Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010
Download ReportTranscript Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010 201-MHz Cavity Programs • Prototype cavity at the MTA – Surface damage on RF coupler and coupler port region – Damage on the ceramic RF window – Data analysis of the existing RF test results – Window inspection tomorrow – RF test plans • Development of test plan at this WS • Adding diagnostic at ceramic RF window • RF frequency variation as a function of average RF power (Be window heating) MICE Video Meeting, D. Li, Lawrence Berkeley National Lab, November 18, 2010 2 201-MHz Cavity Programs SC CC magnet available by end of 2011 Ceramic RF window, copper sputtered on the window Sparking on loop coupler SC CC magnet 201-MHz Cavity Lab G Magnet MICE Video Meeting, D. Li, Lawrence Berkeley National Lab, November 18, 2010 3 Status of MuCool CC Magnet • • • • The Coil has 96 layers and 166 turns SC coil winding completed 1 week ago Al banding arrived China last week Modification of the ICST test system is under way (making progress, but with delays) • Cryostat design by SINAP, the final design review is scheduled: Dec. 9 & 10 at SINAP, Shanghai • Fabrication of cryostat components and cover plate welding soon • Quench protection • CC assembly procedures • Cold mass test at HIT MICE Video Meeting, D. Li, Lawrence Berkeley National Lab, November 18, 2010 4 201-MHz Cavity Programs • MICE cavities – – – – – Fabrication of ten 201-MHz cavities complete Received eight Be windows at LBNL Ten ceramic RF windows ordered RF coupler design update is under way RF tuner design and prototype • Fabrication of six prototype tuners starts soon – Cavity post-processing at LBNL • Surface cleaning, EP and cavity assembly – Cavity tuning • Low power RF measurements of all MICE cavities MICE Video Meeting, D. Li, Lawrence Berkeley National Lab, November 18, 2010 5 MICE Cavity Fabrication MICE Video Meeting, D. Li, Lawrence Berkeley National Lab, November 18, 2010 6 201-MHz Cavity Programs • Design progress of a single cavity vacuum vessel for RF tests at MTA or CERN MICE Video Meeting, D. Li, Lawrence Berkeley National Lab, November 18, 2010 7 201-MHz Cavity Programs • Single cavity vacuum vessel superimposed between the magnet coils 82cm 79cm • Single RF cavity vacuum vessel will potentially be used in a 3 T large bore magnet to perform RF breakdown test measurements in a magnetic field at CERN in support of the MTA at FNAL or in support of MICE MICE Video Meeting, D. Li, Lawrence Berkeley National Lab, November 18, 2010 8 201-MHz Cavity Programs • The single cavity vacuum vessel allows us to explore many mechanical design and assembly issues before we have a MICE RFCC module – – – – – – – – Tuners Couplers Support Cooling piping Pumping Assembly Fixturing … MICE Video Meeting, D. Li, Lawrence Berkeley National Lab, November 18, 2010 9