Transcript CO/NXX Workshop - NANC
INC Report to the NANC
May 2002
David Bench - INC Moderator Rose Travers - INC Assistant Moderator
1
INC MEETINGS
•
June 3-7, 2002: INC 64 Portland, OR
•
July 29-August 2, 2002: Montreal, Quebec, Canada
•
September 9-13, 2002: Providence, RI
•
All meeting information can be found at: www.atis.org/atis/clc/inc/inccal.htm
2
RELEVANT INC WEB SITES
•
INC Homepage:
http://www.atis.org/atis/clc/inc/inchom.htm
•
INC Calendar:
http://www.atis.org/atis/clc/inc/inccal.htm
•
INC Issues:
http://www.atis.org/atis/clc/inc/incissue.htm
•
INC Meeting Records:
http://www.atis.org/atis/clc/inc/incmtgrc.htm
•
INC Published Documents:
http://www.atis.org/atis/clc/inc/incdocs.htm
LNPA WORKSHOP
• PA contract inhibits timely changes to process improvements and is inflexible relative to the change order process • The PA contract is based on the INC Guidelines/Forms in effect on Sept. 9, 2000.
• For example, the ability to add a “remarks” field on PAS mechanized forms is hampered by the change order process • INC and PA continue to improve industry processes • Some PAS upgrades require additional funding, such as adding a “remarks” field • Frustration with implementing current change orders in PAS because state trial processes were more flexible 4
CO/NXX WORKSHOP
• INC discussed at length the input received from state regulators on Issue 322 - Removal of Switch ID. Although the issue remains in initial closure, INC has concluded that the Switch ID field should be removed because: • FCC rules mandate assignments at the rate center level, not the switch level; • Switch ID is an artifact from the days when assignments were made at the switch level and is no longer used in the assignment of a Central Office code; • SPs may move numbers between switches within a rate center to balance resources, therefore rendering the original Switch ID moot; and • State regulators have other ways to obtain Switch ID information, e.g., TRA, CCMI, NECA FCC Tariff No. 4 and other vendor products.
5
CO/NXX WORKSHOP
• NANC LNPA Working Group provided further clarification relative to PIMs 14 & 15 which the INC is working within Issue 364 - Modifications to Procedures for Code Holders/LERG Assignee Exit • INC approved interim procedures for returning non-pooled codes with active or pending TNs (detailed in the NANPA report) 6
NANPE Workshop
• NANP Expansion Reference Document • Final Closure expected at July INC meeting • July NANC meeting precedes July INC meeting • NANC briefing on Reference Document in September • INC requests NANC members submit questions, in writing, prior to September meeting.
Active Initial Closure
INC Issue Summary
CIC CO/NXX DMM LNPA NANP Expansion 2 0 12 6 7 0 4 0 8 0 NPA 1 1 *Resolved *Tabled 11 3 *Withdrawn *TOTAL WS Issues 5 19 Total Active Issues as of May 21, 2002 : 35 New Issues Since Last NANC Meeting: 5 54 0 14 84 51 0 8 65 Total Issues in Initial Closure as of May 21, 2002: 13 48 0 9 73 1 0 0 3 *Total Issues Resolved: 269 Issues With No National Agreements = 0 50 1 10 63 *Since INC Inception