MP Scenario • • • • • Total assessed power:- 2775 Mw Out of this 21% power potential has already been developed. Further 44% is under development. And 35%

Download Report

Transcript MP Scenario • • • • • Total assessed power:- 2775 Mw Out of this 21% power potential has already been developed. Further 44% is under development. And 35%

MP Scenario
•
•
•
•
•
Total assessed power:- 2775 Mw
Out of this 21% power potential has already
been developed.
Further 44% is under development.
And 35% hydro power potential is yet to be
harnessed.
Besides the above almost 100% power
potential from SHP is yet to be harnessed.
•
•
•
•
•
•
•
•
Bargi Dam
Bansagar Dam
Gandhi Sagar
Rajghat Dam
Tawa Dam
Mahdikheda Dam
Omkaresher Project
Indra Sagar Project
•
•
•
One of the first completed dam out of the
chain of 30 major complete dam constructed
on narmada river in mp.
Its generation capacity is of 105Mw
Total Irrigation potential: 4370 sq.km
Bargi Dam
Impounds
Narmada River
Locale
Bargi, Jabalpur
District,Madhya Pradesh
Length
5357 m
Height
69.80 m
Construction began
1975
Opening date
1988
Maintained by
Water Resources
Department, Madhya
Pradesh
•
•
•
•
•
Multi purpose river valley project
Project was an agreement between the State
Govt. of MP, UP, Bihar.
According to which states had to share the
expenditure in the ratio of 2:1:1.
Power Generation capacity is 425Mw in MP.
Irrigation facility over an area of 2490 sq.km
in MP.
Bansagar Dam
Impounds
Son River
Locale
Deolond, Shahdol
District,Madhya Pradesh
Length
1020 m
Height
67 m
Construction began
14 May 1978
Opening date
25 September 2006
Maintained by
Water Resources Department,
Madhya Pradesh
•
•
•
•
First of the four dam built on the chambal
river.
Storage capacity 6920 cubic Mm.
Catchment area 22584 sq.km.
Power generation capacity 115Mw (5*23).
Gandhi Sagar Dam
Impounds
Chambal River
Locale
Gandhi Nagar, Mandsaur
District,Madhya Pradesh
Length
513 m
Height
62.20 m
Construction began
1954
Opening date
1970
Maintained by
Water Resources
Department,Madhya Pradesh
•
•
•
Inter state dam project of the Govt. of MP and
UP.
Power Generation capacity is 45Mw (3*15).
Irrigation facility over an area of 1210 sq.km.
in MP.
Rajghat Dam
Impounds
Betwa River
Locale
Ashok Nagar District,Madhya
Pradesh& Lalitpur, Uttar
Pradesh
Length
11200 m
Height
43.8 m
Construction began
1975
Opening date
2006
Maintained by
Water Resources
Department, Madhya Pradesh
•
•
•
Large reservior on the tawa river in central
India.
Power Generation capacity is 13.5 Mw
Catchment area 5982.9 sq. km.
Tawa Dam
Impounds
Tawa River
Locale
Hoshangabad District,Madhya
Pradesh
Length
1,815 m
Height
57.91 m
Construction began
1956
Opening date
1998
Maintained by
Water Resources
Department, Madhya Pradesh
•
•
•
Multi-Purpose Dam.
Power generation capacity 60Mw(3*20).
Catchment area 5540 sq.km.
Madikheda Dam
Impounds
Sindh River
Locale
Madikheda, Shivpuri
District,Madhya Pradesh
Length
1070 m
Height
62 m
Construction began
1978
Opening date
2008
Maintained by
Water Resources
Department,Madhya Pradesh
Omkareshwar Power Station is a multipurpose project,
which offers opportunity of power generation & irrigation
on both the banks of river Narmada in districts Khandwa,
Khargone & Dhar of Madhya Pradesh. The project is
situated 80 km from Indore and 40 km down stream of
Indira Sagar Project. The Cabinet Committee on Economic
Affairs (CCEA) sanctioned the Project with an estimated
cost of Rs.2224.73 Crores (Nov. 2002 Price Level) and
total gestation period of 5 years. Omkareswar project was
cleared by CCEA on 29.03.2003.
The foundation stone of this project was laid by the then hon’ble
Prime Minister of India Shri Atal Bihari Vajpayee on 30.08.2003
.Total installed capacity of the Omkareswar Project is 520
Megawatt (8x65). The project will generate 1167 Million Units
energy, annually. Total catchments area at the proposed dame site
is 64880 Sq. km, out of which 3238 Sq. is Downstream of Indira
Sagar Power Station. The Project consists of 949 m long Concrete
Gravity Dam with maximum height of 53 m from the deepest bed
level across the river Narmada. A Central Ogee-type spillway 570
m long with crest level EL 179.6 m has been provided to pass the
Probable Maximum Flood of 882315 cumecs. . The surface Power
House (202m x 23m x 53m) of the Project is within the body of
Dam on the right bank of Narmada consisting of 8 Units of 65 MW
capacity each with conventional Francis Type Turbines. Water is
carried to the Turbines through 8 no. Penstocks of 7.66 m
diameter each. After generation water is discharged back in the
river through 145 m long Tail Race Channel
Indira Sagar Power Station is situated at 10 Km from the
village Punasa in Khandwa District of Madhya Pradesh. The
foundation stone of this project was laid by the then Hon’ble
Prime Minister of India Late Smt. Indira Gandhi on
23.10.1984. It is a multipurpose project on the river Narmada
with installed capacity of 1000 Megawatt (8X125). It will
generate 2698 MUs energy, annually. The project will irrigate
2.70 lakh ha land annually. As per CCEA sanction the project
cost is Rs. 4355.57 Crores (Sept. 2000 Price Level). The
project consists of Concrete gravity dam of length 653
meter at top with maximum height (above deepest
foundation level) of 92 meter.
The surface Power House is situated on the right bank of
the river, with Machine hall (202 meter long, 23 meter wide,
53 meter high), service bay (42 meter long, 23 meter wide,
24 meter high) and transformer yard (202 meter long, 20
meter wide) to house 8 Nos. Francis type turbines of 125 MW
each. The water conductor system consists of one Head Race
Channel of length 530 meter, width 75 meter and depth 50
meter with water carrying capacity of 2200 cumecs. Water
enter into turbine fron intake structure by 8 Nos. Penstock of
8 meter diameter and 157 meter length each. Water flow
capacity of each Penstock is 275 cumecs. After power
generation water is discharged back into river Narmada
through 850 m long Tail Race Channel

Large Area

High Construction Cost

Long Erection Time

Submerges Huge Areas & Creates Social and Other
Problems






No submergence
No need of Environmental clearance
As generation capacity less than 25 Mw so no need
of clearance from CEA (Central Electricity Authority)
Small period of commissioning the project
Less capital outlay
Less running & maintenance cost
Basin
No. of Sites
Available
Installed
Capacity in KW
Dependable
Energy (GWh)
Son
3
26500
108.00
Narmada
5
49000
164.37
Godawari
6
54040
208.61
Tapi
9
37000
135.00
THE END
Presented By:Gaurav Modi (081113216)
Tarun Anandani (081113201)
Rohit Kachhawaha (081113210)