FABRIC
first year progress report
Huib van Langevelde, JIVE
EXPReS is made possible through the support of
the European Commission (DG-INFSO), Sixth
Framework Programme, Contract #026642
Future Arrays of Broadband
Radio-telescopes on Internet Computing
• Broadband
WP 1
• Data acquisition to work with
10Gbps Internet
• Requires new filtering and
sampling hardware
• Optimize protocol
• Calibration issues and control
software interface to telescope
• Interfaces from public domain
transport to “private”
• LOFAR
• e-MERLIN
• Prototype and test
• Onsala telescope on e-MERLIN
11/6/2015
EXPReS midterm review
• Internet computing
WP 2
• Use Grid for calculating
correlation function
• Based on virtual lab projects
• Workflow management
• Load balancing
• Deployable software correlator
• Based on previous Huygens
machine
• Suitable for Grid nodes and
parallel computing
• Data quality control, display
and merging
• 5 station demonstrator
• With new science capabilities
Slide #: 2
Data acquisition
WP 1.1.1
MRO
• Requirements formulated
•
•
•
•
•
Quite complex decision to be made
Recording: Mk5 and PCEVN systems available
Sampling: dBBC and DBE under development
Compatibility with correlators
And e-MERLIN in/out
• Decision reached
• iBOB:
• Internet BreakOut Boards
• University of Berkeley
• FPGA and 2 x 10 Gbps
• ADC converter port
• R+D into radically different solution
11/6/2015
EXPReS midterm review
Slide #: 3
e-MERLIN interface
• Connect 4Gbps streams (Onsala)
WP 1.2.2
UniMan
• To feed into e-MERLIN correlator
• Compatible to MERLIN channelization
• Same architecture as MERLIN out (SA1)
• And as data-acquisition
• Design started
• Hardware ordered
• Personnel found
• Joint with SA1
11/6/2015
EXPReS midterm review
Slide #: 4
Protocol research
• Various testbeds
WP 1.2.1
UniMan
• with range of controls in e.g. dropout
• Protocols adressed
•
•
•
•
TCP certainly not optimal
UDP more promising
VSI-E needs more tests
DCCP not robust yet
• Currently contributed effort by UniMan
• Engineer available for FABRIC work later this year
• Will bring more specific focus
• Strategic discussion document delivered
11/6/2015
EXPReS midterm review
Slide #: 5
Testing Onsala/7 month demo
WP 1.2.3
OSO
• Onsala will do 4Gbps demo
• Joining the e-MERLIN array
• Bandwidth upgrade under negotiation
• Did PC-EVN test
• Transfer at high rate
• Using Tsunami
• Direct transport
• To JIVE
• Or Metsähovi
• Correlation at JIVE
• Very useful exercise
11/6/2015
EXPReS midterm review
Slide #: 6
LOFAR connectivity
• Similar to e-MERLIN
• E-LOFAR stations
on public network?
• Interface issues
• And timing
• Also for clock distribution
• Discussions started
11/6/2015
EXPReS midterm review
GbE
switch
BG/L
Rack
BG/L
Rack
Cluster of servers
10 TB RAID per node
Infiniband interconnect
GbE
switch
BG/L
Rack
GbE switch
GbE
switch
BG/L
Rack
GbE
switch
Cluster of servers
4BG RAM/node
Infiniband interconnect
10 GbE
switch
10 GbE
switch
WP 1.2.4
ASTRON
10 GbE
switch
10 GbE
switch
10 GbE
switch
• strategic doc delivered
Cluster of servers
general purpose nodes
Infiniband interconnect
Slide #: 7
Cluster of servers
general purpose nodes
Infiniband interconnect
Distributed correlation
• Correlation currently in
dedicated silicon
•
•
•
•
Special purpose computer
With 2 bit operations
At 100 T-ops
Future needs at 20 P-ops
• Can be done on custom
computers with 1op=1flop
• Interesting science demo would
take a few cluster computers
• Software correlation can
outperform 2 bit operation
11/6/2015
EXPReS midterm review
Slide #: 8
eVLBI-Grid collaboration
WP 2.1.1
PSNC
• Connect telescopes and
correlator nodes
• Need to be deployed on Grid
• Based on virtual laboratory
• Required a lot of design
• PSNC group new to VLBI
• JIVE group new to Grid
• 2.9 documents produced
• Challenge: resource allocation
• Issues with data from Mk5 system
• Reached next stage
• Workflow manager
• Integrating correlator core
11/6/2015
midterm review
Slide #: 9
WP 2.1.2
PSNC
11/6/2015
EXPReS midterm review
Slide #: 10
Software correlator
• Deployable software correlator
WP 2.2.1
JIVE
• Cluster computer enabled
• Grid enabled
• Starts with special purpose
algorithm for Huygens mission
• Extreme high spectral resolution
• Keep for future applications
• Can have better signal to noise
performance than 2-bit
• Interesting astronomy applications
• Code transferred to standard
environment
• Runs on cluster computers
• But not yet optimized
11/6/2015
EXPReS midterm review
Slide #: 11
Correlator core
11/6/2015
EXPReS midterm review
WP 2.2.2
JIVE
Slide #: 12
Management
• Distributed project with >30 participants
• In 7 institutes and >4 disciplines
• Communication
• Meetings:
kick-off meeting in Dwingeloo 22 Mar 2006
business meeting Poznan 27 Sep 2006
few teleconferences
• Splinter meetings & visits: correlator, protocols, iBOB
• Wiki for sharing documents
• E-mail exploder with some external parties
• Original work package structure quite good
11/6/2015
EXPReS midterm review
Slide #: 13
Challenges
• Design hurdle for data acquisition
• iBOB rather drastic new development route
• Large investment in existing technologies
• Decisions took some time, purchases even more
• Personnel acquisition dependent as well
• Bridge the gap between eVLBI and Grid
• Took several iterations and meetings
• Teams with variety of expertise
• And strong opinions
11/6/2015
EXPReS midterm review
Slide #: 14
Personnel issues
• Kick-off in March 2006
•
•
•
•
Direct start at Poznan and partially at JIVE
Other post-doc level people JIVE took 6 & 9 months
At JBO digital engineer is shared with SA1
Protocol person only available in 2007
• Lot of the work done by ‘matching’ effort
• OK for the design phase
• Project manager is now also coordinator
• Definitely delayed the integrated design document
11/6/2015
EXPReS midterm review
Slide #: 15
Milestones
number
name
DJ1.1
Data acquisition requirements
document
2
3 report
MRO
DJ1.2
Protocols strategic document
2
2 report
JBO
DJ1.3
Visualization software
4
software
JIVE
DJ1.4
Correlator design specification
5
report
JIVE
DJ1.5
Overall design document
6
report
JIVE
DJ1.6
eVLBI-Grid design document
6
9 report
PNSC
DJ1.7
eVLBI fringes PC-EVN
7
7 demo
OSO
DJ1.8
LOFAR connection strategic
document
7
11 report
ASTRON
DJ1.9
Data acquisition design document
8
11 report
MRO
DJ1.10
eVLBI-Grid interface document
10
10 report
PNSC
11/6/2015
original
EXPReS midterm review
actual
type
Slide #: 16
responsible