DOE PROGRAM REVIEW BNL Physics Department S. Dawson
Download
Report
Transcript DOE PROGRAM REVIEW BNL Physics Department S. Dawson
DOE PROGRAM REVIEW
BNL
Physics Department
S. Dawson
April 18, 2006
Overview of Talk
Physics synopsis
•
•
•
•
Colliders (ATLAS/D0/ILC)
Neutrinos (MINOS/Reactor)
Theory
Future aspirations
Staffing trends/Budgets
Conclusions
2
Big Picture in the Physics Department
ATLAS is transitioning from construction to the
Research Program
• Development of Analysis Support Center at BNL
• Focus is on PHYSICS
– Computing and software to get there!
RSVP cancelled in August, 2005
• Major planning exercise and redirection of program
3
Planning Exercise
Internal discussions of varied options
• Open process with large participation
• Clear that a healthy experimental program is broader
than ATLAS alone
• Also clear that our program needs to be focused on
areas where BNL can make unique contributions
• BNL program must reflect national priorities
Seminars
• ILC, Braidwood, Daya Bay…
• Many options considered
4
Physics Department Priorities
Experiments: Collider Physics and Neutrinos
• ATLAS is our top priority (small D0/ILC efforts)
• Neutrino effort building up (MINOS/Reactor)
Accelerator R&D
• See Vitaly Yakimenko’s talk
Theory
• Mainly LHC phenomenology & lattice QCD
Detector R&D: Developing new technology
• ILC detector R&D
• ATLAS upgrades
5
Kudos
Sam Aronson, Fellow of AAAS
• For leadership in the science and management of
experimental particle physics, especially heavy ion
physics at Brookhaven National Laboratory
Yannis Semertzides, Fellow of APS
• For leadership in the development of electrostatic
quadrupoles and transient magnetic field
measurements and for analysis of the muon g-2
experiment
6
ATLAS - Overview
Construction is completing and BNL’s leading
role in this has been a big success
• Cathode Strip Chambers shipped to CERN
Technical Coordination
• U.S. is playing a vital role under David Lissauer’s leadership
M&O: Pre-operation testing of detector
components
7
ATLAS - Overview
Progress in computing software and hardware
• Tier 1 Computing Center is building up
• BNL computer professionals making important
contributions to the ATLAS software
• Initiation of PanDa (Production and Distributed
Analysis)
Physics Analysis
• BNL’s Analysis Support Center is up and running
– Many tutorials, meetings and visitors in the last year
– Helps US ATLAS community to use ATLAS software
8
Physics at ATLAS
Kranmer
9
ATLAS @ BNL
Future Plans
• Analysis Support Center will continue to expand as
budget permits
• Emphasis on Tier 1 and core software
• R&D on ATLAS upgrade
- Work with Instrumentation Division on tracking devices
which can withstand a factor of 10 greater luminosity
If we get an increase in funding, we will
use it for new hires for ATLAS analysis
10
D0
D0 effort small at 2.8 physicists
• Effort will gradually transition to ATLAS
• Transition date planned for end of 2008
BNL responsibilities in D0
• Forward pre-shower hardware and software
• Leadership of ID group
11
ILC R&D
New ILC R&D detector effort
• Within Collider Physics group
• Part of US ILC detector effort
– Work on far forward ( < 140 mrad) calorimetry
– Luminosity normalization from forward Bhabba pairs
– Instantaneous luminosity from beamsstrahlung gammas
• BNL role in Experiment Conceptual Design
– Have joined SiD detector concept study
– Simulation and integration studies
• Physics Dept effort coordinated with BNL
Instrumentation Division and SMD effort
12
Results from MINOS
m2 0.0031 0.0006 (stat ) 0.0001 ( sys ) eV 2
BNL physicists lead NuMI beamline
commissioning, monitoring, and data logging
13
Neutrino Effort
MINOS
• Ramps down in 2010 (?)
• 4.9 physicist FTEs
– Increased by 1 after RSVP cancellation
– LDRD supported 1.8 FTEs in FY05, who are
now on core funding
– Group is at optimal size
• Additional physicist effort allows increased
analysis role
– Search for e appearance in far detector
14
Reactor Experiment
Precision measurement of sin2213
BNL has joined Daya Bay Experiment
3 yrs running
15
Reactor Experiment to Measure 13
Visit to Daya Bay (Feb 11-18)
– Focus on formal collaboration issues
- US. Co-spokesman, K. Luk
- Executive Board, US representatives, Luk/McKeown
- Institutional Board, BNL representative, Kettell
– Developing BNL role
- BNL has large representation on task forces which will
finalize design
• BNL might provide Muon Tracker, simulations,
project management
BNL Chemistry department will provide Gd loaded
liquid scintillator
16
@ Daya Bay
17
Very Long Baseline Neutrino Experiment
Neutrinos from FNAL to DUSEL
• Large detector and beam will be proposed
separately from DUSEL
• Could use upgraded beam from Fermilab with ~1
MW
• Construction of large detector 2010-2017?
• National Effort
– Workshop with FNAL March 6-7, 2006
– Start of BNL/FNAL physics study of very long baseline
experiments
– What are physics trade-offs of various detector/beam
options?
18
Possible timeline for Neutrino Efforts
MINOS:
Data taking and analysis
Data taking
Construction
Data taking
2015
2005
VLBNO: R&D
Construction
2010
Reactor:
19
Physics Department Experimental Efforts
1 FTE
LSST
ILC Detectors (SiD Collaboration)
13.1
FTE
D0
ATLAS
MINOS
4.9
FTE
Reactor (Daya Bay)
2015
2010
2005
VLBLNO
20
Theory
Group is oriented towards phenomenology
•
•
•
•
•
LHC, ILC, Neutrino physics
Higher order QCD corrections
Higgs physics
Supersymmetry
3 post-docs
Krupovnickas
21
Theory
Lattice gauge theory for weak interaction
matrix elements
Direct benefit from interactions in
department
– RBRC Center (~ 5 Lattice post-docs, many
visitors, QCDOC computer)
– Karsch Lattice Gauge Theory Group (~6
physicists) focussed on finite temperature QCD
22
Kaons
E949, K++
– Last ran in 2002
– Possibility to send some detector components to JPARC: depends on Japanese funding
– Final data analysis complete in coming year
– Recent physics results:
- hep-ex/0506028: BR(0) < 2.7 x 10-7
- Phys. Rev. D 72, 091102 (2005)
- hep-ex/0505069: BR(K+ +) < 8.3 x 10-9
- Physics LettersB623, 192 (2005)
23
Other Issues
g-2 awaits P5 decision in September, 05
– If g-2 goes forward, BNL physicists will play
important roles
Small LSST effort formed
– 1 core FTE + 1 FTE funded by lab
– Work on camera sensors for LSST with
Instrumentation
– Requires strategic hire of experimental astrophysicist
and build up of engineering effort for success
24
Small number of Post-docs
All groups need more post-docs to reach their full
potentials
Year
00
01
02
03
04
05
06
Theory
3
3
2
3
3
3
3
Colliders
3
4
4
4
2
2
2
/K
ATF
1
1
1
2
2
2
2
2
3
2
1
1
1
2
Total
8
10
10
11
10
7
8
25
Shrinking Technical Staff
Technicians in Physics Department
18
16
14
12
10
8
6
4
2
0
LHC Project
Core Research
FY02
FY03
FY04
FY05
Engineers in Physics Department
20
18
16
14
12
10
8
6
4
2
0
FY06
LHC Project
Core Research
FY02
26
FY03
FY04
FY05
FY06
Staffing Trends
Total staff
• FY05: 92 FTE
• FY06: 89 FTE
Growth in LHC Research Program computing professionals
• FY05: 15 FTE
• FY06: 21.3 FTE
Number of physicists on LHC/D0 unchanged
• FY05: 9.7 (LHC), 2.7 (D0)
• FY06: 10.3 (LHC), 2.8 (D0)
Growth in Neutrino physicists
• FY05 1.8 FTE
• FY06 4.9 FTE
Total Physicists decreased
• FY05 41.1 FTE
10% decrease!!!
• FY06 36.3 FTE
27
More Staffing Trends in Physics Dept
RSVP group
• FY05: 10 physicists, 1.2 engineers, 2.3 techs
• FY06:
– 3 to Neutrinos
– 3 to ATLAS
– 1 to LSST
– 1 to ILC R&D
– 1 to accelerator division
– 1 to NSF
– Engineer to NSLS-II
Where RSVP physicists went
Core research staff (all categories; non-LHC
project )
– FY05: 57.4 FTE
– FY06: 48.8 FTE
Large reduction in staff
28
Budgets
Physics Department - HEP - Expenditures by Fiscal Year
Non-LHC funding
Core Programs
Description
FY 05 Actual
Expenditures
$k's
Proton Accelerator Research
Other Technology R&D
Detector Development
Accelerator R&D and ATF
Muon Accelerator R&D
Theoretical Physics
FY 06 Projected
Expenditures
$k's
FY 07 GUIDANCE
$k's
8534
7458
7831
803
872
788
2130
971
2180
14618
2631
944
2231
14137
2655
995
2200
14469
*
Includes Operating and Capital Expenditures
Bottom Line: FY07 budget will allow us to maintain staff,
but not expand ATLAS physics effort
*Reactor Experiment put in Non-Accelerator Physics Budget Code in lab’s request for FY07
29
Conclusion
Reorganization of experimental program into
two major efforts following RSVP cancellation
• Collider physics: ATLAS/D0/ILC
• Neutrinos: MINOS/Reactor/VLBO
We are moving aggressively to implement plans
FY07 budget allows continuation of effort at
current level, but not (highly desired!) expansion
of ATLAS physics effort
ALL efforts need increased number of postdocs to maximize impact
30
Staffing Trends
BNL Staff levels (FTE's)
phys
comp prof
eng
techs
admin
students
others
TOTAL
FY05
LHC - Physics
LHC - Research Program
RSVP
D0
Neutrinos
Theory
Accelerator R&D
ILC R&D
Detector R&D (incl. ILC Det.)
9.7
2.1
10
2.7
1.8
8.1
3.6
15
1.1
9.6
1.2
1.6
5.1
2.3
0.8
0.9
3.1
3
1
2.8
0.4
1.8
1
1.1
0.8
0.4
13.4
34.6
13.5
2.7
3.6
9.6
10.1
0
4.5
1.4
FY05 Total
41.1
15.9
17.1
10.8
6.7
LHC - Physics
LHC - Research Program
RSVP
D0
Neutrinos
Theory
Accelerator R&D
ILC R&D
Detector R&D (incl. ILC Det.)
LSST
FY06 Total
10.3
1.9
21.3
8.9
1.1
4.9
0.1
1
3.1
0.8
2
1
1
1
8.9
7.1
0
0
92.0
0
12.4
40.1
0.1
2.8
6.7
8.9
12
1
3.9
1
88.9
FY06
2.8
4.9
7.9
3.6
1
2.9
1
36.3
0.9
4.5
1
22.2
14.4
SMD not included, see Yakimenko talk
31
0