ArcelorMittal Poland December 3, 2012

Download Report

Transcript ArcelorMittal Poland December 3, 2012

ArcelorMittal Poland
December 3, 2012
Fact sheet
• 6 locations – 5 steel plants and the largest coke plant in
Europe: ZK Zdzieszowice
• 70 percent of Polish steel market potential
• Over 11,000 employees, 15,000 including subsidiaries
• Investments worth over PLN 4.5 bn
• The largest investment in European hot rolling for 20 years:
HOT STRIP MILL in Kraków – PLN 1.2 bn (USD 400 m)
• Technology for highly processed products and advanced steel
grades
• CR projects of over PLN 11 m
• 400,000 trees planted
• SOCIAL DIALOGUE: trade unions’ representatives present
on company’s Supervisory Board and in management meetings
1
Investments above all
Our investments 2004-2008
Value: PLN 3.8bn
Modernisation of wire rod mill
in Sosnowiec – PLN 140 m
2 new coke oven batteries
in ZK Zdzieszowice
– PLN 364 m
Construction of CCM3
in Dąbrowa Górnicza – PLN 488 m
Construction
of hot strip mill in Kraków
– PLN 1.2 bn
New organic coating
line in Świętochłowice
– PLN 107 m
Modernisation of blast furnace no. 2
in Dąbrowa Górnicza – PLN 260 m
3
2009 – Despite the crisis we invested PLN 270 m
Control and measurement block
for rail inspection in Dąbrowa Górnicza
• Investment of PLN 23 m
• New block can inspect rails of up to
75 m long at 1.5 metres per second
Modernisation of cold rolling mill in Kraków
• Investment of nearly PLN 98 m based on
state-of-the-art technologies increasing
parameters of cold rolled sheets.
• Modern solutions ensuring excellent
tolerance of thickness and high flatness
of cold rolled sheets.
• Modernisation covered pickling line,
4-stand rolling mill and temper mill
2010 – Despite the crisis we invested PLN 270 m
Twin ladle furnace in Dąbrowa Górnicza
• Investment of nearly PLN 120 m
• Processing in ladle furnace allows to
increase parameters of quality steel
used by automotive,
construction and household
appliances industries.
Strip surface inspection system
in hot strip mill in Kraków
• Investment of PLN 2 m
• Software recognising possible defects and
faults significantly increases control
over product quality and allows to
decrease volume of scrap appearing during
visual inspection of production
line.
2011-2012 We carry on investing
2 hot metal desulphurisation
stations in Dąbrowa Górnicza
• Investment of PLN 24 m
• Total annual production capacity of 6 m tonnes
• Equipment will improve
parameters of steel used
for production of household appliances
and in automotive industry
Modernization of sinter belt no. 2 in
Dąbrowa Górnicza
• Investment of PLN m
• Production capacity of sinter increased
• Two modern electrostatic precipitators
allowed for significant reduction of dust
emissions
2011-2012 We carry on investing
PCI installation to blast furnace no. 2 in
Dąbrowa Górnicza
• Investment value: PLN 30 m
• Optimized production costs of hot metal
used for production of steel
• Production of PCI is more environmentally
friendly than coke production
New ladle workshop at the steel
shop in Dąbrowa Górnicza
• Investment value: PLN 15.5
• Shorter steel production time
• Lower energy consumption and
improvement of environmental footprint
Other investment projects currently running
Coke gas cleaning in Kraków’s coke plant
Cost: PLN 100 m
New torpedo ladles for transport of hot
metal to Kraków’s steel plant
Cost: PLN 36 m
Construction of new waste water treatment
plant in Kraków’s coke plant
Cost: PLN 24 m
Replacement of hot stoves for blast
furnace
Cost: PLN 50 m
Corporate responsibility
Making safe sustainable steel
Safety is our priority
Our „Journey to zero”
• Consciousness
management programme –
talks with employees,
behaviour audits
• International Health & Safety
Day at ArcelorMittal
• Working Conditions
Improvement – renovations
of changing rooms and
canteens
• Modifications of PPE
• Health: vaccinations, healthy
lifestyle promotion, medical
examinations
Making safe sustainable steel
Environmental protection
Tree planting scheme
• we planted 400,000 trees
• total cost: PLN 1 m
Noise reduction project in Kraków and Huta
Królewska
• Project in Kraków in cooperation with scientists
from AGH University of Science and Technology
• Cost: PLN 8 m
Green Officer
•
•
•
Direct communication channel with
communities
In regular contact with WIOŚ in Kraków
24h ecological toll-free line
Environmental Forum
•
•
Meetings of companies operating in the
area of Nowa Huta
Continuous search for activities aimed at
reducing environmental impact
Investing in our employees
• Mentoring: Preparing
ArcelorMittal mentors
for newly hired young
engineers
• Project aimed at
training managers:
from shift foreman to
Unit director
• Creating knowledge
base: necessary for
future managers
• Tailor-made courses
aimed at enhancing
managerial skills –
coaching, team work,
analytical and
innovative thinking Over
1,000 graduates so far
• Preserving expertise
and experience within
the organization
• As an international
company we realize
how important the
knowledge of foreign
languages is
• We offer our employees
1-to-1, group and
online courses of
English
Investing in our people
• We have set up two
company kindergartens for
our employees’ children.
The first one was
inaugurated in Dąbrowa
Górnicza in September
2011, the other one in
Kraków in 2012.
• Each foreseen for 100
children
• Initiative of Women’s
Council
• Necessity confirmed by
results of survey carried out
among our employees of
two largest units – 90%
interested.
We enrich our communities
2010
•
•
10 multimedia laboratories at schools in Sosnowiec,
Chorzów, Świętochłowice and at Politechnika Śląska
Endoscopy laboratory in a hospital in Sosnowiec
2011
•
•
•
6 multimedia laboratories at schools in Sosnowiec,
Chorzów, Świętochłowice and Dąbrowa Górnicza
Support for specialist hospitals in Siemianowice and
Piekary Śląskie
Fire engine in Dąbrowa Górnicza
2012
•
•
•
Construction of football pitch at primary school in
Zdzieszowice
Music therapy laboratory in Chorzów
Numerous promotional actions for blood and bone
marrow donations in Kraków, Dąbrowa Górnicza,
Katowice and Zdzieszowice
Thank you