Connect. Communicate. Collaborate
GÉANT2 update - II
Otto Kreiter, DANTE
E2E monitoring
Connect. Communicate. Collaborate
• UP/DOWN status monitored across domains for p2p
circuits
• 15 domains have deployed the MPs (measurement points)
• Visualization tool developed by GN2-JRA4
– actively used by the E2ECU and NRENs
• Encouraging the different domains to include subwavelengths info in their MP/MA (ie. GE connections)
Sandbox: http://cnmdev.lrz-muenchen.de/e2e/lhc/
E2ECU
Connect. Communicate. Collaborate
E2ECU DOES :– Monitor End-to-End circuit
– Send alerts about outages
& maintenance
– Manage information flow
between domains
E2ECU receives fault alerts from :– End-to-End Monitoring System
– NOCs by email
These entities can send tickets to E2ECU :– Campus Network Administrators
– NREN NOCs
– GEANT2 NOC
Tickets sent out to parties involved in a particular project, except e.g. research
scientists themselves.
perfSONAR - MDM
Connect. Communicate. Collaborate
• Service desk to support the Multi Domain Monitoring
service
– Support perfSONAR products developed by GN2-JRA-1
– IP performance measurements
• Pilot phase of the service being set up by JRA1 and SA3
GN2 activities for 5 NRENs
• DANTE Operations collaborating in setting up the service
desk
• Looking for projects interested in the future to have the
MDM service implemented
Monitoring summary
Connect. Communicate. Collaborate
• E2ECU fully serving the p2p community of LHC & IGTMD
– Deisa on his way
• Ready to uptake other projects – EXPRES
• Involved domains should install the required MP and MAs
or
• Should list the GE p2p links as well (currently mostly
wavelengths are shown)
• EXPRES may be interested in the MDM service
Procurement update
Connect. Communicate. Collaborate
• Connectivity procurement on-going
– Tenders “will be” for dark fibre if feasible, else 10Gb/s or
2.5Gbps wavelengths.
– Key issues are connectivity to existing network and
resiliency
• Router hardware procurement
– In the final phase – tender answers back 21st
September
– Looking for hardware to replace old equipment!
– Key issue: a packet network for the future!
Connect. Communicate. Collaborate