Transcript Brooklyn Navy Yard Cogeneration Partners Edison Mission Energy York Research

Brooklyn Navy Yard Cogeneration Partners

Edison Mission Energy York Research Operator - Palmark Plant Engineer - Yefim Kashler

Midtown Manhattan

New York Location

Con Edison Steam Plant East River Williamsburg Bridge Brooklyn Navy Yard Cogen Plant

Plant Facilities Layout

Gas/Fuel Oil Air Compressor Gas Turbine #1 #1 Heat Recovery Steam Generator Steam Turbine #1 Extraction Steam 350kpph Air 100MW 100MW Compressor Gas Turbine #2 Gas/Fuel Oil City Water 40MW 40MW #2 Heat Recovery Steam Generator De-Ionized Water Water Treatment Plant Steam Turbine #2 Extraction Steam 350kpph Customers

Con Edison

 

BNY Red Hook MW 220 5-6 Kpph 800 20-50 10

Business & Operational Challenges

Con Edison Contract Provisions:

20 Year Contract for 220MW + 800,000 Lbs Steam/Hour

Dictate Plant Operating Mode

Curtailments - 50% or 100% up to 25 Instances/Year before Penalty

Conversions - Any Time/Duration (Steam to MW and MW to Steam)

Payment Terms

GDP Implicit Price Deflator - 3Q Previous Year

NYMEX gas Average 3 Day Closing back 5 Days from Month End

Equivalent Availability - Calculated Hourly Based on Performance

Fuel Scenarios

Winter Cold Periods - Gas Uneconomic. Use Fuel Oil or shutdown plant?

Summer Heat Periods - How to Maintain Contract EA

Information & Control Systems - Phase 1

Client - Power Advisor - Excel Power Suite Paradox Data Scan CIU Bailey Infi 90 COGEN Plant Office Lotus Notes Maintenance MP2-Paradox

Why PI?

Never Able to Configure Power Suite to Real Plant Environment

Reports Were Not Valid and Had to Redo Manually Using Spreadsheets with Manual Input from Bailey Logs

Power Suite Only Handled Under a Hundred Data Points and Was Unable to Support Technical Monitoring

There Was a Need for Fast, User Friendly Interface to Support Operations and Business Decisions

Evaluate PI Capabilities Approve Project Funding Place Orders (OSI - Matrikon System Development Installation and Checkout Water Treatment Plant

PI Implementation

2Q 97 3Q 97 4Q 97 1Q 98 2Q 98 3Q 98 4Q 98 1Q 99 2Q 99

Information & Control Systems - Today

PI Combo (5) - Process Book - DataLink-Excel Office Lotus Notes Maintenance MP2-SQL PI Server 5,000 Tags PI Interface CIU Bailey Infi 90 COGEN Plant Allen Bradley/W-Ware Water Treatment Plant

Current Applications

Monitor Plant Operations from Desktop - Mimic Operator Graphics and Provide Plantwide Overview of Current Operation

Use PI Trends to Troubleshoot Problems

Use DataLink and Excel to Provide Daily Operational and Business Reports, and a Large Number of Reporting Applications:

Billing Logs

Plant Testing Reports

Emission Reports

Chemistry Reports

Plant Overview Display

MW Adhoc Trend

HRSG-1 Performance

Unit 1 Air Emissions

HRSG-1 Feedwater System

Water Pretreatment

Water Treatment System

Turbine Inlet Air Conditions

Application Plans

Set Key Operating and Business Targets for Plant Units and Monitor Actual Performance Against Target

Enable Management to Assess Impact of Different Operating Strategies by Integrating Plant Operating Model with PI

Present Current Plant Status and Key Performance Indicators to Management (Plant and Owners).

PI Benefits at BNYCP

Monitors Current Plant Operations Continuously

Enables Close Cooperation Between Plant Engineering, Operations and Maintenance

Pinpoints Cause and Effect when Troubleshooting Problems

Responds to Any and All Requests for Information from Customers, Regulatory Agencies and Owners, Involving the Analysis of Large Volumes of Operational History

Automates the Calculation and Reporting of Complex Business Parameters Affecting Operations and Revenue

Is Available at All Times from Office or Home

Thank You OSI

PI Makes All The Difference!

It Allows Us to Be Effective.