Modesto Junior College Science Community Center Design Challenges Floor Vibration Criteria Telescope Vibration Criteria Horizontal Drift Joint Spiral Stairs Steel Subcontractor.
Download
Report
Transcript Modesto Junior College Science Community Center Design Challenges Floor Vibration Criteria Telescope Vibration Criteria Horizontal Drift Joint Spiral Stairs Steel Subcontractor.
Modesto Junior College
Science Community Center
Design Challenges
Floor Vibration Criteria
Telescope Vibration Criteria
Horizontal Drift Joint
Spiral Stairs
Steel Subcontractor – Walked Away
Moment Frame – Grade Beam Interface
Planetarium Door Widening
Floor Vibration Criteria
Lab Consultant:
W3 x 18 with 4 ½” normal weight concrete over the top of flutes;
total thickness = 7 ½”.
Vibration Criteria was Excessive – Added an additional $1,000,000 in
steel floor beam cost to the project – $500,000 per floor.
Compromise Solution – District not having vibration issues in current
facility:
Floor Beams:
Design for 125 psf Live Load, Non-reducible
Limit deflection to:
L/240 DL + LL
L/360 LL Only
Design floor beams as “non-composite” then install Nelson studs @ 12”
oc.
Foundation Model:
Design for 80 psf Live Load (reducible) & 20 psf partition load
(Designs like this give engineers a bad name!)
Telescope Vibration Criteria
Telescope Independent Space Frame
Horizontal Drift Joint
Spiral Stairs
Steel Subcontractor Disappeared!
Total number of
subcontractors on the
project =63
Number of
subcontractors that
filed for bankruptcy
during construction
of the Science
Community Center
= 33
Impact of steel
subcontractor going
away:
$2.4 million
4 ½ month project
delay
Steel pieces
scattered across
the project site.
Moment Frame Column Base
Planetarium “Door Widening”