Connect. Communicate. Collaborate GÉANT2 update - II Otto Kreiter, DANTE E2E monitoring Connect.
Download ReportTranscript Connect. Communicate. Collaborate GÉANT2 update - II Otto Kreiter, DANTE E2E monitoring Connect.
Connect. Communicate. Collaborate GÉANT2 update - II Otto Kreiter, DANTE E2E monitoring Connect. Communicate. Collaborate • UP/DOWN status monitored across domains for p2p circuits • 15 domains have deployed the MPs (measurement points) • Visualization tool developed by GN2-JRA4 – actively used by the E2ECU and NRENs • Encouraging the different domains to include subwavelengths info in their MP/MA (ie. GE connections) Sandbox: http://cnmdev.lrz-muenchen.de/e2e/lhc/ E2ECU Connect. Communicate. Collaborate E2ECU DOES :– Monitor End-to-End circuit – Send alerts about outages & maintenance – Manage information flow between domains E2ECU receives fault alerts from :– End-to-End Monitoring System – NOCs by email These entities can send tickets to E2ECU :– Campus Network Administrators – NREN NOCs – GEANT2 NOC Tickets sent out to parties involved in a particular project, except e.g. research scientists themselves. perfSONAR - MDM Connect. Communicate. Collaborate • Service desk to support the Multi Domain Monitoring service – Support perfSONAR products developed by GN2-JRA-1 – IP performance measurements • Pilot phase of the service being set up by JRA1 and SA3 GN2 activities for 5 NRENs • DANTE Operations collaborating in setting up the service desk • Looking for projects interested in the future to have the MDM service implemented Monitoring summary Connect. Communicate. Collaborate • E2ECU fully serving the p2p community of LHC & IGTMD – Deisa on his way • Ready to uptake other projects – EXPRES • Involved domains should install the required MP and MAs or • Should list the GE p2p links as well (currently mostly wavelengths are shown) • EXPRES may be interested in the MDM service Procurement update Connect. Communicate. Collaborate • Connectivity procurement on-going – Tenders “will be” for dark fibre if feasible, else 10Gb/s or 2.5Gbps wavelengths. – Key issues are connectivity to existing network and resiliency • Router hardware procurement – In the final phase – tender answers back 21st September – Looking for hardware to replace old equipment! – Key issue: a packet network for the future! Connect. Communicate. Collaborate