AF Center for Systems Engineering TSPG Engineering Forum Mike Ucchino Chief, App/Dev Division AFIT/SYA 21 Jul 04
Download ReportTranscript AF Center for Systems Engineering TSPG Engineering Forum Mike Ucchino Chief, App/Dev Division AFIT/SYA 21 Jul 04
AF Center for Systems Engineering
TSPG Engineering Forum
Mike Ucchino Chief, App/Dev Division AFIT/SYA 21 Jul 04
SECAF Direction
• Develop Plan to strengthen Air Force’s systems engineering capabilities • “Create an Institute for Systems Engineering”
AFMC SE Forum
SE process not broken – inconsistent application of the process causing the problems
AFIT Organization
Systems Engineering Senior Council AFIT Commandant Brig Gen (Sel) Eidsaune Engineering Interim Director -Mr. Wilson
Advocacy Collaboration Consultation
Civil Engineer & Services School AU Board of Visitors AFIT SE Subcommittee Communications & Info Services Major Trautmann Provost Acting - Dr Calico
- New Reorganization
CSE Goals
SYA
•
Influence and institutionalize systems engineering process
– Policy, process, practices, tools • Collaboration with government, industry & academia – Advocacy / consultation – Rotational program
SYE
•
Educate the workforce
– Academic programs • Graduate programs – MS, PhD & certificate • Seminars, workshops, short courses • Provide accessibility at key DoD locations – Case studies
Systems Engineering
…an interdisciplinary approach encompassing the entire set of scientific, technical, and managerial efforts needed to evolve, verify, deploy (or field), and support an integrated and life-cycle balanced set of system solutions that satisfy customer needs.
Needs Solution
4/29/2020 7:05 PM DRAFT 5
Systems Engineering Solutions Required Capability
MODs Capability Requirements Documents Operational } Missions Systems Engineering Process
Connection
{ Weapon Systems Eng Data TOs Spares Support Equip Training Facilities
Process vs Organization
LIFE CYCLE Program Management Process (Systems Engineering Process) Development Production Modifications Supply Maintenance Depot
AQ / XR
Acquisition
IL / LG
Logistics
OSD / NDIA
•
Oct 03: Systems Engineering Summit
– Government, industry, and academia participated – Brainstormed 38 potential SE action items • Developing guides • Requiring a systems engineering plan • Making policy/regulation/process changes • Developing contractual incentives • Refining educational/training template requirements – Looking at consolidating as many as possible • Some already addressed through other efforts – Identifying short/long term efforts
SEP Guide
•
USD(AT&L) policy memo, dated 30 Mar 04
− SE processes – what standards, CMM, etc will be used − Technical baseline – how is it developed, managed, and controlled − Technical reviews • Assess program technical maturity • Assess program technical risk • Support program decisions − Integrate SE into program’s IPTs • Describe integration/coordination across IPTs • Describe IPT organization • Identify SE tools employed •
CSE developing further guidance for program offices
SAF/AQ
•
Main Objectives
– Establish program environment founded on robust development principles • Promised capabilities delivered on schedule & within budget • Scalable/expandable solutions to meet future needs • Desensitized to manufacturing & operational variations – Key SE elements given principle consideration • Solicitation, award, and execution processes – Proactive SE leading indicators utilized • Mapped to incentive strategies • Measurable • Minimize surprises – Change government and contractor emphasis as needed
SAF/AQ Actions
• Issued Increment 2 Systems Engineering policy memorandum • Issued guide for Robust Engineering Methodologies • Leveraging Lean Aircraft Initiative tenants/processes that can improve SE application • Will develop training and impose minimum qualification requirements for critical positions, e.g., SPD/PM, Chief Engr, IPT Leads • Increment 3 Systems Engineering policy will focus on workforce development
Robust Engineering Guide
•
“Robust engineering” guidance
– Disciplined systems engineering – Robust product design •
Contractual guidance
– Section M – Section L – Incentives •
Technical management leading indicator examples
– Pro-active measures of SE process effectiveness – Flag potential problem areas in time to fix •
Available on CSE website (http://cse.afit.edu)
Robust Engineering Guide
•
Robust product designs try to anticipate:
– Technology advancements – Commercial product utilization – DoD imposed constraints – Obsolescence – Future requirements – New operational missions and roles – Interoperability – Network-centric applications – etc
Robust Engineering Guide
•
Factors to consider when assessing contractor technical capabilities and performance
– – – –
Uses disciplined systems engineering processes
•
Requirements analysis and allocation
• • • • • • • •
Robust design principles Trade studies/analyses Risk management Configuration management Mfg/QA processes Technical reviews Verification/validation etc Qualified, trained staff assigned to program SE tools effectively and efficiently used
•
M&S
•
CMMI
•
etc Subcontractors employ same processes and principles
Robust Engineering Guide
•
Six critical systems engineering areas drive most cost/schedule/performance risks
– Requirements definition – Design maturation – Subcontractor management – Test and evaluation / verification and validation – Manufacturing – Sustainment
Robust Engineering Guide
• Some leading indicator examples
– Change activities vs time – Specifications approved vs planned – Subcontracts signed vs planned – Engineering manpower vs planned – Design documentation vs planned – Actual TPMs vs planned – Deficiency/trouble reports vs expectations – Verification activities approved vs planned – Actual schedule vs planned – Design review AIs closed vs scheduled
• Applicable to subcontract management as well
CSE Website
• • • • • • •
Educational Opportunities
– Curriculum (Degree / Certificate / Continuing Education)
Available Resources
– Case Studies – Tools – Best Practices – Guidance Documents
Ongoing Research Consultation Services
Target IOC: Summer 04
Internet Links
– Policy / Stakeholders
Significant Upcoming SE Events Business Portal Interface