BRACED CUTS
Braced Cuts by M Jamin
1
BRACED CUTS
Cross-lot supported excavation NYU Medical Center, New York City
Braced Cuts by M Jamin
2
Braced Cuts by M Jamin
3
BRACED CUTS
Wale
Strut
Wedge
Lagging
Strut
Soldier beam
A
A
Wale
Soldier beam
Lagging
Potongan A-A
Braced Cuts by M Jamin
4
BRACED CUTS
Wale
Strut
Sheet pile
Strut
A
A
Sheet pile
Wale
Potongan A-A
Braced Cuts by M Jamin
5
BRACED CUTS
Braced Cuts by M Jamin
6
BRACED CUTS
Strut
Keruntuhan
dinding
Keruntuhan
dinding
Dinding penahan tanah
Braced cut
Jenis keruntuhan pada umumnya
Braced Cuts by M Jamin
7
Total gaya lateral, P dianalisis menggunakan teorinya Terzaghi (1943). Dengan
asumsi permukaan bidang keruntuhan berupa lengkung logaritmik spiral, berupa
Persamaan berikut :
r = roetan ,
dimana : = sudut
Distrubusi tekanan
H
nilai n mulai dari
0,33 s/d 0,5 atau 0,6
nH
Bidang keruntuhan
Braced Cuts by M Jamin
8
Cuts in Sand
(Peck, 1969)
Cuts in Soft and Medium Clay
(Peck, 1969)
Dapat digunakan pada kondisi
H
4
cu
0.25H
H
4
cu
0.25H
pa
pa
H
Cuts in Stiff Clay
(Peck, 1969)
Dapat digunakan pada kondisi
0.5H
pa
0.75H
0.25H
pa 0.65HK a
berat satuan tanah
H Tinggi galian
K a koefisien tekanan tanah lateral
tan 45 / 2
2
Peck ' s 1969
4c
pa H 1
H
atau
pa 0.2H sampai 0.4H
atau rata rata pa 0.3H
Peck ' s 1969
pa 0.3H
Peck ' s 1969
Braced Cuts by M Jamin
9
Limitations for the Pressure Envelopes
1.
Dinding relative fleksibel
2.
Kedalaman galian > 6 m (20ft)
3.
Muka air tanah berada dibawah dasar galian
4.
Lapisan pasir tekanan air pori diasumsikan sebesar 0
5.
Untuk lapisan lempung diasumsikan undrained
Braced Cuts by M Jamin
10
Daya angkat pada dasar galian lempung
(Terzaghi, 1943)
Q HB1 cH
Qu cNc B1
dimana :
B1 0.7B
c kohesi
B
B1
H tinggi galian
B1
H
Nc 5.7 (untuk 0)
Qu
Q
5.7cB1
HB1 cH
FS
450
450
1 5.7c
c
H
0.7B
Jika kedalaman D 0.7B, maka
0.7B
D
1 5.7c
FS
c
H
D
A Hard layer of rock or rocklike material
Bjerrum & Eide, 1956 mengusulkn untuk Faktor
Aman (FS) pada galian tanah lempung, adalah :
FS
Braced Cuts by M Jamin
cNc
H
11
Cuting pada tanah berlapis
Peck (1943)
Hs
s
s
Sand
H
Hc
Clay
c
1
s K s H s2 tan s H c n' qu
2H
1
a s H c H c
H
a berat satuan tanah rerata
c av
c berat satuan tanah lempung jenuh
K s Koefisien tekanan tanah lateral 1
qu unconfined compression strength lempung
n' koefisien progresif keruntuhan 0,5 - 1,0 0,75
Braced Cuts by M Jamin
12
Struts pada tanah pasir
A
B
A
B
d1
d2
d1
d3
d4
d d
C pa 3 4
2
2
d
D pa 4 d 5
2
PA As
d5
P C C s
s
d2
C
d4
C
d
A pa d1 2
2
d
d
B pa 2 3
2
2
D
d3
d5
PB Bs
D
PD Ds
M max dititik A 18 PA s
Potongan
Tampak atas
M max dititik B 18 PB s
M max dititik C 18 PC s
M max dititik D 18 PD s
S
Braced Cuts by M Jamin
M max
all
13
Struts pada tanah lempung lunak dan medium
(soft and medium clay)
d1
A
A
s
d2
d1
d2
B1
B
B2
d3
d3
C
C
d4
Potongan
d4
Tampak atas
H
B1 12 pa 14 H pa d 2 A
d
B2 pa 3
2
d
C pa 3 d 4
2
PA As
PB Bs
P C C s
S
M max
all
4
c
Dihitung berdasarkan M B 0
Ad 2 12 pa 14 H d 2 13 14 H pa d 2 12 d 2 0
A
1
2
pa 14 H d 2 13 14 H pa d 2 12 d 2
d2
Braced Cuts by M Jamin
14
Struts pada tanah lempung kaku
(Stiff clay)
d1
A
A
s
d2
d1
d2
B1
B
d3
d3
d4
d4
C
Potongan
Tampak atas
Braced Cuts by M Jamin
15
H
B
L1
, c1
L2
L3
Lapisan kedap air
Braced Cuts by M Jamin
16
Faktor kapasitas daya dukung, Nc
(Terzaghi, 1943)
Faktor kapasitas daya dukung, Nc bervariasi sesuai dengan rasio H/B dan L/B (dimana L =
panjang galian). Untuk galian yang panjang (B/L = 0), Nc = 5.14 dan H/B = 0, nilai Nc akan
meningkat menjadi 7.6 pada H/B ≥ 4. Untuk galian dengan bentuk bujur sangkar (L/B=1)
Nc = 6.3 pada H/B = 0
B
Nc = 9 untuk H/B ≥ 4 N
N
0.84 0.16
c ( rec tan gle )
c ( square )
L
B
cNc ( square ) 0.84 0.16
L
FS
H
Jika lempung keras ada dilapisan bawah galian, seperti pada Gambar berikut, maka :
FS
H
c1 N c' ( strip ) Fd Fs
H
,
untuk c 2 c1
N c' ( strip ) dan Fd lihat grafik
B
Fs 1 0.2
B
L
, c1
h1
, c2
Braced Cuts by M Jamin
17
Braced Cuts by M Jamin
18