The E951 Targetry Program Targetry Meeting CERN September 19, 2003 Harold G. Kirk Brookhaven National Laboratory.
Download ReportTranscript The E951 Targetry Program Targetry Meeting CERN September 19, 2003 Harold G. Kirk Brookhaven National Laboratory.
The E951 Targetry Program Targetry Meeting CERN September 19, 2003 Harold G. Kirk Brookhaven National Laboratory Interest in High-power Proton Drivers High average power—SNS Thermal management Radiation damage High peak power—NLC, Superbeams, NUFACT Thermal management Radiation damage Thermal shock Harold G. Kirk Superbeams Carbon is a good target candidate Higher momentum pions Stationary target up to 1.5 MW Good thermal properties Low energy deposition densities 28 GeV Proton Beam Harold G. Kirk Neutrino Factory Maximize Pion/Muon Production Soft Pion Production Higher Z material High energy deposition Prone to target dissipation High Magnetic Field Harold G. Kirk High-Z Materials Key Properties Maximal soft-pion production High pion absorption High peak energy deposition Potential for extension beyond 4 MW (liquids) Key Issues Jet dynamics in a high-field solenoid Target disruption Achievement of near-laminar flow for a 20 m/s jet Harold G. Kirk E951 Hg Jet Tests • 1cm Diameter Hg Jet • 24 GeV 4 TP Proton Beam • No Magnetic Field Harold G. Kirk CERN/Grenoble Hg Jet Tests • 4 mm Diameter Hg Jet • v = 12 m/s • 0, 10, 20T Magnetic Field • No Proton Beam A. Fabich, J. Lettry Nufact’02 Harold G. Kirk High Field Pulsed Solenoid 70o K Operation 15 T with 4.5 MW Pulsed Power 20 cm warm bore 1 m long beam pipe Peter Titus, MIT Harold G. Kirk Pulsed Solenoid Performance •5T Peak Field with 2 inner coils; 540 KVA ; 80O K •10T Peak Field with 2 inner coils; 2.2 MVA PS; 72O K •15T Peak Field with 3 coils; 2.2 MVA PS; 30O K •15T Peak Field with 3 coils; 4.4 MVA PS; 70O K Harold G. Kirk Cryogenic Performance BNL Pulsed Magnet LN2 Cooling BNL Pulsed Magnet, LN2 Cooling - No Internal Flow 100 95 100 95 85 blktemp outlet temp 80 75 70 Temperature K temperature K 90 90 85 blktemp outlet temp 80 75 70 65 65 60 0 60 0 200 400 600 800 1000 1200 500 1000 1500 2000 time (sec) time (sec) LN2 Forced Flow LN2 Pool Boiling Harold G. Kirk Battery Power Supply R&D Battery/Charger 12V 1400A Mech. Switch 1500V 1600 A Load Mechanical Switch capable of 4.4 MW Pulsed System IGCT 600V 4000A Harold G. Kirk Future E951 Running We plan to resume E951 running at the AGS. But DOE HEP support has been terminated for FY03 and will likely remain so for FY04 and FY05. We need to explore alternatives. Harold G. Kirk Alternative Running Alternatives for targetry running: BNL AGS Parameter CERN PS JPARC RCS JPARC MR Proton Energy, GeV 24 24 3 50 p/bunch, 1012 8 4 40 40 p/cycle, 1012 70 30 80 300 Cycle length, ms 2.2 2.0 0.6 4.2 Availability (?) 07 06 08 09 Harold G. Kirk