Document 7216949

Download Report

Transcript Document 7216949

Status of Operational GNSS
Augmentations in United States
Pamela Gomez
Federal Aviation Administration (FAA)
WAAS GCCS Team Lead
GNSS In U.S.
•
•
•
U.S. Has Approved Use of Global Positioning System (GPS) For Aircraft Navigation
For Over A Decade
FAA Working With Other U.S. Federal Government Agencies To Insure Modernization
of GPS Improves Aviation Capabilities
FAA Has Commissioned the FAA’s GNSS Space Based Augmentation System (SBAS)
– Wide Area Augmentation System (WAAS)
•
FAA Is Continuing Development Of the GNSS Ground Based Augmentation System
(GBAS)
– Local Area Augmentation System (LAAS)
•
FAA Has Committed To A “Performance Based National Airspace System”
– Fully utilize the capabilities of all equipment aboard the aircraft
– Implement Required Navigation Performance (RNP)
GNSS SBAS (WAAS – In USA)
• Enhances Navigation In All Phases Of Flight
– Enroute, Arrival, and Departure:
• Provides 100% Availability Of GNSS For Even The Most Critical RNP or
RNAV Operations
• Provides Coverage At All Altitudes From 100,000 Feet To The Surface
• Provides Navigation Services To Users That Are Not Currently Served
– Approach:
• Enhances Safety By Providing Vertical Guidance To Every Runway End In
The Coverage Area
• No Ground Hardware Required At Airport
• Allows IFR Operations To All Qualified Airports
SBAS: WAAS Background
•
August 2000: FAA Makes WAAS Available For Non IFR Aviation Use
– Signal Available At Surface For All Users
•
July 2003: Initial Operating Capability (IOC) For All Aircraft Instrument Flight
Rule Use
–
–
–
–
–
100% Coverage CONUS & Alaska From 100,000 Ft. To Surface
Horizontal Accuracy 1.5M
Vertical Accuracy 3M
Better Than 99.999% Availability Of System
95% Availability In CONUS Of Instrument Approaches With Vertical Guidance
•
•
•
•
Enhances safety
250 foot Decision Height / ¾ Mile Visibility minimums
No ground hardware required
Instrument approach procedure required for each runway end
WAAS Architecture
Area Navigation Availability
Current LPV Approach Availability
WAAS Development Schedule
•
Development Will Continue In Two Segments
2003-2008
– LPV Segment
– GLS Segment
•
Improvements To Ground Components To Complete “LPV Segment”
– Software Efficiency Improvements, Integrity Monitor Improvements, And Additional
Ground Reference Stations Will Be Brought Online Incrementally
– End State Performance Will Result In Greater Availability Of Approach With Vertical
Guidance (LPV – 250ft Minimums)
• 99% Continental United States
• 95% In Most Of Alaska
•
•
Addition of GEO Satellites To Provide At Least Two In View To All
Users Over All CONUS And Alaska
Improvements To Ground Components To Complete “GLS Segment”
– Requires GPS Modernization – L5 Frequency
• WAAS 200’ Minimums (First WAAS Precision Approach)
– Requires Hardware And Software Modifications
2007
2008 -2013
Development Activities: LPV
•
Hardware
– 13 Additional Wide Area Reference Stations To Improve Availability And Coverage
•
•
•
•
•
4 Alaska
5 Mexico
4 Canada
Equipment Upgrade Using Commercial Off The Shelf Hardware When Feasible
Communications
– Enhancing The Terrestrial Communications Network
•
Software
– More Efficient Integrity Monitor Algorithms
– Enhanced O&M Efficiency
•
Prime Contractor - Raytheon
Predicted LPV Availability
2008 Full LPV Capability
North America
• USA, Canada, and Mexico Are Working Through The North
American Aviation Trilateral (NAAT) Regional Cooperation
Meeting On Civil Aviation Safety, Security, Capacity, And
Efficiency To Cooperate On The Implementation of GNSS In The
North American Region
• Canada And Mexico Will Host Additional Reference Stations To
WAAS System
– 5 Mexico
– 4 Canada
• Provides WAAS Coverage In Canada And Mexico
• Improves Availability For U.S.
Canada
• Installing Four Reference Stations
–
–
–
–
Goose Bay
Gander
Iqaluit
Winnipeg
• Site Surveys Complete
• First Two Sites Will Be Installed In August 2005, Second Two
Installed In August 2006
• Expect Operational In 2006 And 2007 Respectively
Mexico
• Installing Five Reference Stations
–
–
–
–
–
Mexico City
Merida
Puerto Vallarta
La Paz
Tapachula
• Three Site Surveys Completed In August, The Remaining Two
Next Summer
• First Three Sites Installed In August 2005, Second Two Installed
In August 2006
• Expect Operational In 2006 And 2007 Respectively
WAAS – GLS Development
•
•
Will Commence In 2008
In USA, GLS Capability Will Require Modernized GPS Constellation
– Addition Of Second Frequency, L5
– Availability Of L5 For Operational Use By Aviation Expected By 2013
– FAA Ground Upgrade Complete In 2013
•
Hardware:
– Upgrade of Reference Station Receivers To Receive L5
•
Software:
– Broadcast Of WAAS Message On L5
•
•
•
Will Eliminate Loss Of Vertical Guidance Caused By Ionospheric Storms
Full GLS Capability Throughout Coverage Area
System Will Be Capable Of Augmenting Other Satellite Navigation System
Constellations
Current GEO Service
Inmarsat III
INMARSAT 3
POR
178E
•
INMARSAT 3
AOR/W
54W
Main Problem Is Single Coverage Over the Majority of CONUS
INMARSAT III
• Current INMARSAT Lease Expires September 2006
• Market Survey Released In May For Possible Lease Extension
To 2009/2010
– Four Vendors Responded
• INMARSAT AOR-W Scheduled To Be Relocated From 54W To
98W In October 2005
– High Risk To WAAS Users In CONUS
– WAAS Team Performing Trade Study On Mitigation Options To Include
• Feasibility Study To Leave AOR In Place Until GCCS Becomes Operational
• Data Link Only During 22-day Relocation
GEO Satellite Improvements
• Lockheed Martin Prime Contractor
• Contract Definitization Expected To Be Complete February 2005
• Contract Structured to Provide:
– Leased Payloads on Up to 3 Satellites
– Ground Infrastructure to Support Signal in Space
• Goal is Two GEOs In View To All Users Over CONUS and Alaska
by 2007
PanAmSat at 133W
•
Ground Uplink Stations
– Signal Generator Subsystem (SGS) Factory Acceptance
Tests Complete
– Radio Frequency Unit (RFU) Installations Complete, Napa
CA and Littleton, CO
– SGS/RFU Integration starting February 05
•
PanAmSat Galaxy XV
– Satellite Payload Integration to be complete May 2005
– Delivered to Launch Site in June 2005
– 90-day Launch Window
•
•
•
GCCS Integration to be complete December 2005
WAAS Integration Activities
Operational 4th Qtr 2006
Telesat Anik F1R at 107W
•
Telesat Canada Anik F1R
– Satellite Payload Integration Complete
– Satellite in Thermal Vacuum Testing
– 90-day Launch Window July 2005 –
September 2005
•
Ground Uplink Stations
– Sites Selected
• Brewster, WA
• Woodbyne, MD
– Long Lead Items Procured
•
•
•
GCCS Integration to be complete April 2006
WAAS Integration
Operational 2nd Qtr 2007
GEO Transition
INMARSAT 3 PanAmSat TelesatINMARSAT
INMARSAT
3 AOR/W
133W
107W AOR/W 98W
POR
178E
54W
• Provides Dual Coverage Over CONUS and Alaska with AOR/W as hot spare
WAAS Avionics
•
Two Certified Receivers Currently Available
– Garmin & Chelton Systems (With Free Flight
Systems WAAS Sensor)
•
Garmin
– CNX-80
• Field Upgradeable to Complete WAAS
Functionalities
– GNS-480 (The Upgraded CNX-80)
• Sales Forecast Of 2,000 Units This Year
• Retail $11,995
– GNS-430/530
• Currently 50,000 Units Sold, Expect 30%
To Buy The Upgrade
• Approximately $1,500 for Upgrade, Available
October
– GNS-1000
• Plan To Offer Upgrade In 2005
WAAS Avionics
• Rockwell-Collins In Development Of WAAS Capability In MultiMode Receiver (MMR)
• Free Flight Systems Upgrading Sensor In Shelton CAPSTONE
Avionics To Provide Vertical Approach Capability
• Other Manufacturers Developing WAAS/SBAS Capable Avionics
• WAAS Avionics Can Be Installed In All Aircraft (Avionics Not Yet
Available For All)
• WAAS Integration Into Full Flight Management System (FMS)
Capability Expected Within Three Years
Operational Implementation
•
Existing Procedures:
– 57 LPVs
– 739 LNAV/VNAV
– 3,670 LNAV/GPS
•
LNAV/VNAV 350’
LPV 250’
GLS 200’
Procedure Production
– FY 05 Airport List Has Been Approved
• 214 Procedures Planned
• 122 Are at Non-ILS Runways
• 43 Provide Capability at Airports Where No Precision Approach Existed
– FY 06
• 341 Procedures Planned
• 258 Are at Non-ILS Runways
• 210 Provide Capability at Airports Where No Precision Approach Existed
3o
WAAS Schedule
Item
2005
2006
2007
2008
Commissioning (July 2003)
Alaskan Site Installation Complete
9/05
PanAmSat Launch
9/05
Telesat Launch
9/05
C & V Complete
Software Performance Build
10/05
5/06
Mexican Site Installation
8/06
Canadian Site Installation
8/06
PanAmSat Operational
10/06
Telesat Operational
10/06
TCS Complete
Initial WRS Sites Operational
JRC Decision on GLS Development
Software O&M Enhancements Complete
Full Integration
12/06
4/07
9/07
12/07
12/08
Potential WAAS Civil Applications
•
•
•
•
•
•
•
•
•
•
Agriculture
Aviation
Maritime
Highway
Railroad
Precision Timing
Mining/Geology
Surveying
Banking
Remote Sensing
•
•
•
•
•
•
•
•
•
•
Power
Telecommunications
Law Enforcement
Emergency
Disaster Response
Weather
Construction
Recreation
Environmental Mgmt
Mapping/Geodesy
Current WAAS/SBAS Civil Applications
•
•
•
•
•
•
Agricultural
Marine
Outdoor Recreation
Surveying
Emergency
Millions of Civil Users Today
GBAS/LAAS Status
• FY04 LAAS Was Directed to Research & Development Status
– Continuing Integrity Analysis for Category 1 LAAS
• LAAS Integrity Panel (LIP) to Resolve All Remaining Key Integrity Risks to
Low/Medium
• Develop Integrated Prototype to Validate Integrity Requirements
• FAA Continues to Support Development of LAAS Technology
However Budget Constraints Prevent Funding Development
Activity At This Time
• Customer Support
– Air Carrier/Cargo & Manufacturer Support Continues
Operational Implementation
• LAAS Criteria for Straight in Approaches Developed
• LAAS Capabilities to Support Terminal Area Procedures (TAP)
Demonstrated by WJHTC
• Implementation Activities Using LAAS Prototypes Being
Investigated
• Rockwell Collins LAAS Capable Multi-Mode Receiver (MMR)
available
• Boeing 737 GLS Certification Flights Completed
• AIRBUS GLS Certification Planned for 2005
International Activities
• Continue Support for RTCA/ICAO Requirements Process For
GBAS CAT II/III
– Support Harmonization Between RTCA and EUROCAE
• Continue Support of International GBAS Initiatives
– Brazil Testing and Data Collection
– Air Services Australia GBAS/GRAS Development Activities
– Coordination with European GBAS Working Group, International Service
Providers and Aircraft Manufacturers
• Eurocontrol Member States, Boeing, and Airbus
Summary: SBAS/WAAS
•
•
•
•
•
•
•
•
Benefits All Classes Of Aviation Users
Commissioned For IFR Use On July 10, 2003
Signal Enhances Navigation In All Phases Of Flight
WAAS Enhances RNP And Performance Based NAS
Enhances Safety And Efficiency Of NAS
Aviation Receivers Available Today, More Coming To Market Over Next Three
Years
Will Be Improved Incrementally To Bring Added Capability Online As Soon As
It Is Ready
Demonstrates FAA Commitment To Improving Services For All Aviation Users
http://gps.faa.gov
Regional Cooperation
New Sites
Latest GPS/SBAS Receivers For
Non-Aviation Use
Trimble R8
Magellan Road Mate
Automotive
John Deere StarFire iTC
Agriculture
Garmin Quest
Automotive/Marine/Adventure
Garmin StreetPilot 2620
Automotive
Lowrance LCX-104C Marine
Receiver
Current and Future LPV
Approaches
Charting with LPV minimum line
WAAS Channel
Number
Temperature Restriction
Does Not Apply to WAAS
Equipment
WAAS Approach ID
W=WAAS
24=Runway 24
A=1st WAAS Approach
To Rwy 24
LPV Minimum Line