Design for Demilitarization Overview LTC Johnny Figueroa PM Demilitarization

Download Report

Transcript Design for Demilitarization Overview LTC Johnny Figueroa PM Demilitarization

Design for Demilitarization
Overview
LTC Johnny Figueroa
PM Demilitarization
973-724-5276
[email protected]
3 February 2009
Presentation
Outline
 Design for Demil Policy Requirement
 Why DFD?
 Demil Challenges
 DFD Goal
 Demil Execution Background
 Munition Design Impact on Demil
 DFD Integrated Process Team
 Implementation Strategy
 Summary
3 February 2009
2
DFD Policy
Requirement
 DFD policy signed 4 Aug 08 by Mr. John Young,
Undersecretary of Defense for Acquisition,
Technology & Logistics.
3 February 2009
3
Why Design for Demil?
 Traditionally, munition designers focus on item
performance & may not be aware that design decisions
can lead to difficult demil problems at the end of the
item’s life cycle.
 In the past, OB/OD “took care of the
problem”.
 Munition design historically had little
impact on the ability to conduct
effective and efficient demil (OB/OD).
 But things have changed …
3 February 2009
4
Demil Challenges
Demil Stockpile History
Growing
Stockpile
600.0
T
o
n
n
a
g
e
Increasing
/
Cost F
u
n
d
i
n
g
Projected
500.0
400.0
Limited
Storage
300.0
Stockpile Size (k-S/Tons)
Generations (k-S/Tons)
Accomplishments (k-S/Tons)
Funding
($M's)
200.0
100.0
0.0
85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11
Year
3 February 2009
5
Design for Demil Goal
 Demil is a life cycle requirement that typically is inadequately
addressed in the design phase.
 Goal: Influence munitions design early in the life cycle to
incorporate demil considerations & positively impact future demil
execution.
3 February 2009
6
Demil Execution:
Then/Now/Future
3 February 2009
7
Munition Design
Impact on Demil
SPARROW 17A/B WARHEAD
ADAM MINE
Depleted
Uranium Salt
requiring
$1M+
additional
demil
equipment
HARM WDU-21B NAVY WARHEAD
Conduit traps explosives
Glue
requires
extra
process
steps
3 February 2009
Small
wash out
hole
PBXN-107 fill does not melt
8
Item Performance
 Design for Demil is not intended to detract from
achieving item performance.
 Design trade offs will be handled by the Item
PM.
 Low cost design changes that do not impact
performance could be made … if someone were
thinking demil.
3 February 2009
9
Design for Demil
Implementation
 PM Demil executes the SMCA demil
mission for all Services’ munitions
 DFD - a key strategic goal of the PEO
Ammo approved Demil Enterprise
Strategic Plan.
 Multi-Service DFD Integrated Process
Team (IPT) chartered to establish a
DFD program.
 Acquisition and demil are represented
3 February 2009
10
DFD Implementation
Strategy
• Lessons Learned: Design
DESIGN FOR DEMIL
… influencing munitions design for effective and efficient
demil
•
TOOLS
MUNITIONS IPT
PARTICIPATION
CONTRACTUAL
REQUIREMENT
POLICY
METRICS
LESSONS
LEARNED
PROGRAM OVERSIGHT
ACQUISITION COMMUNITY
AWARENENESS
•
•
•
DOD/SERVICES SENIOR MANAGEMENT SUPPORT
•
3 February 2009
recommendations from demil
execution experience
Metrics: Verify
accomplishment.
Policy: Impose the requirement
Contractual Requirement:
Translate the requirement to the
defense contractor.
Munitions IPT Participation:
Get involved “In the trenches”.
Tools: Provide practical help
(web based handbook).
11
Summary
 The acquisition community has the opportunity to
further improve life cycle benefits by incorporating
demil considerations into munitions design.
 Implementing DFD will positively impact the demil
legacy left behind, with little cost or performance
impact.
 The DFD IPT will continue to develop tools and
resources to assist the acquisition community in
this endeavor.
PM Demilitarization website contains information on
Design for Demil
https://www.pica.army.mil/pmdemil
3 February 2009
12