Today’s Agenda
8:30 WELCOME & INTRODUCTIONS
8:40 Status update on gov’t energy efficiency projects
State agencies, schools, municipalities, higher-ed
9:00 WISE Showcase Energy Audit Report
Engineering Economics, Inc. / EMNRD / GSD
9:25 WISE Program & Showcase Project
opportunity for questions
9:45 NETWORKING BREAK
10:00 Energy Services Coalition
12:00 ADJOURN
2
WISE =
• Whole-Building
• Investments in
• Sustainable
• Efficiency
Goal: 20% x 2020
3
ARRA “Headstart”
•
•
•
•
$12 million in ARRA projects, GSD buildings
WISE can take credit for ARRA projects
WISE baseline year = 2011
Santa Fe GSD buildings: 10% energy savings
(FY11 to FY13 comparison)
4
WISE Showcase Energy Audit
• Facility: South Capital Complex, Santa Fe
Simms, Montoya, Runnels Buildings
Lujan and Chino Buildings not included
378,500 square feet
• Interesting Facts
State Data Center (Simms)
Simms energy intensity 6x other buildings
Shared chilled water
Recent ARRA projects
• Consultant: Engineering Economics, Inc.
5
Summary of Findings
• Baseline
~10 million kWh / $900K per year
~7,000 million Btu / $37K per year
• Savings
~22%
~2.4 million kWh / $200,000 per year
~2,600 million Btu / $12,000 per year
6
Preliminary Energy-Use
Analysis (PEA)
• Energy Use Intensity (Thousand BTU / S.F./Yr.)
S.F.
2010/11
2011/12
2012/13
3 Yr Avg.
Simms
71,425
332.3
317.2
293.5
314
Montoya
133,000
70.5
60.2
60.6
64
Runnels
174,092
54.4
53.9
58.1
56
Campus
378,517
112.5
105.8
103.4
107
• CBECS Table 5b. 2003 Total West Office Avg.
Site Energy EUI = 72
7
Measures: State Data Center
• “Targeted” energy audit
• Redundant HVAC systems
• Use of outside air to cool Data Center
• Eliminate overhead supply ductwork
• Add fluid cooler to chilled water circuit
• Combined savings: ~$67,000 per year
8
Measures: Simms Office
• Replace dual duct pneumatic terminal units
• Remove OA/condenser pre-heat coil
• Replace older inefficient electric pump motors
9
Measures: Montoya
• Remove inlet guide vanes on hot deck fan
systems and install VFDs
• Eliminate remaining pneumatic devices
• Correct various operational and control issues
10
Measures: Runnels
• Recent HVAC renovation
• Replace heating water pump motors and add
VFDs
• Convert heating water loop to variable flow
11
Measures: Lighting
• T-8 fluorescents existing
• LED fixture replacement proposed
• Previous experience with Chino Building (1,000
fixtures)
12
Funding the Project
•
•
•
•
•
•
Capital Building Repair Fund
GSD developed request
State Board of Finance approval December 17th
$2.08 million total approved
50 / 50 split for lighting / HVAC
GSD proceeding with design and projects
13
Procurement Guidance:
Selecting an ESCO
• Procurement is the responsibility of the agency
requesting services and agency paying utility bills.
Options available are:
1. Conduct an RFP process
2. Use a statewide price agreement (SPA)
3. Use a SPA GSA vendor.
• More info: see www.CleanEnergyNM.org,
Clean Energy Performance Financing
14
To get more information…
• www.CleanEnergyNM.org
 “Clean Energy Performance Financing”
 Statute
 Model documents
• www.generalservices.state.nm.us/statepurchasing/
Statewide_Price_Agreements.aspx
Building Service & Maintenance
Services (see “Energy Management Services”)
15
Contacts
• EMNRD
Brian Johnson [email protected], 505-476-3313
Harold Trujillo [email protected], 505-476-3372
Erica Velarde [email protected], 505-476-3496
• GSD
David Griego [email protected], 505-827-2141
Marty Dallman [email protected], 505-670-7391