Efforts by the KEK-ILC Team toward Realization of ILC Fumihiko Takasaki March 25, 2006
Download ReportTranscript Efforts by the KEK-ILC Team toward Realization of ILC Fumihiko Takasaki March 25, 2006
Efforts by the KEK-ILC Team toward Realization of ILC Fumihiko Takasaki March 25, 2006 KEK’s ILC Organization Chart MEXT Director General Director of Accelerator Lab Head of Div 4 ILC Team : ILC Office Head : F. T. ➔ Head : K. Yokoya Deputy: N. Toge K. Yokoya Function of the Central and Regional teams ILCSC – Daigu Sept 05 : B. Barish • The Central Team is the focal point for the ILC design effort, holding the schedule, major milestones, and parameter list, and providing intellectual leadership under guidance of ICFA. • Regional Teams perform the R&D and design work of ILC systems in close coordination with the Central Team. Two categories of Efforts: 1) ILC Design Work under the Central team 2) R&D Work with colleagues from Asia 16 GDE members from Asia Norihito Ouchi Nobuhito Terunuma GDE RDR / R&D Organization ICFA FALC FALC Resource Board ILCSC - B. Barish Dec. 9,2005 - GDE Directorate GDE Executive Committee GDE R & D Board ILC R&D Program GDE Change Control Board Global R&D Program GDE Design Cost Board RDR Design Matrix ILC Design Effort Activities in Two Areas: ATF and STF ATF International Collaboration STF Construction Work Under way Participation by other institutes is much welcome. Budget Budget ( Oku-Yen ~ 0.8 M$ ) Salary is not included. 2005 2006 2007 2008 2009 ATF/ATF2 3.0 STF 4.1 SCRF 2.1 Misc. 0.8 Total 30-40 Oku-Y/5Years 10.0 9.6+a • Baseline Plan will cost ~ 30 – 40 Oku-Yen additionally. • STF Phase-II will cost about 20 - 30 Oku-Yen. • ATF/ATF2 will cost ~ 3 Oku-Y annually. We expect contribution from outside. Human Resources No dramatic increase is expected in 2005 2006. Manpower 106 persons↑ : 42.5 FTE - ATF, ATF2 : 16.3 STF : 8.8 Baseline Cavity : 3.0 High G. Cavity : 8.8 EP, Clean room, etc : 0.9 Others : 4.7 Industrialization Linear Collider Forum of Japan has been active since 2002. However, more efforts are needed in soliciting Wisdom from the industry to the ILC and creating Enthusiasm for the ILC among to the industry sector. Collaboration among three regions Europe • Proposal for a new European SCRF Facility to be hosted by CERN • 30 – 50 MEuro • From 2008 USA The FY2007 DOE budget request for the ILC R&D is doubled, from $30 M to $60 M. The time has come to think about the world wide coordination of the R&D works. Weak Coordination of R&D efforts among three regions Eventually ILCTA ILC Test Accelerator ( somewhere in the world) A few cryomodules from each region Before TDR After TDR