Efforts by the KEK-ILC Team toward Realization of ILC Fumihiko Takasaki March 25, 2006

Download Report

Transcript Efforts by the KEK-ILC Team toward Realization of ILC Fumihiko Takasaki March 25, 2006

Efforts by the KEK-ILC Team
toward Realization of ILC
Fumihiko Takasaki
March 25, 2006
KEK’s ILC Organization Chart
MEXT
Director General
Director of
Accelerator Lab
Head of Div 4
ILC Team :
ILC Office
Head : F. T.
➔
Head : K. Yokoya
Deputy: N. Toge
K. Yokoya
Function of
the Central and Regional teams
ILCSC – Daigu Sept 05 : B. Barish
• The Central Team is the focal point for
the ILC design effort, holding the
schedule, major milestones, and
parameter list, and providing intellectual
leadership under guidance of ICFA.
• Regional Teams perform the R&D
and design work of ILC systems in close
coordination with the Central Team.
Two categories of Efforts:
1) ILC Design Work
under the Central team
2) R&D Work
with colleagues from
Asia
16 GDE members from Asia
Norihito
Ouchi
Nobuhito
Terunuma
GDE RDR / R&D Organization
ICFA
FALC
FALC
Resource Board
ILCSC
- B. Barish Dec. 9,2005 -
GDE
Directorate
GDE
Executive Committee
GDE
R & D Board
ILC
R&D
Program
GDE
Change Control Board
Global
R&D Program
GDE
Design Cost Board
RDR
Design Matrix
ILC
Design
Effort
Activities in Two Areas:
ATF and STF
ATF
International Collaboration
STF
Construction
Work
Under way
Participation by
other institutes
is much welcome.
Budget
Budget
( Oku-Yen ~ 0.8 M$ )
Salary is not included.
2005 2006 2007 2008 2009
ATF/ATF2
3.0
STF
4.1
SCRF
2.1
Misc.
0.8
Total
30-40 Oku-Y/5Years
10.0 9.6+a
• Baseline Plan will cost ~
30 – 40 Oku-Yen additionally.
• STF Phase-II will cost about
20 - 30 Oku-Yen.
• ATF/ATF2 will cost ~ 3 Oku-Y
annually. We expect contribution
from outside.
Human Resources
No dramatic increase is expected
in 2005  2006.
Manpower
106 persons↑ : 42.5 FTE
-
ATF, ATF2 : 16.3
STF : 8.8
Baseline Cavity : 3.0
High G. Cavity : 8.8
EP, Clean room, etc : 0.9
Others : 4.7
Industrialization
Linear Collider Forum of Japan has
been active since 2002.
However, more efforts are needed in
soliciting Wisdom from the industry
to the ILC and creating Enthusiasm
for the ILC among to the industry
sector.
Collaboration
among three regions
Europe
• Proposal for a new European SCRF
Facility to be hosted by CERN
• 30 – 50 MEuro
• From 2008
USA
The FY2007 DOE budget
request for
the ILC R&D is doubled,
from $30 M to $60 M.
The time has come to think
about the world wide
coordination of the R&D works.
Weak Coordination of R&D efforts
among three regions
Eventually
ILCTA
ILC Test Accelerator
( somewhere in the world)
A few cryomodules
from each region
Before TDR
After TDR