COMPACT 200 RAPID REACTION BRIDGE SYSTEM Modern Improvements

Download Report

Transcript COMPACT 200 RAPID REACTION BRIDGE SYSTEM Modern Improvements

COMPACT 200 RAPID REACTION
BRIDGE SYSTEM
Modern Improvements
Modern Improvements
COMPACT 200 RAPID REACTION BRIDGE SYSTEM
The design of the Mabey Compact 200 bridge allows
the system to be used in a logistic role throughout the
support area. As a Line of Communication bridge it can
carry loads of up to Class 110 over gaps of up to 60m
(200ft). The bridge is ideally suited for areas where
speed of deployment is vital.
Modern Improvements
Rapid Construction
The bridge is designed to be built by hand. A 30m bridge
can be assembled and conventionally launched by 29
men in two or three hours, depending on site conditions.
Where cranes or materials handling equipment is
available, the total number of man hours to assemble a
bridge is substantially reduced.
Modern Improvements
Launching Nose
Load Testing
Modern Improvements
Modern Improvements
B Co, 23rd Engr Bn replacing
the Brcko Bridge with the
Compact 200 (MAR 96)
Modern Improvements
M2 Bailey
Mabey Compact 200
MLC
MLC 80(T) 70 (W)
MLC 80 (T) 110 (W)
# of Bays
13
13
Construction
DT
DS
# of Panels
156 -- 2 ½ Sets of
Bailey
52
# of Transoms
66
14
Roadway Width
12 ft. 6 in (3.8m)
13 ft. 9 in. (4.2m)
Type of Deck
Timber
Steel
Total Weight
87 t
55 t
Based on the launch and erection of a 130ft (39.62m) clear
span, single lane bridge.
Modern Improvements
M2 Bailey
Mabey
Compact 200
# of Bridging Sets
Required
2 ½ Sets
1
# Men Required
90
29
# of Trucks Required
At Least 15 PLS (7
PLS per Set)
11 PLS
# of Crane Picks
Required
222
66
HOURS REQUIRED
12-14 hours
8-9 hours
Based on the launch and erection of a 130ft (39.62m) clear
span, single lane bridge to carry MLC80 (T). Note, the
M2 Bailey is unable to accommodate MLC 96 (W) Traffic.
Modern Improvements