CONTOH ANALISA HARGA SATUAN TITIK INSTALASI PENERANGAN
11,500 € 1
9,750 $1
NO
DESKRIPSI
TITIK INSTALASI
1 TITIK INSTALASI LAMPU PENERANGAN 220 V
Kabel NYM 3 X 2.5 mm2 - produk kabel 4 besar
Konduit PVC 3/4 inch - produk Clipsal/Ega
Klem
Tee-dos
Sock
Support lain-lain
Material
Labor
Material + Labor
Overhead Cost
Net Profit Pemborong
Harga Penawaran Pemborong
2 TITIK INSTALASI STOP-KONTAK 1 FASE 220 V
Kabel NYM 3 X 2.5 mm2 - produk kabel 4 besar
Konduit PVC 3/4 inch - produk Clipsal/Ega
Klem
Tee-dos
Sock
Support lain-lain
Material
Labor
Material + Labor
Overhead Cost
Net Profit Pemborong
Harga Penawaran Pemborong
UNIT
VOL
Harga Satuan RP
M
M
lot
bh
bh
lot
9.0
9.0
1.0
1.0
4.0
1.0
7,000
2,200
4,000
2,500
1,000
5,000
lot
1.0
25,000
14.9%
11.9%
M
M
lot
bh
bh
lot
12.0
12.0
1.0
1.0
6.0
1.0
7,000
2,200
4,000
2,500
1,000
5,000
lot
1.0
25,000
14.4%
12.0%
JUMLAH
Rp
63,000
19,800
4,000
2,500
4,000
5,000
98,300
25,000
123,300
25,000
20,000
168,300
84,000
26,400
4,000
2,500
6,000
5,000
127,900
25,000
152,900
30,000
25,000
207,900