Comite River Diversion Canal Project Regional Flood Awareness Workshop December 3, 2009
Download ReportTranscript Comite River Diversion Canal Project Regional Flood Awareness Workshop December 3, 2009
Comite River Diversion Canal Project Regional Flood Awareness Workshop December 3, 2009 Amite River Basin COMITE RIVER DIVERSION CANAL PROJECT U.S. ARMYCORPS OF ENGINEERS LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT AMITE RIVER DRAINAGE AND WATER CONSERVATION DISTRICT CITY/PARISH OF EAST BATON ROUGE Expected Water Diversion as a Result of the Project Flood Frequency (YR) ____________ 5 10 25 50 100 *Inflow Diversion (%) *Outflow ___________ _________________ ____________ 16,200 22,100 28,400 37,500 45,800 8,150 (50%) 11,500 (52%) 14,500 (51%) 19,200 (51%) 20,700 (45%) 8,050 10,600 13,900 18,300 25,100 • Estimated flood stage reductions during last six major floods if project would have been in place. Date Estimated Flood Stage Reduction Joor Road Comite River @ Comite Amite River @ Denham Springs April 1977 4.3 ft. 1.5 ft. April 1979 4.5 ft. 1.5 ft. April 1983 4.0 ft. 1.4 ft. January 1990 4.5 ft. 1.5 ft. January 1993 4.3 ft. 1.5 ft. January 1994 4.5 ft. 1.5 ft. Estimated Cost (2008/09) Federal $135,500,000 Non- Federal $ 53,500,000 State (LADOTD) $43,500,000 ARBC $10,000.000 Total $189,000,000 ESTIMATED MAINTENANCE COST (after project completion) Non-Federal Responsibility Dredge the Diversion Channel (25-year frequency) Dredge the Comite River (10-year frequency) $3,700,000 2,100,000 Clear & snag three bayous (7-year frequency) 244,000 Repair side slopes of diversion channel (annual) 63,000 Inspection, debris removal, Brooks Lake (annual) 70,000 Maintain low flow pumps (annual) 21,000 Monitoring program (annual) 75,000 Maintain mitigation areas (annual) 48,000 TOTAL ANNUALIZED COSTS $493,000 • Estimated Cost (2009) – Federal – Non-Federal • State (LADOTD) • ARBC • Total $43,000,000 $10,000,000 $135,000,000 $ 53,000,000 $188,000,000