1
Los Angeles Basin Chapter of ICC
AUTOMATED PARKING SYSTEMS AND THE
CALIFORNIA BUILDING AND FIRE CODES
UCLA OUTPATIENT AND ONCOLOGY CENTER
SANTA MONICA, CA
2
Los Angeles Basin Chapter of ICC
3
Los Angeles Basin Chapter of ICC
4
Los Angeles Basin Chapter of ICC
PROJECT SUMMARY
•
•
•
•
•
•
•
•
•
30,000 SF Lot
45,000 SF Building, 3 Stories
Oncology Treatment
OSHPD-3 Clinic
Occupancy Types = I-2.1 / B / S-2
Construction Types = I-A & I-B
Subterranean Parking Structure, 6 Levels
LEED Gold
100kW PV System
5
Los Angeles Basin Chapter of ICC
PLANNING AND ZONING REQUIREMENTS
•
•
•
•
•
CP3 Zone
Maximum Height = 45 Feet (70 Feet)
Stories Maximum = 3 Stories (5 Stories)
Maximum Floor Area Ratio = 1.5 (2.5)
Hospital Area Specific Plan
6
Los Angeles Basin Chapter of ICC
PLANNING AND ZONING REQUIREMENTS
•
•
•
•
250 Parking Space Provided (min. 180)
Below Grade not Counted in FAR
Variance Parking
Sign Adjustment
7
Los Angeles Basin Chapter of ICC
•
•
•
•
4 Lots
30,000SF (200’ x 150’)
Vacant Single-Story Retirement Home (1941)
Vacant 6-Unit MFD (1946)
8
Los Angeles Basin Chapter of ICC
Project Profile
9
Los Angeles Basin Chapter of ICC
PROJECT SUMMARY
• Design Architect = Michael Folonis, AIA
11
Los Angeles Basin Chapter of ICC
PROJECT SUMMARY
• Developer = Nautilus Group
12
Los Angeles Basin Chapter of ICC
AUTOMATED PARKING STRUCTURE
• 6-Levels of Parking
• 73,500 SF Parking (vs 145,000 SF)
• 800A Feeder to (2) Parking Cranes
13
Los Angeles Basin Chapter of ICC
AUTOMATED VERSUS CONVENTIONAL
14
Los Angeles Basin Chapter of ICC
“SHELVING SYSTEM”
15
Los Angeles Basin Chapter of ICC
CARRIER SYSTEM
16
Los Angeles Basin Chapter of ICC
AUTOMATED PARKING STRUCTURE
17
Los Angeles Basin Chapter of ICC
6-LEVELS
18
Los Angeles Basin Chapter of ICC
DESIGN CONSIDERATIONS / CODE DEVIATIONS
•
•
•
•
•
•
•
•
Acceptance by City?
No ADA Access
Elimination of Ramps, Elevators
Reduced Lighting in Garage
Reduced Egress Load
Reduced Garage Ventilation
Reduced Headroom
Modified Fire Access
19
Los Angeles Basin Chapter of ICC
UNDER CONSTRUCTION
20
Los Angeles Basin Chapter of ICC
UNDER CONSTRUCTION
21
Los Angeles Basin Chapter of ICC
INSTALLATION
22
Los Angeles Basin Chapter of ICC
eVALET
23
Los Angeles Basin Chapter of ICC
CALIFORNIA BUILDING CODE
• CBC Section 404.5: Atrium Smoke Control
• CBC Section 404.7: Atrium Smoke Control Standby
Power
• CBC Section 406.2: Parking Garages
o Clear Height, Guards, Vehicle Barrier Systems
• CBC Section 903.2.10: Group S-2 Enclosed Parking
Garages
o Automatic Sprinkler System Throughout
• CBC Chapter 10: Means of Egress
24
Los Angeles Basin Chapter of ICC
ATRIUM SMOKE EVACUATION
25
Los Angeles Basin Chapter of ICC
CALIFORNIA MECHANICAL CODE
• CMC Section 403.8 Exhaust Ventilation Parking
Garages
• CMC Chapter 4: Ventilation Air Supply OSHPD-3
• CMC Chapter 6: Duct insulation OSHPD-3
26
Los Angeles Basin Chapter of ICC
CALIFORNIA ELECTRICAL CODE
• Section 110.3(B) – Installation and Use
• Article 690: PV Systems
• 517: OSHPD-3
o 517.16: Isolated Ground Receptacles
o 517.22: Artificial Lighting = IES
o Part III. Essential Electrical System
o Separate System, Transfer Switches, System Capacity,
Identification
o Separation from Other Circuits
o 517.123: Call Systems
27
Los Angeles Basin Chapter of ICC
AUTOMATED ENTRY INDICATION
28
Los Angeles Basin Chapter of ICC
INDICATOR LIGHTS
29
Los Angeles Basin Chapter of ICC
CUSTOMER LOBBY
30
Los Angeles Basin Chapter of ICC
KIOSK AND CAR CARRIAGE
31
Los Angeles Basin Chapter of ICC
AUTOMATED PARKING STRUCTURE
32
Los Angeles Basin Chapter of ICC
AUTOMATED PARKING STRUCTURE
33
Los Angeles Basin Chapter of ICC
ACCESSIBILITY COMPLIANCE
34
Los Angeles Basin Chapter of ICC
CUSTOMER VIEWING WINDOWS
35
Los Angeles Basin Chapter of ICC
DROP OFF & PICK UP
36
Los Angeles Basin Chapter of ICC
AUTOMATED PARKING STRUCTURE
37
Los Angeles Basin Chapter of ICC
STANDARDS APPLIED TO UNLISTED EQUIPMENT
• NEC
• UL
• IEEE
38
Los Angeles Basin Chapter of ICC
AUTOMATED PARKING STRUCTURE
http://www.youtube.com/watch?v=LCPgH9wld_Q
39
Los Angeles Basin Chapter of ICC
AUTOMATED PARKING STRUCTURE
40
Los Angeles Basin Chapter of ICC
LOS ANGELES BASIN CHAPTER OF ICC
RON TAKIGUCHI, P.E.
BUILDING OFFICIAL – CITY OF SANTA MONICA