Document 7337832

Download Report

Transcript Document 7337832

MOIMS Area Report
N. Peccia
ESA
R. Thompson BNSC
Attendance to the MOIMS Meetings
MOIMS Plenary
NASA ESA BNSC CNES ASI CSA
16th Jan 07
12
7
4
5
2
1
Total
SC14
1
33
SM&C
NAV
DAI / IPR
NASA ESA BNSC CNES ASI CSA
NASA ESA JAXA CNES ASI SC14
NASA ESA CNES BNSC CSA
16th Jan 07
14
3
3
3
1
1 25
3
2
1
1
1
1 9
6
2
2
2
12
Total
46
17th Jan 07
Total
22
18th Jan 07
13
3
2
2
1
1 31
4
2
1
1
1
1 10
8
3
3
2
1 17
58
2
2
3
1
1 22
3
3
1
1
1
4 13
2
7
1
1
3
1
1
1
7
10
Total
19th Jan 07
Total
52
13
2
2
3
1
2 23
3
3
1
1 8
8
3
3
14
45
MOIMS Plenary
NASA ESA BNSC CNES ASI CSA
20th Jan 07
11
4
3
2
1
1
Total
SC14
Diversity Factor
CESG-CMC Meeting 23 / 24 Jan 2007
22
SM&C
NAV
DAI / IPR
MOIMS Report
6 Agencies
5 Agencies
4 Agencies
p. 2
MOIMS DAI WG Report
DATA ARCHIVE INGESTION WG
Goal: Develop a CCSDS/ISO standard for a Submission Information
Package (SIP) for transfer and validation of information submitted to
an archive
Goal: Determine the need to update the OAIS Reference Model for
the 5-year reviews
Working Group Status: Active __X_ Idle ____
Working Group Summary Situation:
status:
OK
comment:
Good progress
on draft SIP red
book;
OAIS reference
model will get a
minimal update
CESG-CMC Meeting 23 / 24 Jan 2007
CAUTION
PROBLEM
MOIMS Report
p. 3
MOIMS DAI WG Report
Working Group Summary progress:



A list of issues with the draft Producer Archive Interface Standard
(PAIS) Red Book were reviewed and most were resolved. Updates
needed to the XML schema, for describing data objects to be
transferred to the archive, have been identified. Preliminary mapping
of PAIS / SIP attributes to the XFDU standard have been identified, but
completing this is the major technical work remaining. The outline for
the Green Book has been agreed.
Review of comments received on the need to update the OAIS
reference model have lead to a decision to do a minimal update to
clarify some terms and concepts.
Schedule (major deliverables only)



Draft PAIS Red Book, with Green Book, ready for formal review: 30 June 2007
Updated OAIS reference model, ready for formal review: 10 October 2007
Charter updated
CESG-CMC Meeting 23 / 24 Jan 2007
MOIMS Report
p. 4
MOIMS DAI WG Report
CROSS-AREA TECHNICAL ISSUES

We will look to adopt guidance on XML schema expression as put
forward by the CCSDS XML SIG.
Other Issues and concerns

Registration Fees for meetings


Uniformly negative response
WGs

Allow individual WGs to meet as needed, at agency facilities, as long as they have
multiple agency participation. Perhaps hold Plenary every 2 years, and allow
cross-support meetings as needed, but encourage telecons, videocons
(e.g.,megameeting)
Resolution

In response to the 5-year ISO review of the OAIS reference model,
verify that we can put the updated document into ISO for review as a
final draft international standard (FDIS). If not, clarify what would be
the ISO document status
CESG-CMC Meeting 23 / 24 Jan 2007
MOIMS Report
p. 5
MOIMS IPR WG Report
Information Packaging and Registries (IPR) Working Group
The purpose of this Working Group is to:





Collect use cases from the space operations community and develop requirements
for XML data packaging:
Develop a set of recommendations that specify an extensible framework for
packaging data and metadata
Oversee the development of at least two implementations of the packaging
framework and associated with usability and interoperability tests in many areas of
space data systems
Based on testing experience and requirements from various Space Data and
Operations Groups, establish extensible registry / repository architectures that
leverage the more widely based registry work such as ebXML and UDDI.
Develop specific Registry/Repository standards that support the data packaging
registry/repository requirements focusing on the support of XML Schemas and
associated XML objects
status:
OK
comment:
X
CESG-CMC Meeting 23 / 24 Jan 2007
CAUTION
PROBLEM
MOIMS Report
p. 6
MOIMS IPR WG Report
XFDU Schedule:






Draft Green Book Issue 1 for Panel Review
Panel Review Comments Due
XFDU RB RIDs from Agency Review Due
XFDU RIDs Responses Review Telecon
XFDU BB / GB CESG Submissions
Resolution of any Agency Blue Book Comments
1st March 2007
1st April 2007
1st May 2007
1st June 2007
15th June 2007
1st Oct 2007
XML Schema Registries Schedule:






Use Cases and Requirements on CCSDS Usage of XML Schema
Registries
15th March 2007
White Papers and Agency Prototypes on CCSDS Schema Registries
1st October 2007
Draft White Book(s) on CCSDS XSD Registry
1st Jan 2008
XML Schema Registry White Book and Prototypes 1st July 2008
XML Schema Red Book/Green Book/Reference Implementation for
CESG Review
1st Mar 2009
If significant RIDS are received on the XFDU Red Book this schedule
may be impacted
CESG-CMC Meeting 23 / 24 Jan 2007
MOIMS Report
p. 7
MOIMS IPR WG Report
ISSUES




IPR has received resource commitments from member agencies to develop
an XML Schema Registry Recommendation and implementations which are
needed both for XFDU deployment and coordination of the rapidly growing
XML schema volume within the agencies.
The IPR WG agrees that a common Registry / Repository Service
Architecture is needed within CCSDS and will provide full support for a
CCSDS wide effort to establish a preliminary version of this Architecture.
However, due to critical needs of IPR member agencies for an XML Schema
registry the IPR support of the Architecture effort is available for the period
from 1st Feb 2007 to 31st May 2007 at which time those resources will be
applied to the development of a CCSDS Recommendation for an XML
Schema Registry / Repository that specialize the CCSDS Registry/Repository
Service Architecture.
The resulting interfaces and data structures can then be used to
validate/modify the CCSDS Registry / Repository Service Architecture
CESG-CMC Meeting 23 / 24 Jan 2007
MOIMS Report
p. 8
MOIMS NAV WG Report
NAVIGATION WG
Goal: Development of standards for interagency exchange of data required for
spacecraft tracking and attitude/orbit determination.
status:
OK
comment:
X
CESG-CMC Meeting 23 / 24 Jan 2007
CAUTION
PROBLEM
MOIMS Report
p. 9
MOIMS NAV WG Report
SUMMARY TECHNICAL STATUS Jan 2007 accomplishments








Completed review / update of Working Group Charter according to
current understandings
Completed review of ADM Red Book 1.4 updates and resolved a
number of open issues.
Completed review of TDM Red Book 2.0 early RID’s and a few open
issues.
Completed discussion of NDM/XML Red Book 1.2 and XML related
issues
Completed high level plan for the ADM Prototyping effort (GFSC,
CNES, JAXA)
Completed high level plan for the TDM Prototyping effort (JPL, DLR,
ESA)
Completed extensive and detailed discussions of unit discrepancies
in the group’s Recommendations (ADM, ODM, TDM)
Completed discussions with the ISO TC20/SC14 Liaison Dave
Finkleman and colleagues on the topic of standards for collaborative
operations in Earth orbit. ODM updates to accommodate these needs
are in draft status.
CESG-CMC Meeting 23 / 24 Jan 2007
MOIMS Report
p. 10
MOIMS NAV WG Report
CROSS-AREA TECHNICAL ISSUES

XML Harmonization: More emphasis on harmonization of XML issues
across the CCSDS as a whole is highly desirable (e.g., common data
elements that pervade space operations). It would be good for the
XSG SIG/WG to address this in due course.
OTHER ISSUES AND CONCERNS

CCSDS Strategic Planning


Registration fees for big meetings?:


Better communication / coordination above and beyond the WG and Area are
needed (e.g., we have on several occasions experienced changes in
requirements –XML- that necessitated additional effort and caused delays in
documents).
Mixed opinion. The group felt that by changing the meeting schedule to a
single “combined Area” meeting per year, with the individual Areas meeting
one more time in smaller venues, the agency burden to support two meetings a
year could be reduced. The requirement for coordination between Navigation
and other Areas, as is facilitated by a large meeting, has been relatively low.
Scheduling of Meetings:

More flexibility for working group for arranging meetings would be good (1 big
/ 1 smaller & more flexible). A smaller Area-oriented meeting could better avoid
holiday weeks, reduce logistics issues, avoid working on Saturdays, reduce
weather risks, etc.
CESG-CMC Meeting 23 / 24 Jan 2007
MOIMS Report
p. 11
MOIMS NAV WG Report
ISO TC20 / SC13 + SC14 Collaboration
We are engaged in ongoing discussion with SC14 / WG3
regarding new requirements on ODM.


Discussions in these Winter meetings were collegial and positive. Several
agreements were reached, but there is still some internal resistance in WG.
Orbit Data Messages (ODM) updates to accommodate SC14/WG3 needs are in
draft status (Issue by March 15, 2007, Reviewed by April 1 st, 2007)









Risk: 2 competing standards for orbit descriptions between the 2 ISO
Subcommittees. Resolving the internal differences is a high priority.
Idea of TC20/SC14/WG3 suspending their effort on ISO/AWI 26885.TO DATE,
UNACCEPTABLE TO TC20/SC14
SC14/WG3 Liaison still lists the following outstanding issues:



A new message be added to the Orbit Data Message Standard, name to be determined.
The message include elements of data from which canonical TLE’s may be constructed.
The message include a 6x6 covariance matrix abstraction.
Metadata include covariance solve-fors, but values beyond the 6x6 abstraction need not be
provided
Information that cannot be described precisely enough be included in
optional fields and not in normative requirements
Should there be two additional message types in 22644 or just one?
Should there be one standard, ISO 22644, or two mutually consistent standards, one
emphasizing content and the format for that content, the other emphasizing elements of
information?
Should TLE’s be institutionalized at all?
CESG-CMC Meeting 23 / 24 Jan 2007
MOIMS Report
p. 12
MOIMS NAV WG Report
ISO TC20 / SC13 + SC14 Collaboration - Conclusions






CCSDS Nav WG is following the Activity Plan developed cooperatively
with the SC14/WG3 at Rome in 2006
Good progress is being made
Some issues which must resolved remain, thus technical
collaboration should continue
Multiple standards for orbit data description are not in the interest of
SC14, SC13, the ISO overall, or the potential user community
(agencies and other satellite operators)
Current ISO Standard for orbit data description is ISO 22644, Orbit
Data Messages; it is being modified by the Nav WG to accommodate
SC14/WG3 requirements

Spring 2008


Summer 2008
Fall 2008
Release enhanced ODM version (Pink Book) for
CCSDS review
Conduct prototype exercises
Establish and publish enhanced ODM Blue Book
ISO/AWI 26885 work should be suspended, freeing the SC14/WG3 to
work on the many other elements of their Technical Program
CESG-CMC Meeting 23 / 24 Jan 2007
MOIMS Report
p. 13
MOIMS NAV WG Report
RESOLUTIONS

RESOLUTION 1


The Navigation WG is thankful to the CESG / CMC for making firm
announcements about date / location of upcoming meetings. This helps us all
plan better.
RESOLUTION 2

The Navigation WG is pleased to express appreciation to NASA for their
excellent hosting of this workshop, the AIAA for the excellent logistics support,
and El Pomar Foundation for the use of the superb Penrose House facilities.
CESG-CMC Meeting 23 / 24 Jan 2007
MOIMS Report
p. 14
MOIMS SM&C WG
Attendance to the
Number of attendees
SM&C Meetings
16-Jan
am
16-Jan
pm
17-Jan
am
17-Jan
pm
18-Jan
am
18-Jan
pm
19-Jan
am
19-Jan
pm
21
24
33
27
24
12
28
21
24
Average
CESG-CMC Meeting 23 / 24 Jan 2007
MOIMS Report
p. 15
Proposed (WG chair) Goals for this Workshop
Identification of common SM&C approach with NASA
within CCSDS

Achieved: see next slide
Trade-off between Messaging Protocols (e.g. AMS, JMS,
etc.)

Achieved: SM&C architecture allows use of several messaging systems
Successful initial demonstration of SM&C Prototype

Achieved
Agree on way forward on draft high priority RBs towards a
target Agency Review in 2nd half 2007

Achieved: see next slide
status:
OK
comment:
X
CESG-CMC Meeting 23 / 24 Jan 2007
CAUTION
PROBLEM
MOIMS Report
p. 16
Common SM&C Approach with NASA
Very constructive participation
Agreed new books
organisation
Agreed contents of
SM&C Protocol
Agreed schedule for BBs publication



Messaging Abstraction Layer BB: end Dec 2007
Common Services BB: Mar 2008
Core Services BB: Mar 2008
CESG-CMC Meeting 23 / 24 Jan 2007
MOIMS Report
p. 17
XTCE
Awaiting for OMG approval
Started prototype mapping of Space Shuttle operational
database to XTCE.

High confidence that XTCE would work for future programs (e.g. CEV)
MB update available in Q2/2007
CESG-CMC Meeting 23 / 24 Jan 2007
MOIMS Report
p. 18
Resolutions
The SM&C resolve to request approval of the new WG charter
(update of book organisation and schedule)
The SM&C resolve to request confirmation to CESG that, after
demonstration of SM&C prototype V1 in Rome and SM&C
prototype V2 in Colorado Springs, the CCSDS requirements for
prototyping are fulfilled
CESG-CMC Meeting 23 / 24 Jan 2007
MOIMS Report
p. 19
Open Points / Matter of Interest
SM&C Charter

No response from CESG
CCSDS Web Site Improvement




Add statistics on books
Book planning information
Missing procedure/tool to allow submission and recording of problems
encountered by users of CCSDS standards
Map missions and usage of specific standards (see IOAG network infusion
progress)
CESG-CMC Meeting 23 / 24 Jan 2007
MOIMS Report
p. 20
Digital Repository Audit and Certification BOF
Goal

Obtain CCSDS / ISO approval of a standard that establishes the criteria that a repository
/ archive must meet to be designated an ISO Trusted Digital Repository.
Mailing list moims-rac set up, 103 members already
BoF meeting held, with 26 participants (including telecon & videocon)


Agencies: BNSC, CNES, ESA, NASA
Others:














Center for Research Libraries (CRL)
U North Carolina
Lockheed Martin
UK Digital Curation Centre (DCC)
CCLRC, UK
UOL, Brazil
Smithsonian Institution Archives
Center for International Earth Science Information Network (CIESIN), U Columbia
IPCSR
U of California, Office of the President
NARA/ U Maryland
Dutch National Library (KB), Netherlands
Humboldt University, Berlin
Charter agreed by BoF
CESG-CMC Meeting 23 / 24 Jan 2007
MOIMS Report
p. 21
Digital Repository Audit and Certification BOF
Issues / Actions
 CESG / CMC will investigate the best way to undertake parallel reviews
in CCSDS and ISO (e.g. creation of new ISO work item)
 CMC / ISO Liaison will investigate guidelines for ISO accreditation and
certification
CESG-CMC Meeting 23 / 24 Jan 2007
MOIMS Report
p. 22