INC Report to the NANC September 24, 2002

Download Report

Transcript INC Report to the NANC September 24, 2002

INC Report to the NANC

September 24, 2002 David Bench - INC Moderator Dana Smith - INC Assistant Moderator

1

INC MEETINGS

September 9-13, 2002: Providence, RI

November 4-8, 2002: Washington, DC

January 7-10, 2003: Washington, DC

All meeting information can be found at: www.atis.org/atis/clc/inc/inccal.htm

2

LNPA Workshop

• At the request of the LNPA WG, INC updated guidelines to accommodate wireless Type 1 to Type 2 block transfers • To accommodate wireless pooling, INC updated guidelines that alters the block activation interval. PAS will have to be modified and INC supports such modification...depending on the price tag J

LNPA Workshop Block Forecasting

• There is a disconnect between the intent of the INC guidelines and the design of PAS • PAS was built to reject a block application if the blocks requested exceed the forecast for that month…even if only by one block – The guidelines allow SPs to be assigned incremental blocks if available in the pool, but PAS does not allow the assignment of incremental blocks unless the SP modifies its forecast “on the spot” • SPs believe that PAS should have been built with flexibility to accommodate forecast estimates within a fluid six-month window

Forecasting Example & Recommendation

SP six-month forecast equals total of 10 blocks over six months

Forecast Request Month 1 2 0 PAS Result N/A Month 2 2 1 Assigned Month 3 1 3 Denied Month 4 3 0 N/A Month 5 0 2 Denied Month 6 2 4 TOTAL 10 10 Denied Recommendation

: INC requests that the NANC recommend to the FCC that the PAS be modified to accommodate forecast estimates within a fluid six-month window

CO/NXX Workshop

• To address the concerns expressed by state PUCs, INC revised its guideline text on deadlines for code assignment prior to pool start dates.

• Special appreciation to Christine Sealock Kelly (New York) for her thoughtful input and participation on behalf of the states.

Committee Issue Summary

CIC CO/NXX DMM Active 0 Initial Closure *Resolved *Tabled *Withdrawn 4 11 0 6 *TOTAL WS Issues 21 Total Active Issues as of September 24, 2002: 9 New Issues Since Last NANC Meeting: 10 4 0 63 0 15 82 1 0 57 0 10 68 Total Issues in Initial Closure as of September 24, 2002: 8 *Since INC Inception LNPA 3 3 58 0 13 77 NANP Expansion 1 0 1 0 0 2 *Total Issues Resolved: 282 Issues With No National Agreements = 0 NPA 0 1 51 0 10 62

RELEVANT INC WEB SITES

INC Homepage:

http://www.atis.org/atis/clc/inc/inchom.htm

INC Calendar:

http://www.atis.org/atis/clc/inc/inccal.htm

INC Issues:

http://www.atis.org/atis/clc/inc/incissue.htm

INC Meeting Records:

http://www.atis.org/atis/clc/inc/incmtgrc.htm

INC Published Documents:

http://www.atis.org/atis/clc/inc/incdocs.htm