FABRIC Next 18 month forward look Huib van Langevelde, JIVE EXPReS is made possible through the support of the European Commission (DG-INFSO), Sixth Framework Programme,
Download ReportTranscript FABRIC Next 18 month forward look Huib van Langevelde, JIVE EXPReS is made possible through the support of the European Commission (DG-INFSO), Sixth Framework Programme,
FABRIC Next 18 month forward look Huib van Langevelde, JIVE EXPReS is made possible through the support of the European Commission (DG-INFSO), Sixth Framework Programme, Contract #026642 Personnel issues • Various delays in making new hires • Most partners follow AC model • Notable delays: • Protocol work at JBO • Solution identified, not too many dependencies yet • Astronomical side of correlator work at JIVE • Changed order of work-packages, seems OK • Nature of engineering work at OSO unclear • Improved with iBOB decision • “Full time” FABRIC coordinator • Can be addressed when JIVE director position clear • Responsible for overall design document 11/6/2015 midterm review Slide #: 2 Technical issues • Design decision on data acquisition platform • Now made, not that much delay, design docs delivered • Delivery of iBOB’s, Xilinx chips, libraries • This introduces a 4 – 5 month gap in plan • Fortunately no idle personnel yet • But still need to climb learning curve • Work description of OSO and LOFAR partners • Design of distributed correlator • Required a good deal of interactions • Has delayed JIVE design document somewhat • Offset by good progress on correlator core 11/6/2015 midterm review Slide #: 3 Work plan • Can remain largely the same • Worked out the revised timing • Some milestones shift, one is split in two parts • Spending will ramp up a bit later • Almost all hires complete • Even the ones on matching local projects • Post-doc for JBO protocol work identified • Some testing may fall outside 3 year window • Need to monitor over next year • Overall design document by FABRIC PI • Will be addressed by team effort 11/6/2015 midterm review Slide #: 4 11/6/2015 midterm review Slide #: 5 11/6/2015 midterm review Slide #: 6 number name original DJ1.1 Data acquisition requirements document 2 DJ1.2 Protocols strategic document 2 DJ1.3 Visualization software 4 DJ1.4 Correlator design specification DJ1.5 actual revised type responsible 3 report MRO 2 report JBO 21 software JIVE 5 14 report JIVE Overall design document 6 17 report JIVE DJ1.6 eVLBI-Grid design document 6 9 report PNSC DJ1.7 eVLBI fringes PC-EVN 7 7 demo OSO DJ1.8 LOFAR connection strategic document 7 11 report ASTRON DJ1.9 Data acquisition design document 8 11 report MRO DJ1.10 eVLBI-Grid interface document 10 10 report PNSC DJ1.11 Protocols performance report 13 13 report JBO DJ1.12 Software correlator core 14 15 software JIVE DJ1.13 Software data product 15 17 software JIVE DJ1.14 Data acquisition interface document 18 22 report MPI DJ1.15 LOFAR station interface report 18 21 report ASTRON DJ1.16 Software for workflow management 18 18 software PNSC