Fostering New Off-Grid Solutions NJ Clean Air Council April 1, 2009 Founded in New Brunswick, NJ in 1886 250 operating companies
Download ReportTranscript Fostering New Off-Grid Solutions NJ Clean Air Council April 1, 2009 Founded in New Brunswick, NJ in 1886 250 operating companies
Fostering New Off-Grid Solutions NJ Clean Air Council April 1, 2009 Founded in New Brunswick, NJ in 1886 250 operating companies Approximately 120,000 employees 14,900 employees and retirees in NJ Operations in 57 countries 3 Divisions: Consumer, Pharmaceuticals, Medical Devices Climate Friendly Energy Policy 1999/2003 Achieve a 7% absolute reduction in Green House Gas (CO2) emissions by 2010, compared to a base year of 1990 CO2 Reduction Pathway: A Balanced Approach Energy Efficiency On-site Cogeneration On-Site Renewables: Solar, Wind, LFG, Biomass, Geothermal Green Power Purchases Carbon Offsets & Sequestration CO2 Capital Funding Process August, 2004 $40 million per year in capital relief for projects worldwide Projects provide good financial returns: 10-15% Internal Rate of Return Projects provide meaningful CO2 reduction CO2 Reduction Projects since 2005 • 63 projects approved for funding Chiller Upgrade 16 HVAC 5 • $128.3 million US Boiler Upgrade 4 • 120,000 metric tons CO2/yr • Average IRR: 17.3% • 45 Projects Complete Energy Efficiency 17 Wind 1 Geothermal / Biomass 3 •6 Solar P.V. / Thermal 9 Cogen 8 Efficiency Energy Best Practices Rev. 2007 Stage 1: Management Practices & Continuous Improvement Stage 2: Energy Purchasing & Monitoring Stage 3: Air Handling (HVAC) Stage 4: Motors & Pumps Stage 5: Boiler Systems Stage 6: Chiller Systems Stage 7: Electrical & On-site Generation Stage 8: Lighting Stage 9: Compressed Air Stage 10: Manufacturing & Other Load Reductions Geothermal Projects DePuy - St. Priest, France Geothermal Heating / Cooling System Ground water heat pump Provides all heating & most cooling for 7,000 s.m. HQ building Vistakon – Limerick, Ireland Geothermal Cooling System Utilizes underground water flow Biomass Projects 350 kW boiler provides heating for distribution center ALZA, Mountain View, CA Landfill Gas Generation Centocor, Cork, Ireland Biomass Boiler Cilag, Schaffhausen, Switzerland Wood Chip Boiler 2.1 MW boiler provides process & HVAC steam Installation of 3 MW of electrical power Waste heat recovery Solar Thermal Projects McNeil Consumer Ft. Washington, PA 124 kW Thermal System for Boiler Pre-heat J&J China, Shanghai Domestic Hot Water Cogeneration Projects Ortho Clinical Diagnostics – Raritan, NJ Gas Turbine, 2007 1.6 MW – Kawasaki Gas Fired Turbine Heat recovery, steam generation Ortho-McNeil Pharmaceuticals Raritan, NJ Reciprocating Engine, 2009 3.5 MW – Jenbacher Engine Heat recovery, hot water Company: Cordis Location: Warren, New Jersey Project: 72 kW Solar Photovoltaic Roof Mounted System Completed: May 2002 Company: Janssen USA Location: Titusville, New Jersey Project: 522 kW Solar Photovoltaic Roof Mounted System Completed: February 2003 •13 Company: J&J Consumer Products Location: Skillman, New Jersey Project: 505 kW Solar Photovoltaic Tracking System Completed: October 2005 Company: Ethicon Inc. Location: Somerville, New Jersey Project: 250 kW Solar Photovoltaic Roof Mounted System Completed: February 2006 Company: J&J Corporate Location: New Brunswick, New Jersey Project: 234 kW Solar Photovoltaic Tracking System Completed: March 2006 Company: GPSG Location: Raritan, New Jersey Project: 515 kW Solar Photovoltaic Tracking System Completed: December 2007 Hyatt Hotel – New Brunswick – March 2009 Currently have three new solar projects in development at NJ locations. Company: GPSG Location: Vacaville, California Project: 1,194 kW Solar Photovoltaic Tracking System Completed: September 2007 •19 Commitment to Sustainable Design All new construction to be LEED certified Certification Level Incremental Cost Energy Reduction vs. Existing Buildings Certified 0-0.5% 26% Silver 0.5%-1.5% 32% Gold 1.5%-3.5% 44% Platinum 6% 44% J&J PRD Lab Goes for LEED GOLD RC-1 Laboratory, Springhouse Campus, PA Designed to operate using 45 % less energy than ASHRAE 90.1- 2004 NJ Track Record of Leadership NJ BPU Clean Energy Program Renewable Portfolio Standard NJ Global Warming Response Act RGGI NJ Energy Master Plan LEV Program NEEP Energy Efficiency Strategy for NJ Draft Global Warming Response Act Recommendation Report Moving Forward… Execute on plans, with emphasis in the short term on efficiency, equipment standards (CFL’s, appliances, etc) and building codes. Continue to support distributed generation by industry: cogeneration, biomass, solar. Industry’s role – Run businesses efficiently and implement distributed generation projects where it makes sense. Utilities’ role – Deliver low-carbon power. Execute CHP, solar, wind, biomass on a scale that is cost effective. Utilities must be rewarded for selling less. The net impact on GHG emissions should be a critical consideration for all State decisions. Moving forward… Support national climate change legislation to set targets and timetables based on science (IPCC) and establish an economy-wide cap & trade system (allow RGGI to become part of a national system). See USCAP Blueprint for Legislative Action at www.uscap.org A national cap & trade system will establish a market-based price for carbon that will drive innovation and investment to meet environmental goals at the lowest cost. THANK YOU ! Dennis Canavan [email protected] 732-524-6269