Proposed Cowlitz PUD Airflow
Management Pilot
Presented at the RTF IT Subcommittee
March 5, 2013
Kerstin Rock, Director
Michelle Lichtenfels, Senior Program Manager
Agenda
• Pilot Design
• Pilot Objectives
• Pilot Scope
– Assessment
– Customer Implementation
– M&V
• Questions
AFM Pilot Design
• Scaled for small to medium-sized data centers
• Typically focused on identification of a series of
simple and low- or no-cost measures related to
airflow and thermal optimization
• Implementation typically results in higher supply
air temperature and reductions in airflow for
improved energy efficiency
– Reduce HVAC system airflow to match IT
equipment airflow and higher supply air
temperatures
Pilot Objectives
1. Savings-generating pilot
2. Identify & facilitate implementation of
energy-focused airflow improvements in
the data center
3. Pilot AFM approach and collect regionspecific data
–
Test tools, protocols, and processes
4. Queue up airflow solutions for the utility
environment
Pilot Scope
• 3 sites (commercial and/or
industrial)
• Comprehensive assessment of
data center
• Detailed energy savings report &
suite of recommendations
• Project implementation support
• Follow-up verification of
measures
• Develop case study
AFM Assessment
Airflow and Temperature Management
Measures
Airflow

Add partitions

Add strip curtains

Reposition floor tiles

Plug holes in floor tiles

Remove airflow obstructions

Blank off empty racks and cabinet / rack gaps

Add VFDs to supply fans

Turn off redundant CRACs

Improve RA pathway

Rearrange servers
Temperature

Increase SATs
Humidity

Coordinate humidity setpoints
Customer Implementation
Turn off redundant CRACs
Rearrange
servers
Increase SATs
Remove airflow
obstructions
Add partitions
Install blanking panels
Plug holes in floor tiles
Coordinate humidity
setpoints
Pilot Project Estimates:
Implementation Cost:
Simple Payback:
$13,000
2.6 years
Move floor
tiles
Add VFDs to supply
fans
M&V and Project Completion
• End-Use Metering
Protocol
– Aligned with IPMVP
Option B