An Investment in our Future $100-150 Million investment in three transportation projects prioritizing the movement of people to and through the Loop Washington/Wabash.

Download Report

Transcript An Investment in our Future $100-150 Million investment in three transportation projects prioritizing the movement of people to and through the Loop Washington/Wabash.

An Investment in our Future
$100-150 Million investment in three transportation projects prioritizing
the movement of people to and through the Loop
Washington/Wabash CTA Station
Loop Link
Union Station Transit Center (USTC)
Improves access, speed, and reliability for over 250,000 daily transit trips
Commitment to world-class transportation system that benefits residents,
employers and employees, and tourists
Improvements to traffic flow and safety for all users of the roadway –
pedestrians, transit users, bicyclists and motorists
2
Downtown Benefits
Demonstrates commitment to world-class sustainable transport
Convenient, expanded access to more downtown destinations
Improved multi-modal connections between bus, rail and bike
Enhances downtown’s attractiveness for business, better job retention
Further extends transit’s reach in city and suburbs
65% of Loop commuters currently arrive by transit
Faster, more reliable commute times
Generates pedestrian traffic to retailers
Loop Link – Project Purpose
Improve mobility in the Loop for residents, employees, businesses and
visitors
Provide faster, more reliable bus service
Organize traffic flow and improve pedestrian environment and bike network
4
Loop Link Features
Dedicated bus lanes with red concrete surface for 6 bus routes
8 Link Stations with easy boarding
Bus Queue Jump at 7 intersections
Protected bike lanes and bicycle traffic signals
Resurfacing of all impacted streets
New pick-up/drop-off configuration at Union Station on Canal Street
Loop Link Features
Loop Link Corridors & Station Locations
Link Stations
Platform lengths vary between 115’ and 153’ to accommodate two articulated
buses at the same time, plus access ramps
90’ station shelter compared to current 14’ JC Decaux shelter
Visually appealing and transparent to maintain sightlines of adjacent
buildings/businesses/sidewalks
Station 14’ high to shelter boarding/alighting passengers
Pedestrian Benefits
Increased sidewalk space by removing existing bus shelters and signs from
the sidewalk
Reduced conflicts at intersections with changes to traffic signals and turn
restrictions
Link stations and/or protected bike lanes buffer pedestrians from motor
vehicle traffic
Transit Rider Benefits
Improved bus service reliability and travel times with exclusive bus lanes
New distinctive bus stations with level boarding, weather protection,
lighting, and real time LED bus arrival times
Better and more understandable wayfinding, including connections to/from
Metra and CTA Rail
Improved safety and security with installation of CCTV cameras
Accessibility for persons with Disabilities (ADA)
Bicyclist Benefits
Direct connections to
existing bikeways
Eastbound & westbound
barrier protected bike lanes
connecting the Loop to
Ogilvie Transportation
Center
Two-way barrier protected
bike lane on Clinton Street
eliminates conflicts on
Canal Street
Eliminates bike/bus
conflicts on Madison Street
Existing Bikeway
Proposed Bikeway
Removed Bikeway
Motorist Benefits
More reliable travel times due to reduced conflicts with buses and bikes
Improved turning movements with changes to traffic light phasing
Protected right turns can increase turning capacity and reduce conflicts with peds and bikes
Permissive/protected left turns will increase turning capacity and reduce conflicts with peds
At least two general traffic lanes maintained on all streets
Buses will no longer operate on Monroe Street, reducing conflicts/congestions
All garages/alleys will remain accessible
New drop-off/pick-up area at Union Station
Roadway Changes
All existing right and left turns will be maintained except at 4 locations where
right turns will be restricted for safety reasons and improved traffic flow
Various design treatments and traffic signal modifications will be used to
organize traffic, increase safety for all modes, and maintain throughput
Loading and Curbside Uses
To increase bus speed and reliability, better organize traffic, and improve traffic
flow, curbside uses will be altered on most blocks along the Link corridors and
prohibited on some
This includes legal and illegal parking, standing, loading, and pick-ups/drop-offs
CDOT has identified potential alternative locations to perform existing curbside
activities, including cross-streets, alleys, and modifications to existing curbside
regulations
CDOT will meet/work with all stakeholders along the corridors (buildings and
businesses) to ensure their needs are met
Education and Enforcement Efforts
CDOT will issue flyers and media information prior to Link implementation
describing the changes to the roadway configuration and curbside use
restrictions
CDOT will work with various stakeholders who frequently utilize the corridors,
but do not live/work/own on the corridor, to ensure these stakeholders
understand the changes to the roadway configuration and curbside use
restrictions
FedEx, UPS, USPS, Brinks, charter buses, etc.
CDOT will work with the Chicago Police Department (CPD) and the Department
of Finance to ensure all users of the roadway are complying with the new
roadway configuration
Construction Phasing - Estimated
March 16: Madison and Clinton
Madison: begins at State and progresses westbound; work on Madison between Michigan and State will
occur in the summer
Clinton: begins at Randolph and progresses southbound
April: Union Station Transit Center
Jackson, between Clinton and Canal
Spring: Washington and Canal
Washington: begins at Clinton and progresses eastbound
Canal: begins at Van Buren and progresses northbound
Late-Summer: Randolph
Repaving/bike lane installation begins at Michigan and progresses westbound
Water Department construction on Randolph commences in spring before Loop Link work
Late-2015: Loop Link ready for use
Spring 2016: Canal
Median installation between Adams and Jackson
Coordinating with adjacent projects to minimize traffic impacts
Washington/Wabash CTA Station
Union Station Transit Center
Adams Street Viaduct
Questions?