Concrete and Masonry Construction 29 CFR 1926, Subpart Q General overview of the OSHA regulation  Definitions  General • • • • requirements Load placement Impalement hazards Post-tensioning operations Concrete buckets  Hazards of working.

Download Report

Transcript Concrete and Masonry Construction 29 CFR 1926, Subpart Q General overview of the OSHA regulation  Definitions  General • • • • requirements Load placement Impalement hazards Post-tensioning operations Concrete buckets  Hazards of working.

Concrete and
Masonry Construction
29 CFR 1926, Subpart Q
General overview of the
OSHA regulation
 Definitions
 General
•
•
•
•
requirements
Load placement
Impalement hazards
Post-tensioning operations
Concrete buckets
 Hazards
of working with
concrete
1a
Equipment and Tools
 Bulk
cement storage
• Lockout/Tagout
 Concrete
mixers
 Power concrete trowels
 Concrete buggies
2a
Equipment and Tools
 Concrete
pumping systems
 Tremies
 Bull
floats
 Masonry Saws
2b
Cast-in-place concrete
requirements
 General
requirements for
formwork
• Support without failure
• Drawings and plans
3a
Cast-in-place concrete
requirements
 Shoring
and reshoring
• Inspection of equipment
• Damaged equipment strength
requirement
• Inspection of
erected
equipment
3b
Cast-in-place concrete
requirements
 Shoring
and reshoring
• Strength requirements after
erection
• Firm contact and security
• Eccentric loads
• Tiered single
post shores
• Reshoring
requirements
3c
Cast-in-place concrete
requirements
 Vertical
slip forms
• Rods and pipes
• Form design
• Scaffold work
3d
Cast-in-place concrete
requirements
 Vertical
slip forms
• Jacks, vertical support, and rated
capacity
• Holding devices
• Form structure
• Rate of lift
3e
Cast-in-place concrete
requirements
 Reinforcing
steel
• Rebar support
• Rolled wire mesh
3f
Cast-in-place concrete
requirements
 Formwork
removal
• Conditions for removal
• Reshoring removal
3g
Precast concrete
 Adequate
 Lifting
support
inserts
 Employee
safety
4a
Lift-slab Operations
 Professional
design and plan
• Detailed instructions and sketches
• Lateral stability
5a
Lift-slab Operations
 Jacking
equipment
• Load and overload
• Equipment includes
 Protection
of employees
5b
Masonry construction
requirements
 Limited
•
•
•
•
access zone requirements
Dimensions
Placement
Restricted area
Requirements for
removing
6a