Regional Calorimeter Trigger
RCT Personnel:
Faculty:
Physicists:
Students:
Engineers:
Technician:
S. Dasu, W. H. Smith
P. Chumney, Monika Grothe (New)
C. Hogg (UG)
T. Gorski (Lead Engineer), M. Jaworski,
P. Robl (Physical Sciences Laboratory),
J. Lackey (Retired, July 2003)
R. Fobes
Outline:
Status of Prototypes
Plans for Production Testing
Plans for Integration, Chain and Slice Tests
Schedule and Milestones
S. Dasu, University of Wisconsin
September 2003 - 1
Algorithms
S. Dasu, University of Wisconsin
September 2003 - 2
Overview
S. Dasu, University of Wisconsin
September 2003 - 3
Calorimeter Geometry
EB, EE, HB, HE map
to 18 RCT crates
Provide e/g and jet,
t, ET triggers
S. Dasu, University of Wisconsin
September 2003 - 4
Trigger Mapping
S. Dasu, University of Wisconsin
September 2003 - 5
Calorimeter Trigger Crate
Data from calorimeter
FE on Cu links
@ 1.2 Gbaud
•Into 126* rear
Receiver
Cards
•Prototype
tested
w/ ASICs
160 MHz point to point backplane (prototype tested)
Spares
• 18 Clock&Control (prototype tested), 126 Electron ID (prototype tested), not
18 Jet/Summary Cards -- all cards operate @ 160 MHz
included*
• Use 5 Custom Gate-Array 160 MHz GaAs Vitesse Digital ASICs
• Phase, Adder, Boundary Scan, Electron Isolation, Sort (manufactured)
S. Dasu, University of Wisconsin
September 2003 - 6
First Full RCT Crate
18 Such Crates make up the full RCT System covering |h|<5 & 0 < f < 2p.
Rear: Receiver Cards
S. Dasu, University of Wisconsin
Front: Electron, Jet, Clock Cards
September 2003 - 7
Second Generation Crate & Backplane
VME
48V externally supplied
Std.
Custom
VME
Point-to-point
Slots
Dataflow
Front
Custom
Point-to-point
Dataflow
VME
Power
Supply
Rear
160 MHz with 0.4 Tbit/sec dataflow (point-to-point)
• Tests indicate good signal quality
Designed to incorporate all algorithms
• Non-Isolated Electron, Tau & Jet Trigger primitives
Most data paths checked manually and with JTAG, and with loop-back cables.
S. Dasu, University of Wisconsin
September 2003 - 8
Second Generation Clock & Control Card
Clock
delay
adjust
DC-DC
Converters
Fans out 160 MHz clock & adjusts phase to all boards
Design validated - With small changes, layout and routing of
production version completed - Ready for full production.
S. Dasu, University of Wisconsin
September 2003 - 9
Second Generation Receiver Card
Full featured board & Phase, Boundary Scan & Adder ASICS fully validated.
Production Started (ASIC production finished).
Eight Boards built and tested in full crate test.
Full quantity of mezzanine link cards (1422) are manufactured.
Adder
PHASE
ASICs
mezz
link
cards
BSCAN
ASICs
MLUs
DC-DC
Top side with 1 of 8 mezzanine cards
& 2 of 3 Adder ASICs
S. Dasu, University of Wisconsin
Bottom side with all Phase
& Boundary Scan ASICs
September 2003 - 10
RCT 4 x 1.2 Gbaud Copper
Link Cards & Serial Test Card
Compact
Mezzanine
Cards for
each
Receiver
Card accept
4 x 20 m 1.2-Gbaud
copper pairs transmitting
2 cal. tower energies every
25 ns with low cost & power.
Uses Vitesse Link Chips (7216-01).
Final Serial Link Test Card (STC)
Status: Already commissioned,
cables, cards, 48V PS, and support
software, delivered to CERN in
March, operating in ECAL
Electronics lab stably with no errors
for months.
Delivered to Princeton for HCAL
tests in June and operating stably
with no errors since.
Two pairs in use @ UW for testing
receiver mezzanine cards.
S. Dasu, University of Wisconsin
September 2003 - 11
Second Generation
Electron Isolation Card
Full featured final prototype board
is fully validated - production
underway
8 boards made and tested as part
of full crate test.
Electron ID & Sort ASICs validated
and production complete
EISO
SORT
ASICs
EISO
S. Dasu, University of Wisconsin
September 2003 - 12
Jet/Summary Card
Receiver
Mezz. Card
Phase
ASIC
Backplane:
Two e/g
per region.
Region ET
Sums
BSCAN
ASICs
Cables
To GCT
Sort
ASICs
BSCAN
ASICs
Full function prototype manufactured and tested.
•
•
•
•
Uses SORT ASICs to find top four e/g, threshold for muon bits, both to GCT
Region energies to GCT
Absorbs HF functionality with Rec. Mezz. Card, HF sent to GCT.
Integration test with GCT Done - Change in termination - Production to start shortly
S. Dasu, University of Wisconsin
September 2003 - 13
RCT Test Suites
Receiver Card (~150)
• Cycle memory at speed - all paths beyond Phase ASIC exercised
• JTAG to test some circuits in detail
• A fraction of inputs (4 - 8) from STC transmitters
• Covers full data path
Electron Isolation Card (~150)
• Input by cycling RC memories
• Multiple cards (corner data by loop back cables)
• JTAG to test some circuits in detail
Jet/Summary Card (~20)
• Input by cycling RC memories
• Full crate with RCs + EICs used
• HF path test using STC transmitter
• Output to Jet Capture Card for testing (in design)
S. Dasu, University of Wisconsin
September 2003 - 14
Software Work
Crate Processor Hardware & Software
• Present status: Old MVME Processor and software
• Needs replacement by new CMS Compatible System
• New Hardware & New Software
Software for debugging production boards
• Developing diagnostics software for each board
• Ship data for analysis outside crate processor
• Use tools well known to physicists
Final software (in XDAQ) - Design work beginning
• Want to reuse as much of test software as possible
• Need to add CMS Interfaces
• Software will be integrated with CMS Online code for operations
• Monitoring/controls, diagnostics, configuration downloading and
documentation, modeling, physics simulation, etc.
Personnel
• P. Chumney, S. Dasu, M. Grothe
S. Dasu, University of Wisconsin
September 2003 - 15
Production Testing Tasks:
2003 - 2005
Testing software
•
•
•
•
VME Code + Conversion to SBS - S. Dasu, P. Chumney
RC & EIC Test Suites (JTAG…) well underway - P. Chumney
Jet/Summary Output verification code - M. Grothe
Integration of test software in XDAQ - P. Chumney, M. Grothe
Mezzanine cards (2003)
• 4 months to test ~1400 cards - M. Jaworski & M. Grothe
Full Board Production & Test (2004-2005):
• ~ 150 each Receiver & Electron Cards, ~ 20 each Jet, Clock Cards,
Backplanes & Crates need testing - All
• Repair & Inventory - R. Fobes
Test full crates for delivery (2005)
• 1 year for testing full complement of crates - all
• Use custom card to capture output of J/S - Jet Capture Card Under design - T. Gorski
• Provides trigger for slice test
S. Dasu, University of Wisconsin
September 2003 - 16
Integration and Chain Tests
Integration Tests (2003)
• Serial Test Cards for input link tests
• 1 pair at CERN for ECAL integration since March.
• 1 pair at Princeton for HCAL integration since June.
• Remaining 6 are being used for receiver mezzanine card
production testing at UW
• Will be reused to pump data to RCT for full test (2005)
• Pre-production Prototype Full Crate tests
• Global Calorimeter Trigger (Bristol group) integration at
Madison in August is successful - Termination scheme
agreed - Minor changes to UW JSC and Bristol IC
Integration Tests (2004)
• Augment above tests with additional electronics from
ECAL, HCAL, & GCT groups as becomes available.
• Initiate Slice Test
S. Dasu, University of Wisconsin
September 2003 - 17
Slice Tests and Trigger Commissioning
Slice Tests (Starting Late Summer 2004)
• Use full crate of tested production boards
• Will remain at CERN as spare boards and crate
• JSC Output Capture Card provides test trigger
• Personnel:
• M. Grothe moves to CERN, assisted with visits by others
Trigger Commissioning (Starting April, 2005)
• All eighteen crates - fully tested and shipped to CERN
• All electronics rechecked in electronics test facility
• Full commissioning underground in USC55
• Personnel:
• When production finishes, P. Chumney moves to CERN
to join M. Grothe, assisted with visits by others.
S. Dasu, University of Wisconsin
September 2003 - 18
RCT Conclusions
Regional Calorimeter Trigger
• All pre-production prototype boards and ASICs
built & validated
• All boards, ASICS, & crates are either produced, in
production or about to start production
• Integration tests w/ECAL,HCAL, GCT have started
Very good progress, but…
• Major work from now on:
• Production Testing of ~1800 Boards
• Software Development - Integration with XDAQ
• Slice Test Preparation + Software
• Installation and Commissioning
• Operations!
We have the team in place to do the job!
S. Dasu, University of Wisconsin
September 2003 - 19