SRC Risk informatics SOI Hydrometcentre of Russia AA RI SIMULATION OF THE BEHAVIOR OF OIL SPILLS IN THE COURSE OF OIRFP "PRIRAZLOMNAYA“ OPERATION. ASSESSMENT OF THE POSSIBILITY.

Download Report

Transcript SRC Risk informatics SOI Hydrometcentre of Russia AA RI SIMULATION OF THE BEHAVIOR OF OIL SPILLS IN THE COURSE OF OIRFP "PRIRAZLOMNAYA“ OPERATION. ASSESSMENT OF THE POSSIBILITY.

SRC Risk informatics
SOI
Hydrometcentre
of Russia
AA RI
SIMULATION OF THE BEHAVIOR OF OIL SPILLS IN THE COURSE
OF OIRFP "PRIRAZLOMNAYA“ OPERATION.
ASSESSMENT OF THE POSSIBILITY OF EMERGENCY
RESPONSE RELATED TO OIL SPILLS
Moscow 2012
SOURCES AND SCENARIOS OF OIL SPILLS
According to the Customer's initial data the following
sources and scenarios of oil spills are to be considered:
o oil spill in an open uncontrolled flowing wells –
1,500 tons in 72 hours;
o oil spill resulting from a tanker accident –
10,000 tons in 120 hours;
o oil spill resulting from temporary storage leakage of
oil at the OIRFP – 16,000 tons in 120 hours.
RISK OF EMISSIONS BY ACCIDENTS AT WELLS
Distribution of time needed to recover control over flowing well
RISK OF OIL SPILL FROM TANKER ACCIDENT
Probability of zero spills in collisions and landings tankers with deadweght of
Revised Interim Guidelines for the Approval of Alternative Methods of Design
60 ,000 tons – 0.81
and Construction of Oil tankers under Regulation 13F (5) of Annex I of
MARPOL 73/78 Resolution IMO MEPC.110(49), 2003
Estimating probability of a spill with volume of 10,000 tons for tankers with a deadweight of
60,000 tons - http://efficiensea.org
Average volume of spills in collisions and landings of tankers with a deadweight of
60,000 tons – 5,169 tons, probability of exceedance – 8,5×10-5
Probability of spills 10,000 tons or more in collisions and landings of tankers with a
deadweight of 60,000 tons – 2.5×10-5 ×(1-0.81) = 4.85×10-6
OIL FEATURES
According to: Oil and gas condensate in Russia. Handbook. Volume 1. Oil in European part
of Russia and gas condensate in Russia. Ed. K.A. Demidenko. Moscow: Pbl.h. "Tehnika",
2000.
Features
Density by 20 °С, kg/m3
Kinematical viscosity by 20°С, mm2/s
Congelation point, °С
Gas-oil ratio, м3/м3
Concentrations, % mае.:
total sulfur
paraffins/melting point
silica gel resins
asphaltenes
Fractional composition
Concentration
Density
% mass.
by 20 °С, kg/m3
4.5
730.2
Figures
911.0
19.3
-30
2.2
1.8/50
11.0
2.0
Kinematical viscosity
by 20 °С, mm2/s
-
Fraction b.p.-120 °С, %
mass.
11.7
751.8
Fraction b.p.-180 °С, %
mass.
11.9
791.0
1.35
Fraction 120-210 °С, %
mass.
31.6
840.0
3.50
Fraction 120-311 °С, %
mass.
Emissions of reservoir
water is not
taken into account 4.9
26.8
859.2
Fraction 180-320 °С, %
(the initial period of operation)
mass.
61.5
950.0
Fraction > 320 °С, % mass.
BASIC DATE
1.
2.
3.
4.
5.
6.
For the calculation we used data from NCEP / NCAR reanalysis for a
10-year period from 01.01.2002 to 31.12.2011. Spatial resolution data in
the platform area is ~ 12 km x 34 km, the discreteness in time is 1
hour.
Calculation of the velocity fields of near-water wind was produced
according to the fields of atmospheric pressure used with the
processing by the method of Russian Hydrometcentre of Russia (by
Popov, S., Lobov A.) on a grid of 5 * 5 nautical miles.
Calculated near-water wind fields used for calculation of ocean
currents in the basin of the Barents Sea.
Fields of currents and wind are calculated in increments of 1 hour,
each year includes about 8,000 meteorological situations.
Each of the seasons, ice (January-May) and ice-free (July-November)
recorded 36 240 cases.
For estimates of restrictions on the responses two other sources of
data on wind conditions were considered. Comparison showed a fairly
high correlation between all the data.
HYDROMETEOROLOGICAL CONDITIONS
(EXAMPLES)
Sea level pressure and near-water
wind for 15 hours of July 14, 2009
Sea level and current velocity
on the surface for 15 hours of
14 July 2009
HYDROLOGICAL CONDITIONS
(EXAMPLES)
September
Ellipses of tidal currents of M2 wave at the sea surface
(The color shows counter-clockwise rotation)
April
ICE CONDITIONS
1. To consider the ice conditions we used climatic maps
of ice boundaries with defined levels of cohesion.
2. Characteristics of ice conditions in the ISM point
prepared by specialists at AARI (V. Smolyanitsky and
V. Stanovoy). Information about ice conditions
obtained by AARI from Global data assimilation
system (GDAS), operating in Global Forecast System
(GFS) NCEP / NOAA (USA).
3. Spatial resolution of the date 20 km  20 km, discretion
by time of 3 hours.
OIL WEATHERING
Oil spill of 16,000 tons in 5 days
Oil spill of 1,500 tons in 3 days
OIL WEATHERING
Estimates show that changes in viscosity due to evaporation are
small and make several percent (max. 4%).
At the same time, the viscosity can increase about 20 times due to
emulsification, taking the maximum water concentration in oil for
70%.
Oil density starting with a value of 911 kg/m3, due to evaporation
increases up to 1,021 kg/m3, and further, due to emulsification, goes
to the turn of 1,025 kg/m3.
ISM oil can have a high ability to go underwater due to a low
buoyancy balance.
POSSIBLE OIL POLLUTION OF OFFSHORE WATERS AND
COASTAL WATERS Spill of 1,500 tons in 3 days
Ice period
Non-ice period
POSSIBLE OIL POLLUTION OF OFFSHORE WATERS AND
COASTAL WATERS Spill of 16000 tons in 5 days
Ice period
Non-ice period
SPILL SPREAD RISK ZONES
Spill of 1,500 tons in 3 days,
foil thickness > 10 mk
Ice period
Non-ice period
SPILL SPREAD RISK ZONES
Spill of 1,500 tons in 3 days,
foil thickness > 50 mk
Ice period
Non-ice period
SPILL SPREAD RISK ZONES
Spill of 16,000 tons in 5 days,
foil thickness> 10 mk
Ice period
Non-ice period
PROBABILITY OF WATER AREAS POLLUTION
Spill of 1,500 tons in 3 days,
foil thickness> 10 mk
5 days
Ice period
Non-ice period
PROBABILITY OF WATER AREAS POLLUTION
Spill of 1,500 tons in 3 days,
foil thickness > 10 mk
10 days
Ice period
Non-ice period
PROBABILITY OF WATER AREAS POLLUTION
Spill of 16,000 tons in 5 days,
foil thickness > 10 mk
10 days
Ice period
Non-ice period
PROBABILITY OF COASTS POLLUTION
Spill of 1,500 tons in 3 days,
foil thickness > 10 mk
10 days
5 days
PROBABILITY OF COASTS POLLUTION
Spill of 1,500 tons in 3 days,
foil thickness > 50 mk
10 days
5 days
PROBABILITY OF COASTS POLLUTION
Spill of 16,000 tons in 5 days,
foil thickness > 10 mk
10 days
5 days
PROBABILITY OF COASTS POLLUTION
Spill of 16000 tons in 5 days,
foil thickness > 50 mk
10 days
5 days
CALCULATED SCENARIOS
(1,500 tons/3 days, pollution of the Ostrov Matveyev (Matveyev
Island), 25 hours)
CALCULATED SCENARIOS
(1,500 tons/3 days, access to Dolgiy island, 18 hours)
Quick transfer results in high dispersion
CALCULATED SCENARIOS
(16,000 tons/5 days, pollution of islands Matveyev and Dolgiy, 96
hours)
Time to reach the coastline 44 hours. Total length of
shoreline affected 56,124 m.
Mass on the shores = 235
tons
Wind, m/s
Current, cm/s
CALCULATED SCENARIOS
(16,000 tons/5 days, pollution of islands Matveyev and Dolgiy, 96 hours)
Transfer dynamics
Wind m/s
Time to reach the
coastline 17 hours
(islands). The
total length of the
affected coastline
- 40 km. Oil mass
on coast = 87
tons
Current, cm/s
CALCULATED SCENARIOS
(16,000 tons/5 days, pollution of islands Gulyaevskiye Koshki,
96 hours)
Time to reach the coastline 54 hours. Total
length of shoreline affected 36,430 meters. Oil
mass on coast = 455 t.
Wind, m/s
Current, cm/s
CALCULATED SCENARIOS
(16,000 tons/5 days, pollution of the coast Varandey, 96 hours)
Time to reach the coastline 43 hours. Total
length of shoreline affected 17,937 m. Oil mass
on coast = 344 t.
Wind, m/s
Current, cm/s
EXISTING AND PROPOSED PROTECTED AREAS IN THE BARENTS SEA
habitat for birds and the area covered by
the Ramsar Convention
specially protected
natural sites
ENVIRONMENTALLY SENSITIVE AREAS IN THE BARENTS SEA
habitat for birds
coast types
SPILL ELLIMINATION PERFORMANCE
STATISTICS
Elise DeCola. Review of Oil Spill Responses on ModeratelySized Spills in US Waters from 1993-2000.
NUKA Research&Planning Group, 2002
TERMS OF RESPONSES - CURRENT
The distribution of current
velocity in the ice season
OIRFP AREA
The distribution of current velocity in
the non-ice season
TERMS OF RESPONSES - WIND
Frequency of wind speed
>7,5 m/s
Frequency of wind speed
>10 m/s
Frequency of wind speed
>12,5 s/m
TERMS OF RESPONSES - COMMOTION
Frequency of occurrence of
significant wave with height of 1.5 m
The distribution functions fo significant wave
height (SWH) were constructed according to
the calculation of wind waves on the spectral
model WaveWatch III version 3.14 [Tolman,
H.L., 2009: User manual and system
documentation of WAVEWATCH III version
3.14. NOAA / NWS / NCEP / MMAB Technical
Note 276, 194 pp + Appendices at
http://polar.ncep.noaa.gov/waves/wavewatch/].
The frequency of occurrence of
significant wave height exceeding
2.5 m
TERMS OF RESPONSES - CURRENT
The frequency of flow
velocity > 0.9 knots
Pechora Sea
The frequency of flow
velocity > 1.2 knots
TERMS OF RESPONSES - OBSERVABILITY
Duration of OSR work based on day light
ICE CONDITIONS
ICE CONDITIONS
ICE CONDITIONS
Average Climatic borders of the ice with 30% cohesion
ICE CONDITIONS
Information on the ice
was obtained by AARI
from Global data
assimilation system GDAS, operating in
Global Forecast System
- GFS, NCEP / NOAA
(USA).
The spatial resolution of
the data ~20 km x 20 km,
time discretion 3 hours.
The cohesion of ice in the vicinity of the OIRFP
(2010-2012)
EXTREME ICE CONDITIONS
Cohesion of ice for 31.01.2011 according to NIC
(National / Naval Ice Center NOAA)
CALCULATIONS IN ICE CONDITION, SAMPLES
(1,500 tons/3 days, 18.11.2000)
CALCULATIONS IN ICE CONDITION, SAMPLES
(16,000 tons/5 days, 20.11.2000)
CALCULATIONS IN ICE CONDITION, SAMPLES
(10,000 tons/5 days, 24.11.2000)
OSR RESCUE MEANS
The vessel "Vladislav Strizhov"
The vessel "Toboy", Varandey
terminal "
BRAND NEW CONSTRUCTION MULTIFUNCTIONAL ICE
CLASS VESSELS
The vessel "Yuri
Topchiev"
Federal Program "Development of the transport system of the Russian Federation (20102015) years," provides the construction of specialized rescue vessels :
•
rescue vessel 7 МВт by project MPSV06 - 4 units in 2012-2015;
•
rescue vessel 4 МВт by project MPSV07 - 4 units in 2011-2012;
•
rescue boom-laying boat by project A40-2Б - 12 units in 2010-2014.
MPSV06
MPSV07
RECOMMENDATIONS FOR EQUIPMENT OF OSR SHIPS
It is recommended to consider the necessity and appropriateness of the equipment of OSR ships by
following special systems and equipment :
1.
2.
3.
4.
5.
6.
7.
8.
9.
execution and placement, taking into account the use of equipment in arctic conditions (winterization
- shelter, heating, frost protection, maintenance, etc.);
special surveillance systems for water surface to detect and estimate parameters of oil spills
(specialized detection and control over spills system, side-scan sonar with variable frequency aperture
on the ship, laser fluorometer in a helicopter);
kits with coils and circuits enclosing booms with energy boosting blocks enclosing booms);
means of launching, hauling, control and recovery-gathering equipment (slips, crane girders, cranes,
controllers, towing devices, etc.);
kits for the collection of various types of oil;
sets of mounted oil-gathering systems for trawling and taking oil from contaminated waters;
set of equipment for emergency transfer of oil and petroleum products from vessels in distress
(pumps, hoses and connections for the reception and transmission to be performed, adapted for
operation in ice conditions and heavy oil);
power units and hydraulic actuators of oil collecting devices (usually bundled with the device);
piping and pumps for receiving and pumping oily mixture, including those with a flashpoint below
60°C, from the oil-gathering devices overboard, working at low temperatures and ice conditions;
RECOMMENDATIONS FOR EQUIPMENT OF OSR SHIPS
10. tanks for receiving and storing the collected hydrocarbons, including those with a flashpoint below
60° C; fittings;
10. steam generators and steam lines for processing and cleaning of equipment contaminated with oil;
11. boom-laying boats of necessary power and autonomy navigation with equipment for exploration of oil
pollution, complex (involved in oil recovery orders), and independent OSR operations, (delivery and set
up of light protective boom barriers in shallow water);
12. hydromonitors for cleaning the ice overboard and on board of a ship;
13. clamshell devices and other types for collection on board the contaminated snow and ice;
14. equipment for purification of contaminated snow and ice on board (open container with removable
slatted flooring and heated);
15. kits and equipment for work on the ice cover;
16. steam generators and steam lines for processing and cleaning of equipment exposed to icing and oil
pollution;
17. separation equipment for the primary water separation of the mixture collected;
18. control devices and pipelines for release of purified water with continuous monitoring of the volume
and content of hydrocarbons on the release;
19. standard hoses and unified connectors for delivery of oil to transport vessels and terminals;
RECOMMENDATIONS FOR EQUIPMENT OF OSR SHIPS
21. supply of free floating buoys with GPS transmitters, buoys with reflectors and beacons;
22. supply of light and reflecting markers to be installed on a descent overboard equipment;
23. set of security tools by OSR works (PPE, sensors for dangerous concentrations of hydrocarbons,
devices for determining the flash point of hydrocarbon);
24. additional means of illumination of the sea surface;
25. kits for sampling of oil pollution (water, ice and snow) overboard and in containers;
26. instrumentation and analytical tools for sampling and determination of the hydrocarbons in the water
discharged;
27. instrumentation for the treatment of operations with oil;
28. placement of stocks of materials and equipment for preparation and spraying of dispersants - when
making a decision about the use of dispersants.
APPLIED OSR TECHNOLOGY
Technology and examples of equipment
Terms of use
Localization by oil barriers and/or oil-gathering trawling order (J-order) Booms in open sea with the height of the board
with boom-laying boats
Open water, favorable weather conditions, compact spill
Trawling with mounted oil recovery systems with branches in the
outrigger booms
Open water and low water (20-30%), the cohesion of the ice
Collection of oil with skimmer descent from the board (such as Free
Floating Offshore)
The cohesion of the ice up to 50 %
Collection of oil using on-board (such as Oil Ice Separator to collect
oil en route) or external (such as Oil Recovery Bucket to collect oil in
the drift and/or SEA-MOP) systems
The cohesion of the ice up to 50-70%, broken ice
Collection of oil with a descent from board (such as Arctic Skimmer)
or remote (such as Oil Recovery Bucket and/or SEA-MOP) skimmer
The cohesion of ice up to 90%
Collection of broken ice with ascent and on-board processing
The cohesion of ice up to 90%
Delivery of oil to tankers and offshore installations
With control of the composition and volume of oily mixtures
transferred
Initial cleaning of oily mixture and discharge of purified water
Controlled burning with the introduction of the initiators of combustion
The use of dispersants by spraying from a craft and a helicopter
In conjunction with overboard
ice washing with water
With control of the concentration of oil on discharge
A massive sluggish spill, including ice conditions, approval by
the environmental authorities
With the threat of pollution of protected areas and sensitive
coastal areas, coordination with environmental authorities
WORK EXECUTION TECHNOLOGIES
Ice conditions - skimmer LAS 125 W/P
Features
Figures
Performance
Up to 70 m3/h
Collecting efficiency
No less than 90 %
Drive
hydraulic, 8 kWt
Oil delivery pump
centrifugal
Archimedes screw
The descent / ascent to the
water / management
crane
Dimensions
1,85 м  1,41 м 
2,18 м
750 kg
Weight
WORK EXECUTION TECHNOLOGIES
Ice conditions - skimmers
RO-MOP, SEA-MOP
WORK EXECUTION TECHNOLOGIES
Remote hydraulic grab
External brush skimmer Oil
Recovery Bucket
QUESTIONS CRUCIAL IN THE SENSE OF OSR
1. Ensuring OSR :
•
anti-blowout equipment;
•
external fire fighting;
•
supply vessels (boats for oil recovery orders, boom barriers to
contain and haul, oil-gathering system, reception and removal of
collected hydrocarbons);
•
hydrometeorological supply;
•
eco-monitoring and monitoring at the working period;
•
helicopter and ship (icebreaker) supply (reconnaissance).
2. OSR Operations Management :
•
unity of Operations Management;
•
Operational monitoring and forecasting the spread of spills and
alert shore-based services;
•
coordination of the LRA "sea-shore";
•
mobilization and engagement with the forces and means.
QUESTIONS CRUCIAL IN THE SENSE OF OSR
3. Staff and facilities :
• training of staff (recruitment and / or creation of ASF);
• boats (specifications for ice conditions, contracts for ship
maintenance and servicing);
• boom barriers;
• skimmers and oil-gathering system;
• Trawling spills (mounted systems);
• reception and storage of oily mixture (contracts for vessel services).
4. Quality of contracts of LRA OSR :
• compliance with the Plan of OSR;
• composition and deployment of forces and equipment (security
levels);
• preparatory activities (scouting, reconnaissance, deployment and
mobilization);
• readiness (location, speed);
• control over the work period (public, corporate and authorized
supervision).
ORIGIN, DEVELOPMENT AND THE ELIMINATION OF SPILLS OF HYDROCARBONS,
ASSESS OF THE EFFECTIVENESS OF THE MEASURES
Environment
Environmental sensitivity
Financial and material
resources
Influence
Leakage and
spills
Control over
sources
Transfer and
weathering
Control over
spills
Impact on
water area and
coast
Environmental
damage and
consequences
Fees and
Compensations
Localization
and collection
Elimination and
recovery
Elimination
costs
??? applicability in
Arctic???
??? Efficiency ???
??? Efficiency???
Planning and
application
Establishment
costs
Development
dynamics ES(Н)
Costs of
maintaining
readiness
Decisions making
??
?
E
F
F
I
C
I
E
N
C
Y
??
?
ISSUES TO BE SOLVED
1. Oil properties:
behavior at low temperatures;
tendency to form emulsions "water in oil".
Equipment features :
equipment tests;
determination of the limiting characteristics of the
equipment under the terms of the wind, currents,
commotion.
3. Preparedness:
• training of staff;
• Adequacy of equipment and software for arctic
conditions;
• providing transport to remote areas;
• mobilization of additional resources;
• interaction with the terminal Varandey.
•
•
2.
•
•
ISSUES TO BE SOLVED
4. Working in difficult conditions :
• control over spills at night;
• control over spills in ice conditions, including longterm (remote detection, drifting buoys, etc.);
• work in the ice conditions and on ice;
• limitations of illumination and visibility.
5. Environmental security :
• account of the victims and help for animals and
birds.
6. etc.