
fictitious names though we believe our .xml
format is correct. The problem may disappear as
we proceed with real actions.
• Error:
–
–
–
“DB: ERROR: fatal error: 0RA-02291: integrity constraint (CMSTRKDB.REF_INPUT14)
violated – parent key not found
ORA-06512: at “CMSTRKDB.STORED_FUNCTIONS”, line 788
ORA-06512: at line 1
– …error goes on to list the text in the file. It is not just
IV_TEST in particular. If this test is deleted and it goes
straight to CV, the problem basically is repeated.
October 7, 2003
US Silicon Tracker group
Sergey Korjenevski
University of Rochester
20
Conclusions and Plans
• QTC at University of Rochester complies with
CMS requirements to test Si detectors.
• Rate of the testing is estimated to be 2 OB2
sensors per day.
• Data Base remains an issue. The problem may
disappear if everything is done in proper order
using appropriate bar codes and all.
October 7, 2003
US Silicon Tracker group
Sergey Korjenevski
University of Rochester
21