Large Capital Process – Steps 5, 6 and 7

Archdiocese of Atlanta
Large Capital Process

Step 5: Secure Financing
Step 6: Finalize Design
Step 7: Request Final Approval

Archdiocese of Atlanta
Office of Planning and Research

Step 5

Step 5 – Secure Financing
First, launch the capital campaign planned during Step 3

• Launch capital campaign
• Discuss loan requirements with
Finance

Large Capital Process – Steps 5, 6 and 7

Click for a helpful guide to running a
Capital Campaign.
Contact Steve Siler, Executive Director of
Stewardship for assistance with your
campaign.

Most major capital projects will require a capital campaign to raise the money needed to fund the project. These
campaigns typically involve the following :
What you need to begin:
• Case Statement Worthy of Support
• Defined Group of Constituents
• Solid Leadership
• Plan of Action
What you need to proceed:
Phase I:
Planning or Feasibility Study
Organization
Communications
Phase II:
Advanced Gifts Solicitation
Worker Recruitment
Execution Phase
Phase III:
The Campaign
General Phase
Phase IV:
Follow-up

Archdiocese of Atlanta
Office of Planning and Research

What you need to succeed:
A commitment to follow through on
a plan.
2

Step 5

Step 5 – Secure Financing

Large Capital Process – Steps 5, 6 and 7

Second, discuss loan requirements with Finance

• Launch capital campaign
• Discuss loan requirements with
Finance

Overview:
In the best case, the parish or school raises the funds required to complete the project prior to construction. In other cases,
not all the funds required for the project have been raised prior to construction, and a loan is needed. The loan approval
process is in place to evaluate the risk a parish or school will struggle to repay the loan. In evaluating the ability of the parish
or school to repay a loan, we consider the sources of funds pledged for repayment. Generally, the two sources of funds used
for repayment of loans are those funds generated from:
1. Annual Cash Flow - offertory/tuition is greater than expenses
2. Capital Campaigns
Loans based on Cash Flow:
Parishes (and schools) which have positive annual operating cash flow can use those funds as collateral for a loan. For
instance, if a parish has a history of, and is projected to have, positive cash flow of $100,000 per year for the next 5 years, then
having a $500,000 loan approved is not difficult. Likewise, a parish that has a history of breaking even would not be a
candidate for a loan based on future cash flows from operations.
Loans based on Capital Campaign:
Parishes (and schools) can qualify for a loan based on funds anticipated from a Capital Campaign. The unpaid pledges act as
the collateral for the loan. For instance, if a parish has a Capital Campaign which has unpaid pledges of $1,000,000, it can
request a loan of roughly $900,000. We do discount the unpaid pledges based on overall history and sometimes specific
history of pledge fulfillment.
Term of Loans
The term of the loan should be short as to not interfere with the financial needs of the parish or school in the future.
The term for a loan based on cash flow should be 10 year or less. The term can be extended up to 15 years if a school is
adjacent to the parish. The term of a loan based on a Capital Campaign should coincide with the length of the Capital
Campaign, generally 3 years.

Archdiocese of Atlanta
Office of Planning and Research

3

Step 5 – Secure Financing
Second, discuss loan requirements with Finance

Step 5

• Launch capital campaign
• Discuss loan requirements with
Finance

Large Capital Process – Steps 5, 6 and 7

Minimum Cash Requirement:
At a minimum, one-third of the total cost of the project must be in cash prior to the start of the project. While this implies that
two-thirds of a project can be financed, the wise pastor or school principal will use caution when borrowing funds.
Financial Application
The Financial Application is required for all capital projects. This document is used to capture the recent financial history of the
parish or school and to forecast the financial results into the future. The forecast is used to determine the financial risk of a
project.
Multi-Phase Projects:
A Master Plan may have multiple projects spread over many years. The establishment of a new parish is a good example of a
multi-phase project. For example, the new parish would need to acquire land, then build a worship space, and later build
classrooms, build or purchase a rectory, etc. Multi-phase projects require additional financial diligence to minimize risks. For
instance, we may require a financial application that extends 10 or 15 years to ensure that all parties have a common
understanding of the timetable for full completion.
Final Approval
The Project Review Committee of the Finance Council recommends loans for approval to the Archbishop of the Archdiocese of
Atlanta. All loans are approved by the Archbishop or by the Administrator

Archdiocese of Atlanta
Office of Planning and Research

4

Step 6

Step 6 – Final Design

Large Capital Process – Steps 5, 6 and 7

First, develop the detailed engineering and construction
drawings needed to finalize the design and cost of the project

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

Depending upon the level of success of the capital campaign, the Project design may remain unchanged, reduce in
scope, be enhanced in scope or abandoned.
If the project moves forward, the next major step is the development of the detailed engineering and construction
drawings needed to finalize the design and cost of the project. These services are included in the second phase of the
contract signed by the architect or design/build entity during Step 3 of the Large Capital Project process.
For the DESIGN-BUILD Approach:
•The Design/Build Entity will finalize the design
•Go to Slide 7- Obtain final cost
For the DESIGN-BID-BUILD Approach:
•The Architect will begin developing the detailed engineering and construction drawings needed
•The Architect will prepare to work with the selected contractor to finalize the design
•Go to Slide 6- Select contractor (if needed)

Archdiocese of Atlanta
Office of Planning and Research

5

Step 6

Step 6 – Final Design

Large Capital Process – Steps 5, 6 and 7

Second, select the Construction entity – if needed
(for Design-Bid-Build approach)

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

If the model of construction requires separate design and construction teams (i.e. in the Design – Bid – Build model), the
Building Committee will need to select Constructions Professionals using a similar process for selecting Design Professionals.
CCSI will help the parish identify and qualify 3-4 Construction entities and create RFPs. The Building Committee will then
receive bids under the guidance of CCSI and choose their team:
A) Identify potential Contractors
• The Building Committee (BC) should have a list of at least 3 qualified contractors they wish to solicit proposals from
• The contractor must be capable of acquiring a Payment & Performance Bond to qualify
• CCSI can supply a list of construction firms with references from other parishes that used these firms
B) Issue the Request for Proposal (RFP) for project contractors to bid on
• CCSI will issue an established customized Request for Proposal (RFP) to the short list of construction firms. This RFP
will include a complete breakdown of the construction costs for the Project prepared by CCSI for this particular
Project.
• The contractor responses to the RFP will provide the Building Committee with a “free look” from independent sources
of what the hard construction budget should be in the current “market place” and provide a check on the preliminary
hard construction budget provided by CCSI.
C) Select the contractor
• CCSI will summarize the RFP responses from the candidates in a spreadsheet for ease of reference.
• It is important to remember that the competing contractor candidates are competing on the basis of incomplete
plans. However certain portions of the proposals will be fixed.
• Based on BC feedback, CCSI will arrange to have all or some of the architectural firms or design/build entities make oral
presentations so that the BC may choose a contractor.
• Upon selection of the Contractor by the Parish, the Owner and the Contractor will execute a Letter of Intent (LOI).
• Warning – If this Contractor or other separate contractors fail to perform there may be legal costs associated with
enforcing the Contract terms. These costs are at the parish’s expense.
Archdiocese of Atlanta
Office of Planning and Research

6

Step 6

Step 6 – Final Design
Third, using the final design, finalize the cost of the project

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

Large Capital Process – Steps 5, 6 and 7

For the DESIGN-BUILD Approach:
•The Design/Build Entity will finalize and present the cost of the project

For the DESIGN-BID-BUILD Approach:
•The Contractor will work within the terms of the LOI through the remaining design phase providing the construction
cost data until the design is completed and within budget.
•The Architect and the Contractor will work together to agree on the final cost of the project

Archdiocese of Atlanta
Office of Planning and Research

7

Step 7

Step 7 – Request Final Approval to Begin Construction

Large Capital Process – Steps 5, 6 and 7

The seventh step is a formal request to the Archbishop for
approval to begin construction

• Cover letter from pastor
• Financial application form
Final Approval Cover Letter
Key points to include:
1. Formal request for permission to
begin construction
2. Updated cost estimate and
planned start date
3. Overview of financing plan

The final action to be taken prior to commencing construction is to request permission from the Archbishop to begin
construction. Prior to this request, all of the actions required under steps 1 through 6 should be completed.
The pastor will request final approval to begin construction by sending a letter to the Archbishop requesting his permission to
begin construction. The letter should contain the following information:
• The nature and total cost of the project
• Date construction is to begin
• The funding sources for the project
In addition, the letter should also contain an updated copy of the Financial Application. This form summarizes the financial
impact of the project and is presented to the Project Review Committee of the Archdiocesan Finance Council for its review
and recommendation to the Archbishop for final approval of any loan requested for the project.

Archdiocese of Atlanta
Office of Planning and Research

8

Overview of Large Capital Project Process

Step 2

Large Capital Process – Steps 5, 6 and 7

Step 1

Define and Review Project

• Review letter and forms
• Grant initial conceptual approval to
engage design professionals and/or a
capital campaign consultant

Request First Approval:
Initial Conceptual Approval

Step 3

Step 4

• CCSI to present Preliminary Drawings
to the Archbishop

Develop Preliminary Design

Request Second Approval:
Approval for Capital Campaign and
Detailed Drawings

Step 5

• Review letter and forms
• Grant approval to:
• Kick-off capital campaign
• Obtain detailed drawings and
cost estimate

Step 7

Secure Financing

• Review letter and forms
• Grant approval to begin construction

Request Final Approval:
Build Approval

Step 6

Finalize Design

Step 8

Step 9
Archdiocese of Atlanta
Office of Planning and Research

Construction Management
Acceptance and Dedication

Large Capital Process – Steps 5, 6 and 7

Who Do You Call?

• Peter Faletti, Director of Planning and Facilities
• Work phone
o
(680):
404-885-7279
o
(Lake Park): 404-920-7855
• Cell phone:
404-915-3785
• Email:
[email protected]
• Jenny Scheb, Planning Analyst
• Work phone:
o
(680):
404-885-7410
o
(Lake Park): 404-920-7852
• Email:
[email protected]
• http://www.archatl.com/offices/construction/
Archdiocese of Atlanta
Office of Planning and Research

10


Slide 2

Large Capital Process – Steps 5, 6 and 7

Archdiocese of Atlanta
Large Capital Process

Step 5: Secure Financing
Step 6: Finalize Design
Step 7: Request Final Approval

Archdiocese of Atlanta
Office of Planning and Research

Step 5

Step 5 – Secure Financing
First, launch the capital campaign planned during Step 3

• Launch capital campaign
• Discuss loan requirements with
Finance

Large Capital Process – Steps 5, 6 and 7

Click for a helpful guide to running a
Capital Campaign.
Contact Steve Siler, Executive Director of
Stewardship for assistance with your
campaign.

Most major capital projects will require a capital campaign to raise the money needed to fund the project. These
campaigns typically involve the following :
What you need to begin:
• Case Statement Worthy of Support
• Defined Group of Constituents
• Solid Leadership
• Plan of Action
What you need to proceed:
Phase I:
Planning or Feasibility Study
Organization
Communications
Phase II:
Advanced Gifts Solicitation
Worker Recruitment
Execution Phase
Phase III:
The Campaign
General Phase
Phase IV:
Follow-up

Archdiocese of Atlanta
Office of Planning and Research

What you need to succeed:
A commitment to follow through on
a plan.
2

Step 5

Step 5 – Secure Financing

Large Capital Process – Steps 5, 6 and 7

Second, discuss loan requirements with Finance

• Launch capital campaign
• Discuss loan requirements with
Finance

Overview:
In the best case, the parish or school raises the funds required to complete the project prior to construction. In other cases,
not all the funds required for the project have been raised prior to construction, and a loan is needed. The loan approval
process is in place to evaluate the risk a parish or school will struggle to repay the loan. In evaluating the ability of the parish
or school to repay a loan, we consider the sources of funds pledged for repayment. Generally, the two sources of funds used
for repayment of loans are those funds generated from:
1. Annual Cash Flow - offertory/tuition is greater than expenses
2. Capital Campaigns
Loans based on Cash Flow:
Parishes (and schools) which have positive annual operating cash flow can use those funds as collateral for a loan. For
instance, if a parish has a history of, and is projected to have, positive cash flow of $100,000 per year for the next 5 years, then
having a $500,000 loan approved is not difficult. Likewise, a parish that has a history of breaking even would not be a
candidate for a loan based on future cash flows from operations.
Loans based on Capital Campaign:
Parishes (and schools) can qualify for a loan based on funds anticipated from a Capital Campaign. The unpaid pledges act as
the collateral for the loan. For instance, if a parish has a Capital Campaign which has unpaid pledges of $1,000,000, it can
request a loan of roughly $900,000. We do discount the unpaid pledges based on overall history and sometimes specific
history of pledge fulfillment.
Term of Loans
The term of the loan should be short as to not interfere with the financial needs of the parish or school in the future.
The term for a loan based on cash flow should be 10 year or less. The term can be extended up to 15 years if a school is
adjacent to the parish. The term of a loan based on a Capital Campaign should coincide with the length of the Capital
Campaign, generally 3 years.

Archdiocese of Atlanta
Office of Planning and Research

3

Step 5 – Secure Financing
Second, discuss loan requirements with Finance

Step 5

• Launch capital campaign
• Discuss loan requirements with
Finance

Large Capital Process – Steps 5, 6 and 7

Minimum Cash Requirement:
At a minimum, one-third of the total cost of the project must be in cash prior to the start of the project. While this implies that
two-thirds of a project can be financed, the wise pastor or school principal will use caution when borrowing funds.
Financial Application
The Financial Application is required for all capital projects. This document is used to capture the recent financial history of the
parish or school and to forecast the financial results into the future. The forecast is used to determine the financial risk of a
project.
Multi-Phase Projects:
A Master Plan may have multiple projects spread over many years. The establishment of a new parish is a good example of a
multi-phase project. For example, the new parish would need to acquire land, then build a worship space, and later build
classrooms, build or purchase a rectory, etc. Multi-phase projects require additional financial diligence to minimize risks. For
instance, we may require a financial application that extends 10 or 15 years to ensure that all parties have a common
understanding of the timetable for full completion.
Final Approval
The Project Review Committee of the Finance Council recommends loans for approval to the Archbishop of the Archdiocese of
Atlanta. All loans are approved by the Archbishop or by the Administrator

Archdiocese of Atlanta
Office of Planning and Research

4

Step 6

Step 6 – Final Design

Large Capital Process – Steps 5, 6 and 7

First, develop the detailed engineering and construction
drawings needed to finalize the design and cost of the project

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

Depending upon the level of success of the capital campaign, the Project design may remain unchanged, reduce in
scope, be enhanced in scope or abandoned.
If the project moves forward, the next major step is the development of the detailed engineering and construction
drawings needed to finalize the design and cost of the project. These services are included in the second phase of the
contract signed by the architect or design/build entity during Step 3 of the Large Capital Project process.
For the DESIGN-BUILD Approach:
•The Design/Build Entity will finalize the design
•Go to Slide 7- Obtain final cost
For the DESIGN-BID-BUILD Approach:
•The Architect will begin developing the detailed engineering and construction drawings needed
•The Architect will prepare to work with the selected contractor to finalize the design
•Go to Slide 6- Select contractor (if needed)

Archdiocese of Atlanta
Office of Planning and Research

5

Step 6

Step 6 – Final Design

Large Capital Process – Steps 5, 6 and 7

Second, select the Construction entity – if needed
(for Design-Bid-Build approach)

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

If the model of construction requires separate design and construction teams (i.e. in the Design – Bid – Build model), the
Building Committee will need to select Constructions Professionals using a similar process for selecting Design Professionals.
CCSI will help the parish identify and qualify 3-4 Construction entities and create RFPs. The Building Committee will then
receive bids under the guidance of CCSI and choose their team:
A) Identify potential Contractors
• The Building Committee (BC) should have a list of at least 3 qualified contractors they wish to solicit proposals from
• The contractor must be capable of acquiring a Payment & Performance Bond to qualify
• CCSI can supply a list of construction firms with references from other parishes that used these firms
B) Issue the Request for Proposal (RFP) for project contractors to bid on
• CCSI will issue an established customized Request for Proposal (RFP) to the short list of construction firms. This RFP
will include a complete breakdown of the construction costs for the Project prepared by CCSI for this particular
Project.
• The contractor responses to the RFP will provide the Building Committee with a “free look” from independent sources
of what the hard construction budget should be in the current “market place” and provide a check on the preliminary
hard construction budget provided by CCSI.
C) Select the contractor
• CCSI will summarize the RFP responses from the candidates in a spreadsheet for ease of reference.
• It is important to remember that the competing contractor candidates are competing on the basis of incomplete
plans. However certain portions of the proposals will be fixed.
• Based on BC feedback, CCSI will arrange to have all or some of the architectural firms or design/build entities make oral
presentations so that the BC may choose a contractor.
• Upon selection of the Contractor by the Parish, the Owner and the Contractor will execute a Letter of Intent (LOI).
• Warning – If this Contractor or other separate contractors fail to perform there may be legal costs associated with
enforcing the Contract terms. These costs are at the parish’s expense.
Archdiocese of Atlanta
Office of Planning and Research

6

Step 6

Step 6 – Final Design
Third, using the final design, finalize the cost of the project

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

Large Capital Process – Steps 5, 6 and 7

For the DESIGN-BUILD Approach:
•The Design/Build Entity will finalize and present the cost of the project

For the DESIGN-BID-BUILD Approach:
•The Contractor will work within the terms of the LOI through the remaining design phase providing the construction
cost data until the design is completed and within budget.
•The Architect and the Contractor will work together to agree on the final cost of the project

Archdiocese of Atlanta
Office of Planning and Research

7

Step 7

Step 7 – Request Final Approval to Begin Construction

Large Capital Process – Steps 5, 6 and 7

The seventh step is a formal request to the Archbishop for
approval to begin construction

• Cover letter from pastor
• Financial application form
Final Approval Cover Letter
Key points to include:
1. Formal request for permission to
begin construction
2. Updated cost estimate and
planned start date
3. Overview of financing plan

The final action to be taken prior to commencing construction is to request permission from the Archbishop to begin
construction. Prior to this request, all of the actions required under steps 1 through 6 should be completed.
The pastor will request final approval to begin construction by sending a letter to the Archbishop requesting his permission to
begin construction. The letter should contain the following information:
• The nature and total cost of the project
• Date construction is to begin
• The funding sources for the project
In addition, the letter should also contain an updated copy of the Financial Application. This form summarizes the financial
impact of the project and is presented to the Project Review Committee of the Archdiocesan Finance Council for its review
and recommendation to the Archbishop for final approval of any loan requested for the project.

Archdiocese of Atlanta
Office of Planning and Research

8

Overview of Large Capital Project Process

Step 2

Large Capital Process – Steps 5, 6 and 7

Step 1

Define and Review Project

• Review letter and forms
• Grant initial conceptual approval to
engage design professionals and/or a
capital campaign consultant

Request First Approval:
Initial Conceptual Approval

Step 3

Step 4

• CCSI to present Preliminary Drawings
to the Archbishop

Develop Preliminary Design

Request Second Approval:
Approval for Capital Campaign and
Detailed Drawings

Step 5

• Review letter and forms
• Grant approval to:
• Kick-off capital campaign
• Obtain detailed drawings and
cost estimate

Step 7

Secure Financing

• Review letter and forms
• Grant approval to begin construction

Request Final Approval:
Build Approval

Step 6

Finalize Design

Step 8

Step 9
Archdiocese of Atlanta
Office of Planning and Research

Construction Management
Acceptance and Dedication

Large Capital Process – Steps 5, 6 and 7

Who Do You Call?

• Peter Faletti, Director of Planning and Facilities
• Work phone
o
(680):
404-885-7279
o
(Lake Park): 404-920-7855
• Cell phone:
404-915-3785
• Email:
[email protected]
• Jenny Scheb, Planning Analyst
• Work phone:
o
(680):
404-885-7410
o
(Lake Park): 404-920-7852
• Email:
[email protected]
• http://www.archatl.com/offices/construction/
Archdiocese of Atlanta
Office of Planning and Research

10


Slide 3

Large Capital Process – Steps 5, 6 and 7

Archdiocese of Atlanta
Large Capital Process

Step 5: Secure Financing
Step 6: Finalize Design
Step 7: Request Final Approval

Archdiocese of Atlanta
Office of Planning and Research

Step 5

Step 5 – Secure Financing
First, launch the capital campaign planned during Step 3

• Launch capital campaign
• Discuss loan requirements with
Finance

Large Capital Process – Steps 5, 6 and 7

Click for a helpful guide to running a
Capital Campaign.
Contact Steve Siler, Executive Director of
Stewardship for assistance with your
campaign.

Most major capital projects will require a capital campaign to raise the money needed to fund the project. These
campaigns typically involve the following :
What you need to begin:
• Case Statement Worthy of Support
• Defined Group of Constituents
• Solid Leadership
• Plan of Action
What you need to proceed:
Phase I:
Planning or Feasibility Study
Organization
Communications
Phase II:
Advanced Gifts Solicitation
Worker Recruitment
Execution Phase
Phase III:
The Campaign
General Phase
Phase IV:
Follow-up

Archdiocese of Atlanta
Office of Planning and Research

What you need to succeed:
A commitment to follow through on
a plan.
2

Step 5

Step 5 – Secure Financing

Large Capital Process – Steps 5, 6 and 7

Second, discuss loan requirements with Finance

• Launch capital campaign
• Discuss loan requirements with
Finance

Overview:
In the best case, the parish or school raises the funds required to complete the project prior to construction. In other cases,
not all the funds required for the project have been raised prior to construction, and a loan is needed. The loan approval
process is in place to evaluate the risk a parish or school will struggle to repay the loan. In evaluating the ability of the parish
or school to repay a loan, we consider the sources of funds pledged for repayment. Generally, the two sources of funds used
for repayment of loans are those funds generated from:
1. Annual Cash Flow - offertory/tuition is greater than expenses
2. Capital Campaigns
Loans based on Cash Flow:
Parishes (and schools) which have positive annual operating cash flow can use those funds as collateral for a loan. For
instance, if a parish has a history of, and is projected to have, positive cash flow of $100,000 per year for the next 5 years, then
having a $500,000 loan approved is not difficult. Likewise, a parish that has a history of breaking even would not be a
candidate for a loan based on future cash flows from operations.
Loans based on Capital Campaign:
Parishes (and schools) can qualify for a loan based on funds anticipated from a Capital Campaign. The unpaid pledges act as
the collateral for the loan. For instance, if a parish has a Capital Campaign which has unpaid pledges of $1,000,000, it can
request a loan of roughly $900,000. We do discount the unpaid pledges based on overall history and sometimes specific
history of pledge fulfillment.
Term of Loans
The term of the loan should be short as to not interfere with the financial needs of the parish or school in the future.
The term for a loan based on cash flow should be 10 year or less. The term can be extended up to 15 years if a school is
adjacent to the parish. The term of a loan based on a Capital Campaign should coincide with the length of the Capital
Campaign, generally 3 years.

Archdiocese of Atlanta
Office of Planning and Research

3

Step 5 – Secure Financing
Second, discuss loan requirements with Finance

Step 5

• Launch capital campaign
• Discuss loan requirements with
Finance

Large Capital Process – Steps 5, 6 and 7

Minimum Cash Requirement:
At a minimum, one-third of the total cost of the project must be in cash prior to the start of the project. While this implies that
two-thirds of a project can be financed, the wise pastor or school principal will use caution when borrowing funds.
Financial Application
The Financial Application is required for all capital projects. This document is used to capture the recent financial history of the
parish or school and to forecast the financial results into the future. The forecast is used to determine the financial risk of a
project.
Multi-Phase Projects:
A Master Plan may have multiple projects spread over many years. The establishment of a new parish is a good example of a
multi-phase project. For example, the new parish would need to acquire land, then build a worship space, and later build
classrooms, build or purchase a rectory, etc. Multi-phase projects require additional financial diligence to minimize risks. For
instance, we may require a financial application that extends 10 or 15 years to ensure that all parties have a common
understanding of the timetable for full completion.
Final Approval
The Project Review Committee of the Finance Council recommends loans for approval to the Archbishop of the Archdiocese of
Atlanta. All loans are approved by the Archbishop or by the Administrator

Archdiocese of Atlanta
Office of Planning and Research

4

Step 6

Step 6 – Final Design

Large Capital Process – Steps 5, 6 and 7

First, develop the detailed engineering and construction
drawings needed to finalize the design and cost of the project

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

Depending upon the level of success of the capital campaign, the Project design may remain unchanged, reduce in
scope, be enhanced in scope or abandoned.
If the project moves forward, the next major step is the development of the detailed engineering and construction
drawings needed to finalize the design and cost of the project. These services are included in the second phase of the
contract signed by the architect or design/build entity during Step 3 of the Large Capital Project process.
For the DESIGN-BUILD Approach:
•The Design/Build Entity will finalize the design
•Go to Slide 7- Obtain final cost
For the DESIGN-BID-BUILD Approach:
•The Architect will begin developing the detailed engineering and construction drawings needed
•The Architect will prepare to work with the selected contractor to finalize the design
•Go to Slide 6- Select contractor (if needed)

Archdiocese of Atlanta
Office of Planning and Research

5

Step 6

Step 6 – Final Design

Large Capital Process – Steps 5, 6 and 7

Second, select the Construction entity – if needed
(for Design-Bid-Build approach)

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

If the model of construction requires separate design and construction teams (i.e. in the Design – Bid – Build model), the
Building Committee will need to select Constructions Professionals using a similar process for selecting Design Professionals.
CCSI will help the parish identify and qualify 3-4 Construction entities and create RFPs. The Building Committee will then
receive bids under the guidance of CCSI and choose their team:
A) Identify potential Contractors
• The Building Committee (BC) should have a list of at least 3 qualified contractors they wish to solicit proposals from
• The contractor must be capable of acquiring a Payment & Performance Bond to qualify
• CCSI can supply a list of construction firms with references from other parishes that used these firms
B) Issue the Request for Proposal (RFP) for project contractors to bid on
• CCSI will issue an established customized Request for Proposal (RFP) to the short list of construction firms. This RFP
will include a complete breakdown of the construction costs for the Project prepared by CCSI for this particular
Project.
• The contractor responses to the RFP will provide the Building Committee with a “free look” from independent sources
of what the hard construction budget should be in the current “market place” and provide a check on the preliminary
hard construction budget provided by CCSI.
C) Select the contractor
• CCSI will summarize the RFP responses from the candidates in a spreadsheet for ease of reference.
• It is important to remember that the competing contractor candidates are competing on the basis of incomplete
plans. However certain portions of the proposals will be fixed.
• Based on BC feedback, CCSI will arrange to have all or some of the architectural firms or design/build entities make oral
presentations so that the BC may choose a contractor.
• Upon selection of the Contractor by the Parish, the Owner and the Contractor will execute a Letter of Intent (LOI).
• Warning – If this Contractor or other separate contractors fail to perform there may be legal costs associated with
enforcing the Contract terms. These costs are at the parish’s expense.
Archdiocese of Atlanta
Office of Planning and Research

6

Step 6

Step 6 – Final Design
Third, using the final design, finalize the cost of the project

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

Large Capital Process – Steps 5, 6 and 7

For the DESIGN-BUILD Approach:
•The Design/Build Entity will finalize and present the cost of the project

For the DESIGN-BID-BUILD Approach:
•The Contractor will work within the terms of the LOI through the remaining design phase providing the construction
cost data until the design is completed and within budget.
•The Architect and the Contractor will work together to agree on the final cost of the project

Archdiocese of Atlanta
Office of Planning and Research

7

Step 7

Step 7 – Request Final Approval to Begin Construction

Large Capital Process – Steps 5, 6 and 7

The seventh step is a formal request to the Archbishop for
approval to begin construction

• Cover letter from pastor
• Financial application form
Final Approval Cover Letter
Key points to include:
1. Formal request for permission to
begin construction
2. Updated cost estimate and
planned start date
3. Overview of financing plan

The final action to be taken prior to commencing construction is to request permission from the Archbishop to begin
construction. Prior to this request, all of the actions required under steps 1 through 6 should be completed.
The pastor will request final approval to begin construction by sending a letter to the Archbishop requesting his permission to
begin construction. The letter should contain the following information:
• The nature and total cost of the project
• Date construction is to begin
• The funding sources for the project
In addition, the letter should also contain an updated copy of the Financial Application. This form summarizes the financial
impact of the project and is presented to the Project Review Committee of the Archdiocesan Finance Council for its review
and recommendation to the Archbishop for final approval of any loan requested for the project.

Archdiocese of Atlanta
Office of Planning and Research

8

Overview of Large Capital Project Process

Step 2

Large Capital Process – Steps 5, 6 and 7

Step 1

Define and Review Project

• Review letter and forms
• Grant initial conceptual approval to
engage design professionals and/or a
capital campaign consultant

Request First Approval:
Initial Conceptual Approval

Step 3

Step 4

• CCSI to present Preliminary Drawings
to the Archbishop

Develop Preliminary Design

Request Second Approval:
Approval for Capital Campaign and
Detailed Drawings

Step 5

• Review letter and forms
• Grant approval to:
• Kick-off capital campaign
• Obtain detailed drawings and
cost estimate

Step 7

Secure Financing

• Review letter and forms
• Grant approval to begin construction

Request Final Approval:
Build Approval

Step 6

Finalize Design

Step 8

Step 9
Archdiocese of Atlanta
Office of Planning and Research

Construction Management
Acceptance and Dedication

Large Capital Process – Steps 5, 6 and 7

Who Do You Call?

• Peter Faletti, Director of Planning and Facilities
• Work phone
o
(680):
404-885-7279
o
(Lake Park): 404-920-7855
• Cell phone:
404-915-3785
• Email:
[email protected]
• Jenny Scheb, Planning Analyst
• Work phone:
o
(680):
404-885-7410
o
(Lake Park): 404-920-7852
• Email:
[email protected]
• http://www.archatl.com/offices/construction/
Archdiocese of Atlanta
Office of Planning and Research

10


Slide 4

Large Capital Process – Steps 5, 6 and 7

Archdiocese of Atlanta
Large Capital Process

Step 5: Secure Financing
Step 6: Finalize Design
Step 7: Request Final Approval

Archdiocese of Atlanta
Office of Planning and Research

Step 5

Step 5 – Secure Financing
First, launch the capital campaign planned during Step 3

• Launch capital campaign
• Discuss loan requirements with
Finance

Large Capital Process – Steps 5, 6 and 7

Click for a helpful guide to running a
Capital Campaign.
Contact Steve Siler, Executive Director of
Stewardship for assistance with your
campaign.

Most major capital projects will require a capital campaign to raise the money needed to fund the project. These
campaigns typically involve the following :
What you need to begin:
• Case Statement Worthy of Support
• Defined Group of Constituents
• Solid Leadership
• Plan of Action
What you need to proceed:
Phase I:
Planning or Feasibility Study
Organization
Communications
Phase II:
Advanced Gifts Solicitation
Worker Recruitment
Execution Phase
Phase III:
The Campaign
General Phase
Phase IV:
Follow-up

Archdiocese of Atlanta
Office of Planning and Research

What you need to succeed:
A commitment to follow through on
a plan.
2

Step 5

Step 5 – Secure Financing

Large Capital Process – Steps 5, 6 and 7

Second, discuss loan requirements with Finance

• Launch capital campaign
• Discuss loan requirements with
Finance

Overview:
In the best case, the parish or school raises the funds required to complete the project prior to construction. In other cases,
not all the funds required for the project have been raised prior to construction, and a loan is needed. The loan approval
process is in place to evaluate the risk a parish or school will struggle to repay the loan. In evaluating the ability of the parish
or school to repay a loan, we consider the sources of funds pledged for repayment. Generally, the two sources of funds used
for repayment of loans are those funds generated from:
1. Annual Cash Flow - offertory/tuition is greater than expenses
2. Capital Campaigns
Loans based on Cash Flow:
Parishes (and schools) which have positive annual operating cash flow can use those funds as collateral for a loan. For
instance, if a parish has a history of, and is projected to have, positive cash flow of $100,000 per year for the next 5 years, then
having a $500,000 loan approved is not difficult. Likewise, a parish that has a history of breaking even would not be a
candidate for a loan based on future cash flows from operations.
Loans based on Capital Campaign:
Parishes (and schools) can qualify for a loan based on funds anticipated from a Capital Campaign. The unpaid pledges act as
the collateral for the loan. For instance, if a parish has a Capital Campaign which has unpaid pledges of $1,000,000, it can
request a loan of roughly $900,000. We do discount the unpaid pledges based on overall history and sometimes specific
history of pledge fulfillment.
Term of Loans
The term of the loan should be short as to not interfere with the financial needs of the parish or school in the future.
The term for a loan based on cash flow should be 10 year or less. The term can be extended up to 15 years if a school is
adjacent to the parish. The term of a loan based on a Capital Campaign should coincide with the length of the Capital
Campaign, generally 3 years.

Archdiocese of Atlanta
Office of Planning and Research

3

Step 5 – Secure Financing
Second, discuss loan requirements with Finance

Step 5

• Launch capital campaign
• Discuss loan requirements with
Finance

Large Capital Process – Steps 5, 6 and 7

Minimum Cash Requirement:
At a minimum, one-third of the total cost of the project must be in cash prior to the start of the project. While this implies that
two-thirds of a project can be financed, the wise pastor or school principal will use caution when borrowing funds.
Financial Application
The Financial Application is required for all capital projects. This document is used to capture the recent financial history of the
parish or school and to forecast the financial results into the future. The forecast is used to determine the financial risk of a
project.
Multi-Phase Projects:
A Master Plan may have multiple projects spread over many years. The establishment of a new parish is a good example of a
multi-phase project. For example, the new parish would need to acquire land, then build a worship space, and later build
classrooms, build or purchase a rectory, etc. Multi-phase projects require additional financial diligence to minimize risks. For
instance, we may require a financial application that extends 10 or 15 years to ensure that all parties have a common
understanding of the timetable for full completion.
Final Approval
The Project Review Committee of the Finance Council recommends loans for approval to the Archbishop of the Archdiocese of
Atlanta. All loans are approved by the Archbishop or by the Administrator

Archdiocese of Atlanta
Office of Planning and Research

4

Step 6

Step 6 – Final Design

Large Capital Process – Steps 5, 6 and 7

First, develop the detailed engineering and construction
drawings needed to finalize the design and cost of the project

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

Depending upon the level of success of the capital campaign, the Project design may remain unchanged, reduce in
scope, be enhanced in scope or abandoned.
If the project moves forward, the next major step is the development of the detailed engineering and construction
drawings needed to finalize the design and cost of the project. These services are included in the second phase of the
contract signed by the architect or design/build entity during Step 3 of the Large Capital Project process.
For the DESIGN-BUILD Approach:
•The Design/Build Entity will finalize the design
•Go to Slide 7- Obtain final cost
For the DESIGN-BID-BUILD Approach:
•The Architect will begin developing the detailed engineering and construction drawings needed
•The Architect will prepare to work with the selected contractor to finalize the design
•Go to Slide 6- Select contractor (if needed)

Archdiocese of Atlanta
Office of Planning and Research

5

Step 6

Step 6 – Final Design

Large Capital Process – Steps 5, 6 and 7

Second, select the Construction entity – if needed
(for Design-Bid-Build approach)

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

If the model of construction requires separate design and construction teams (i.e. in the Design – Bid – Build model), the
Building Committee will need to select Constructions Professionals using a similar process for selecting Design Professionals.
CCSI will help the parish identify and qualify 3-4 Construction entities and create RFPs. The Building Committee will then
receive bids under the guidance of CCSI and choose their team:
A) Identify potential Contractors
• The Building Committee (BC) should have a list of at least 3 qualified contractors they wish to solicit proposals from
• The contractor must be capable of acquiring a Payment & Performance Bond to qualify
• CCSI can supply a list of construction firms with references from other parishes that used these firms
B) Issue the Request for Proposal (RFP) for project contractors to bid on
• CCSI will issue an established customized Request for Proposal (RFP) to the short list of construction firms. This RFP
will include a complete breakdown of the construction costs for the Project prepared by CCSI for this particular
Project.
• The contractor responses to the RFP will provide the Building Committee with a “free look” from independent sources
of what the hard construction budget should be in the current “market place” and provide a check on the preliminary
hard construction budget provided by CCSI.
C) Select the contractor
• CCSI will summarize the RFP responses from the candidates in a spreadsheet for ease of reference.
• It is important to remember that the competing contractor candidates are competing on the basis of incomplete
plans. However certain portions of the proposals will be fixed.
• Based on BC feedback, CCSI will arrange to have all or some of the architectural firms or design/build entities make oral
presentations so that the BC may choose a contractor.
• Upon selection of the Contractor by the Parish, the Owner and the Contractor will execute a Letter of Intent (LOI).
• Warning – If this Contractor or other separate contractors fail to perform there may be legal costs associated with
enforcing the Contract terms. These costs are at the parish’s expense.
Archdiocese of Atlanta
Office of Planning and Research

6

Step 6

Step 6 – Final Design
Third, using the final design, finalize the cost of the project

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

Large Capital Process – Steps 5, 6 and 7

For the DESIGN-BUILD Approach:
•The Design/Build Entity will finalize and present the cost of the project

For the DESIGN-BID-BUILD Approach:
•The Contractor will work within the terms of the LOI through the remaining design phase providing the construction
cost data until the design is completed and within budget.
•The Architect and the Contractor will work together to agree on the final cost of the project

Archdiocese of Atlanta
Office of Planning and Research

7

Step 7

Step 7 – Request Final Approval to Begin Construction

Large Capital Process – Steps 5, 6 and 7

The seventh step is a formal request to the Archbishop for
approval to begin construction

• Cover letter from pastor
• Financial application form
Final Approval Cover Letter
Key points to include:
1. Formal request for permission to
begin construction
2. Updated cost estimate and
planned start date
3. Overview of financing plan

The final action to be taken prior to commencing construction is to request permission from the Archbishop to begin
construction. Prior to this request, all of the actions required under steps 1 through 6 should be completed.
The pastor will request final approval to begin construction by sending a letter to the Archbishop requesting his permission to
begin construction. The letter should contain the following information:
• The nature and total cost of the project
• Date construction is to begin
• The funding sources for the project
In addition, the letter should also contain an updated copy of the Financial Application. This form summarizes the financial
impact of the project and is presented to the Project Review Committee of the Archdiocesan Finance Council for its review
and recommendation to the Archbishop for final approval of any loan requested for the project.

Archdiocese of Atlanta
Office of Planning and Research

8

Overview of Large Capital Project Process

Step 2

Large Capital Process – Steps 5, 6 and 7

Step 1

Define and Review Project

• Review letter and forms
• Grant initial conceptual approval to
engage design professionals and/or a
capital campaign consultant

Request First Approval:
Initial Conceptual Approval

Step 3

Step 4

• CCSI to present Preliminary Drawings
to the Archbishop

Develop Preliminary Design

Request Second Approval:
Approval for Capital Campaign and
Detailed Drawings

Step 5

• Review letter and forms
• Grant approval to:
• Kick-off capital campaign
• Obtain detailed drawings and
cost estimate

Step 7

Secure Financing

• Review letter and forms
• Grant approval to begin construction

Request Final Approval:
Build Approval

Step 6

Finalize Design

Step 8

Step 9
Archdiocese of Atlanta
Office of Planning and Research

Construction Management
Acceptance and Dedication

Large Capital Process – Steps 5, 6 and 7

Who Do You Call?

• Peter Faletti, Director of Planning and Facilities
• Work phone
o
(680):
404-885-7279
o
(Lake Park): 404-920-7855
• Cell phone:
404-915-3785
• Email:
[email protected]
• Jenny Scheb, Planning Analyst
• Work phone:
o
(680):
404-885-7410
o
(Lake Park): 404-920-7852
• Email:
[email protected]
• http://www.archatl.com/offices/construction/
Archdiocese of Atlanta
Office of Planning and Research

10


Slide 5

Large Capital Process – Steps 5, 6 and 7

Archdiocese of Atlanta
Large Capital Process

Step 5: Secure Financing
Step 6: Finalize Design
Step 7: Request Final Approval

Archdiocese of Atlanta
Office of Planning and Research

Step 5

Step 5 – Secure Financing
First, launch the capital campaign planned during Step 3

• Launch capital campaign
• Discuss loan requirements with
Finance

Large Capital Process – Steps 5, 6 and 7

Click for a helpful guide to running a
Capital Campaign.
Contact Steve Siler, Executive Director of
Stewardship for assistance with your
campaign.

Most major capital projects will require a capital campaign to raise the money needed to fund the project. These
campaigns typically involve the following :
What you need to begin:
• Case Statement Worthy of Support
• Defined Group of Constituents
• Solid Leadership
• Plan of Action
What you need to proceed:
Phase I:
Planning or Feasibility Study
Organization
Communications
Phase II:
Advanced Gifts Solicitation
Worker Recruitment
Execution Phase
Phase III:
The Campaign
General Phase
Phase IV:
Follow-up

Archdiocese of Atlanta
Office of Planning and Research

What you need to succeed:
A commitment to follow through on
a plan.
2

Step 5

Step 5 – Secure Financing

Large Capital Process – Steps 5, 6 and 7

Second, discuss loan requirements with Finance

• Launch capital campaign
• Discuss loan requirements with
Finance

Overview:
In the best case, the parish or school raises the funds required to complete the project prior to construction. In other cases,
not all the funds required for the project have been raised prior to construction, and a loan is needed. The loan approval
process is in place to evaluate the risk a parish or school will struggle to repay the loan. In evaluating the ability of the parish
or school to repay a loan, we consider the sources of funds pledged for repayment. Generally, the two sources of funds used
for repayment of loans are those funds generated from:
1. Annual Cash Flow - offertory/tuition is greater than expenses
2. Capital Campaigns
Loans based on Cash Flow:
Parishes (and schools) which have positive annual operating cash flow can use those funds as collateral for a loan. For
instance, if a parish has a history of, and is projected to have, positive cash flow of $100,000 per year for the next 5 years, then
having a $500,000 loan approved is not difficult. Likewise, a parish that has a history of breaking even would not be a
candidate for a loan based on future cash flows from operations.
Loans based on Capital Campaign:
Parishes (and schools) can qualify for a loan based on funds anticipated from a Capital Campaign. The unpaid pledges act as
the collateral for the loan. For instance, if a parish has a Capital Campaign which has unpaid pledges of $1,000,000, it can
request a loan of roughly $900,000. We do discount the unpaid pledges based on overall history and sometimes specific
history of pledge fulfillment.
Term of Loans
The term of the loan should be short as to not interfere with the financial needs of the parish or school in the future.
The term for a loan based on cash flow should be 10 year or less. The term can be extended up to 15 years if a school is
adjacent to the parish. The term of a loan based on a Capital Campaign should coincide with the length of the Capital
Campaign, generally 3 years.

Archdiocese of Atlanta
Office of Planning and Research

3

Step 5 – Secure Financing
Second, discuss loan requirements with Finance

Step 5

• Launch capital campaign
• Discuss loan requirements with
Finance

Large Capital Process – Steps 5, 6 and 7

Minimum Cash Requirement:
At a minimum, one-third of the total cost of the project must be in cash prior to the start of the project. While this implies that
two-thirds of a project can be financed, the wise pastor or school principal will use caution when borrowing funds.
Financial Application
The Financial Application is required for all capital projects. This document is used to capture the recent financial history of the
parish or school and to forecast the financial results into the future. The forecast is used to determine the financial risk of a
project.
Multi-Phase Projects:
A Master Plan may have multiple projects spread over many years. The establishment of a new parish is a good example of a
multi-phase project. For example, the new parish would need to acquire land, then build a worship space, and later build
classrooms, build or purchase a rectory, etc. Multi-phase projects require additional financial diligence to minimize risks. For
instance, we may require a financial application that extends 10 or 15 years to ensure that all parties have a common
understanding of the timetable for full completion.
Final Approval
The Project Review Committee of the Finance Council recommends loans for approval to the Archbishop of the Archdiocese of
Atlanta. All loans are approved by the Archbishop or by the Administrator

Archdiocese of Atlanta
Office of Planning and Research

4

Step 6

Step 6 – Final Design

Large Capital Process – Steps 5, 6 and 7

First, develop the detailed engineering and construction
drawings needed to finalize the design and cost of the project

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

Depending upon the level of success of the capital campaign, the Project design may remain unchanged, reduce in
scope, be enhanced in scope or abandoned.
If the project moves forward, the next major step is the development of the detailed engineering and construction
drawings needed to finalize the design and cost of the project. These services are included in the second phase of the
contract signed by the architect or design/build entity during Step 3 of the Large Capital Project process.
For the DESIGN-BUILD Approach:
•The Design/Build Entity will finalize the design
•Go to Slide 7- Obtain final cost
For the DESIGN-BID-BUILD Approach:
•The Architect will begin developing the detailed engineering and construction drawings needed
•The Architect will prepare to work with the selected contractor to finalize the design
•Go to Slide 6- Select contractor (if needed)

Archdiocese of Atlanta
Office of Planning and Research

5

Step 6

Step 6 – Final Design

Large Capital Process – Steps 5, 6 and 7

Second, select the Construction entity – if needed
(for Design-Bid-Build approach)

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

If the model of construction requires separate design and construction teams (i.e. in the Design – Bid – Build model), the
Building Committee will need to select Constructions Professionals using a similar process for selecting Design Professionals.
CCSI will help the parish identify and qualify 3-4 Construction entities and create RFPs. The Building Committee will then
receive bids under the guidance of CCSI and choose their team:
A) Identify potential Contractors
• The Building Committee (BC) should have a list of at least 3 qualified contractors they wish to solicit proposals from
• The contractor must be capable of acquiring a Payment & Performance Bond to qualify
• CCSI can supply a list of construction firms with references from other parishes that used these firms
B) Issue the Request for Proposal (RFP) for project contractors to bid on
• CCSI will issue an established customized Request for Proposal (RFP) to the short list of construction firms. This RFP
will include a complete breakdown of the construction costs for the Project prepared by CCSI for this particular
Project.
• The contractor responses to the RFP will provide the Building Committee with a “free look” from independent sources
of what the hard construction budget should be in the current “market place” and provide a check on the preliminary
hard construction budget provided by CCSI.
C) Select the contractor
• CCSI will summarize the RFP responses from the candidates in a spreadsheet for ease of reference.
• It is important to remember that the competing contractor candidates are competing on the basis of incomplete
plans. However certain portions of the proposals will be fixed.
• Based on BC feedback, CCSI will arrange to have all or some of the architectural firms or design/build entities make oral
presentations so that the BC may choose a contractor.
• Upon selection of the Contractor by the Parish, the Owner and the Contractor will execute a Letter of Intent (LOI).
• Warning – If this Contractor or other separate contractors fail to perform there may be legal costs associated with
enforcing the Contract terms. These costs are at the parish’s expense.
Archdiocese of Atlanta
Office of Planning and Research

6

Step 6

Step 6 – Final Design
Third, using the final design, finalize the cost of the project

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

Large Capital Process – Steps 5, 6 and 7

For the DESIGN-BUILD Approach:
•The Design/Build Entity will finalize and present the cost of the project

For the DESIGN-BID-BUILD Approach:
•The Contractor will work within the terms of the LOI through the remaining design phase providing the construction
cost data until the design is completed and within budget.
•The Architect and the Contractor will work together to agree on the final cost of the project

Archdiocese of Atlanta
Office of Planning and Research

7

Step 7

Step 7 – Request Final Approval to Begin Construction

Large Capital Process – Steps 5, 6 and 7

The seventh step is a formal request to the Archbishop for
approval to begin construction

• Cover letter from pastor
• Financial application form
Final Approval Cover Letter
Key points to include:
1. Formal request for permission to
begin construction
2. Updated cost estimate and
planned start date
3. Overview of financing plan

The final action to be taken prior to commencing construction is to request permission from the Archbishop to begin
construction. Prior to this request, all of the actions required under steps 1 through 6 should be completed.
The pastor will request final approval to begin construction by sending a letter to the Archbishop requesting his permission to
begin construction. The letter should contain the following information:
• The nature and total cost of the project
• Date construction is to begin
• The funding sources for the project
In addition, the letter should also contain an updated copy of the Financial Application. This form summarizes the financial
impact of the project and is presented to the Project Review Committee of the Archdiocesan Finance Council for its review
and recommendation to the Archbishop for final approval of any loan requested for the project.

Archdiocese of Atlanta
Office of Planning and Research

8

Overview of Large Capital Project Process

Step 2

Large Capital Process – Steps 5, 6 and 7

Step 1

Define and Review Project

• Review letter and forms
• Grant initial conceptual approval to
engage design professionals and/or a
capital campaign consultant

Request First Approval:
Initial Conceptual Approval

Step 3

Step 4

• CCSI to present Preliminary Drawings
to the Archbishop

Develop Preliminary Design

Request Second Approval:
Approval for Capital Campaign and
Detailed Drawings

Step 5

• Review letter and forms
• Grant approval to:
• Kick-off capital campaign
• Obtain detailed drawings and
cost estimate

Step 7

Secure Financing

• Review letter and forms
• Grant approval to begin construction

Request Final Approval:
Build Approval

Step 6

Finalize Design

Step 8

Step 9
Archdiocese of Atlanta
Office of Planning and Research

Construction Management
Acceptance and Dedication

Large Capital Process – Steps 5, 6 and 7

Who Do You Call?

• Peter Faletti, Director of Planning and Facilities
• Work phone
o
(680):
404-885-7279
o
(Lake Park): 404-920-7855
• Cell phone:
404-915-3785
• Email:
[email protected]
• Jenny Scheb, Planning Analyst
• Work phone:
o
(680):
404-885-7410
o
(Lake Park): 404-920-7852
• Email:
[email protected]
• http://www.archatl.com/offices/construction/
Archdiocese of Atlanta
Office of Planning and Research

10


Slide 6

Large Capital Process – Steps 5, 6 and 7

Archdiocese of Atlanta
Large Capital Process

Step 5: Secure Financing
Step 6: Finalize Design
Step 7: Request Final Approval

Archdiocese of Atlanta
Office of Planning and Research

Step 5

Step 5 – Secure Financing
First, launch the capital campaign planned during Step 3

• Launch capital campaign
• Discuss loan requirements with
Finance

Large Capital Process – Steps 5, 6 and 7

Click for a helpful guide to running a
Capital Campaign.
Contact Steve Siler, Executive Director of
Stewardship for assistance with your
campaign.

Most major capital projects will require a capital campaign to raise the money needed to fund the project. These
campaigns typically involve the following :
What you need to begin:
• Case Statement Worthy of Support
• Defined Group of Constituents
• Solid Leadership
• Plan of Action
What you need to proceed:
Phase I:
Planning or Feasibility Study
Organization
Communications
Phase II:
Advanced Gifts Solicitation
Worker Recruitment
Execution Phase
Phase III:
The Campaign
General Phase
Phase IV:
Follow-up

Archdiocese of Atlanta
Office of Planning and Research

What you need to succeed:
A commitment to follow through on
a plan.
2

Step 5

Step 5 – Secure Financing

Large Capital Process – Steps 5, 6 and 7

Second, discuss loan requirements with Finance

• Launch capital campaign
• Discuss loan requirements with
Finance

Overview:
In the best case, the parish or school raises the funds required to complete the project prior to construction. In other cases,
not all the funds required for the project have been raised prior to construction, and a loan is needed. The loan approval
process is in place to evaluate the risk a parish or school will struggle to repay the loan. In evaluating the ability of the parish
or school to repay a loan, we consider the sources of funds pledged for repayment. Generally, the two sources of funds used
for repayment of loans are those funds generated from:
1. Annual Cash Flow - offertory/tuition is greater than expenses
2. Capital Campaigns
Loans based on Cash Flow:
Parishes (and schools) which have positive annual operating cash flow can use those funds as collateral for a loan. For
instance, if a parish has a history of, and is projected to have, positive cash flow of $100,000 per year for the next 5 years, then
having a $500,000 loan approved is not difficult. Likewise, a parish that has a history of breaking even would not be a
candidate for a loan based on future cash flows from operations.
Loans based on Capital Campaign:
Parishes (and schools) can qualify for a loan based on funds anticipated from a Capital Campaign. The unpaid pledges act as
the collateral for the loan. For instance, if a parish has a Capital Campaign which has unpaid pledges of $1,000,000, it can
request a loan of roughly $900,000. We do discount the unpaid pledges based on overall history and sometimes specific
history of pledge fulfillment.
Term of Loans
The term of the loan should be short as to not interfere with the financial needs of the parish or school in the future.
The term for a loan based on cash flow should be 10 year or less. The term can be extended up to 15 years if a school is
adjacent to the parish. The term of a loan based on a Capital Campaign should coincide with the length of the Capital
Campaign, generally 3 years.

Archdiocese of Atlanta
Office of Planning and Research

3

Step 5 – Secure Financing
Second, discuss loan requirements with Finance

Step 5

• Launch capital campaign
• Discuss loan requirements with
Finance

Large Capital Process – Steps 5, 6 and 7

Minimum Cash Requirement:
At a minimum, one-third of the total cost of the project must be in cash prior to the start of the project. While this implies that
two-thirds of a project can be financed, the wise pastor or school principal will use caution when borrowing funds.
Financial Application
The Financial Application is required for all capital projects. This document is used to capture the recent financial history of the
parish or school and to forecast the financial results into the future. The forecast is used to determine the financial risk of a
project.
Multi-Phase Projects:
A Master Plan may have multiple projects spread over many years. The establishment of a new parish is a good example of a
multi-phase project. For example, the new parish would need to acquire land, then build a worship space, and later build
classrooms, build or purchase a rectory, etc. Multi-phase projects require additional financial diligence to minimize risks. For
instance, we may require a financial application that extends 10 or 15 years to ensure that all parties have a common
understanding of the timetable for full completion.
Final Approval
The Project Review Committee of the Finance Council recommends loans for approval to the Archbishop of the Archdiocese of
Atlanta. All loans are approved by the Archbishop or by the Administrator

Archdiocese of Atlanta
Office of Planning and Research

4

Step 6

Step 6 – Final Design

Large Capital Process – Steps 5, 6 and 7

First, develop the detailed engineering and construction
drawings needed to finalize the design and cost of the project

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

Depending upon the level of success of the capital campaign, the Project design may remain unchanged, reduce in
scope, be enhanced in scope or abandoned.
If the project moves forward, the next major step is the development of the detailed engineering and construction
drawings needed to finalize the design and cost of the project. These services are included in the second phase of the
contract signed by the architect or design/build entity during Step 3 of the Large Capital Project process.
For the DESIGN-BUILD Approach:
•The Design/Build Entity will finalize the design
•Go to Slide 7- Obtain final cost
For the DESIGN-BID-BUILD Approach:
•The Architect will begin developing the detailed engineering and construction drawings needed
•The Architect will prepare to work with the selected contractor to finalize the design
•Go to Slide 6- Select contractor (if needed)

Archdiocese of Atlanta
Office of Planning and Research

5

Step 6

Step 6 – Final Design

Large Capital Process – Steps 5, 6 and 7

Second, select the Construction entity – if needed
(for Design-Bid-Build approach)

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

If the model of construction requires separate design and construction teams (i.e. in the Design – Bid – Build model), the
Building Committee will need to select Constructions Professionals using a similar process for selecting Design Professionals.
CCSI will help the parish identify and qualify 3-4 Construction entities and create RFPs. The Building Committee will then
receive bids under the guidance of CCSI and choose their team:
A) Identify potential Contractors
• The Building Committee (BC) should have a list of at least 3 qualified contractors they wish to solicit proposals from
• The contractor must be capable of acquiring a Payment & Performance Bond to qualify
• CCSI can supply a list of construction firms with references from other parishes that used these firms
B) Issue the Request for Proposal (RFP) for project contractors to bid on
• CCSI will issue an established customized Request for Proposal (RFP) to the short list of construction firms. This RFP
will include a complete breakdown of the construction costs for the Project prepared by CCSI for this particular
Project.
• The contractor responses to the RFP will provide the Building Committee with a “free look” from independent sources
of what the hard construction budget should be in the current “market place” and provide a check on the preliminary
hard construction budget provided by CCSI.
C) Select the contractor
• CCSI will summarize the RFP responses from the candidates in a spreadsheet for ease of reference.
• It is important to remember that the competing contractor candidates are competing on the basis of incomplete
plans. However certain portions of the proposals will be fixed.
• Based on BC feedback, CCSI will arrange to have all or some of the architectural firms or design/build entities make oral
presentations so that the BC may choose a contractor.
• Upon selection of the Contractor by the Parish, the Owner and the Contractor will execute a Letter of Intent (LOI).
• Warning – If this Contractor or other separate contractors fail to perform there may be legal costs associated with
enforcing the Contract terms. These costs are at the parish’s expense.
Archdiocese of Atlanta
Office of Planning and Research

6

Step 6

Step 6 – Final Design
Third, using the final design, finalize the cost of the project

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

Large Capital Process – Steps 5, 6 and 7

For the DESIGN-BUILD Approach:
•The Design/Build Entity will finalize and present the cost of the project

For the DESIGN-BID-BUILD Approach:
•The Contractor will work within the terms of the LOI through the remaining design phase providing the construction
cost data until the design is completed and within budget.
•The Architect and the Contractor will work together to agree on the final cost of the project

Archdiocese of Atlanta
Office of Planning and Research

7

Step 7

Step 7 – Request Final Approval to Begin Construction

Large Capital Process – Steps 5, 6 and 7

The seventh step is a formal request to the Archbishop for
approval to begin construction

• Cover letter from pastor
• Financial application form
Final Approval Cover Letter
Key points to include:
1. Formal request for permission to
begin construction
2. Updated cost estimate and
planned start date
3. Overview of financing plan

The final action to be taken prior to commencing construction is to request permission from the Archbishop to begin
construction. Prior to this request, all of the actions required under steps 1 through 6 should be completed.
The pastor will request final approval to begin construction by sending a letter to the Archbishop requesting his permission to
begin construction. The letter should contain the following information:
• The nature and total cost of the project
• Date construction is to begin
• The funding sources for the project
In addition, the letter should also contain an updated copy of the Financial Application. This form summarizes the financial
impact of the project and is presented to the Project Review Committee of the Archdiocesan Finance Council for its review
and recommendation to the Archbishop for final approval of any loan requested for the project.

Archdiocese of Atlanta
Office of Planning and Research

8

Overview of Large Capital Project Process

Step 2

Large Capital Process – Steps 5, 6 and 7

Step 1

Define and Review Project

• Review letter and forms
• Grant initial conceptual approval to
engage design professionals and/or a
capital campaign consultant

Request First Approval:
Initial Conceptual Approval

Step 3

Step 4

• CCSI to present Preliminary Drawings
to the Archbishop

Develop Preliminary Design

Request Second Approval:
Approval for Capital Campaign and
Detailed Drawings

Step 5

• Review letter and forms
• Grant approval to:
• Kick-off capital campaign
• Obtain detailed drawings and
cost estimate

Step 7

Secure Financing

• Review letter and forms
• Grant approval to begin construction

Request Final Approval:
Build Approval

Step 6

Finalize Design

Step 8

Step 9
Archdiocese of Atlanta
Office of Planning and Research

Construction Management
Acceptance and Dedication

Large Capital Process – Steps 5, 6 and 7

Who Do You Call?

• Peter Faletti, Director of Planning and Facilities
• Work phone
o
(680):
404-885-7279
o
(Lake Park): 404-920-7855
• Cell phone:
404-915-3785
• Email:
[email protected]
• Jenny Scheb, Planning Analyst
• Work phone:
o
(680):
404-885-7410
o
(Lake Park): 404-920-7852
• Email:
[email protected]
• http://www.archatl.com/offices/construction/
Archdiocese of Atlanta
Office of Planning and Research

10


Slide 7

Large Capital Process – Steps 5, 6 and 7

Archdiocese of Atlanta
Large Capital Process

Step 5: Secure Financing
Step 6: Finalize Design
Step 7: Request Final Approval

Archdiocese of Atlanta
Office of Planning and Research

Step 5

Step 5 – Secure Financing
First, launch the capital campaign planned during Step 3

• Launch capital campaign
• Discuss loan requirements with
Finance

Large Capital Process – Steps 5, 6 and 7

Click for a helpful guide to running a
Capital Campaign.
Contact Steve Siler, Executive Director of
Stewardship for assistance with your
campaign.

Most major capital projects will require a capital campaign to raise the money needed to fund the project. These
campaigns typically involve the following :
What you need to begin:
• Case Statement Worthy of Support
• Defined Group of Constituents
• Solid Leadership
• Plan of Action
What you need to proceed:
Phase I:
Planning or Feasibility Study
Organization
Communications
Phase II:
Advanced Gifts Solicitation
Worker Recruitment
Execution Phase
Phase III:
The Campaign
General Phase
Phase IV:
Follow-up

Archdiocese of Atlanta
Office of Planning and Research

What you need to succeed:
A commitment to follow through on
a plan.
2

Step 5

Step 5 – Secure Financing

Large Capital Process – Steps 5, 6 and 7

Second, discuss loan requirements with Finance

• Launch capital campaign
• Discuss loan requirements with
Finance

Overview:
In the best case, the parish or school raises the funds required to complete the project prior to construction. In other cases,
not all the funds required for the project have been raised prior to construction, and a loan is needed. The loan approval
process is in place to evaluate the risk a parish or school will struggle to repay the loan. In evaluating the ability of the parish
or school to repay a loan, we consider the sources of funds pledged for repayment. Generally, the two sources of funds used
for repayment of loans are those funds generated from:
1. Annual Cash Flow - offertory/tuition is greater than expenses
2. Capital Campaigns
Loans based on Cash Flow:
Parishes (and schools) which have positive annual operating cash flow can use those funds as collateral for a loan. For
instance, if a parish has a history of, and is projected to have, positive cash flow of $100,000 per year for the next 5 years, then
having a $500,000 loan approved is not difficult. Likewise, a parish that has a history of breaking even would not be a
candidate for a loan based on future cash flows from operations.
Loans based on Capital Campaign:
Parishes (and schools) can qualify for a loan based on funds anticipated from a Capital Campaign. The unpaid pledges act as
the collateral for the loan. For instance, if a parish has a Capital Campaign which has unpaid pledges of $1,000,000, it can
request a loan of roughly $900,000. We do discount the unpaid pledges based on overall history and sometimes specific
history of pledge fulfillment.
Term of Loans
The term of the loan should be short as to not interfere with the financial needs of the parish or school in the future.
The term for a loan based on cash flow should be 10 year or less. The term can be extended up to 15 years if a school is
adjacent to the parish. The term of a loan based on a Capital Campaign should coincide with the length of the Capital
Campaign, generally 3 years.

Archdiocese of Atlanta
Office of Planning and Research

3

Step 5 – Secure Financing
Second, discuss loan requirements with Finance

Step 5

• Launch capital campaign
• Discuss loan requirements with
Finance

Large Capital Process – Steps 5, 6 and 7

Minimum Cash Requirement:
At a minimum, one-third of the total cost of the project must be in cash prior to the start of the project. While this implies that
two-thirds of a project can be financed, the wise pastor or school principal will use caution when borrowing funds.
Financial Application
The Financial Application is required for all capital projects. This document is used to capture the recent financial history of the
parish or school and to forecast the financial results into the future. The forecast is used to determine the financial risk of a
project.
Multi-Phase Projects:
A Master Plan may have multiple projects spread over many years. The establishment of a new parish is a good example of a
multi-phase project. For example, the new parish would need to acquire land, then build a worship space, and later build
classrooms, build or purchase a rectory, etc. Multi-phase projects require additional financial diligence to minimize risks. For
instance, we may require a financial application that extends 10 or 15 years to ensure that all parties have a common
understanding of the timetable for full completion.
Final Approval
The Project Review Committee of the Finance Council recommends loans for approval to the Archbishop of the Archdiocese of
Atlanta. All loans are approved by the Archbishop or by the Administrator

Archdiocese of Atlanta
Office of Planning and Research

4

Step 6

Step 6 – Final Design

Large Capital Process – Steps 5, 6 and 7

First, develop the detailed engineering and construction
drawings needed to finalize the design and cost of the project

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

Depending upon the level of success of the capital campaign, the Project design may remain unchanged, reduce in
scope, be enhanced in scope or abandoned.
If the project moves forward, the next major step is the development of the detailed engineering and construction
drawings needed to finalize the design and cost of the project. These services are included in the second phase of the
contract signed by the architect or design/build entity during Step 3 of the Large Capital Project process.
For the DESIGN-BUILD Approach:
•The Design/Build Entity will finalize the design
•Go to Slide 7- Obtain final cost
For the DESIGN-BID-BUILD Approach:
•The Architect will begin developing the detailed engineering and construction drawings needed
•The Architect will prepare to work with the selected contractor to finalize the design
•Go to Slide 6- Select contractor (if needed)

Archdiocese of Atlanta
Office of Planning and Research

5

Step 6

Step 6 – Final Design

Large Capital Process – Steps 5, 6 and 7

Second, select the Construction entity – if needed
(for Design-Bid-Build approach)

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

If the model of construction requires separate design and construction teams (i.e. in the Design – Bid – Build model), the
Building Committee will need to select Constructions Professionals using a similar process for selecting Design Professionals.
CCSI will help the parish identify and qualify 3-4 Construction entities and create RFPs. The Building Committee will then
receive bids under the guidance of CCSI and choose their team:
A) Identify potential Contractors
• The Building Committee (BC) should have a list of at least 3 qualified contractors they wish to solicit proposals from
• The contractor must be capable of acquiring a Payment & Performance Bond to qualify
• CCSI can supply a list of construction firms with references from other parishes that used these firms
B) Issue the Request for Proposal (RFP) for project contractors to bid on
• CCSI will issue an established customized Request for Proposal (RFP) to the short list of construction firms. This RFP
will include a complete breakdown of the construction costs for the Project prepared by CCSI for this particular
Project.
• The contractor responses to the RFP will provide the Building Committee with a “free look” from independent sources
of what the hard construction budget should be in the current “market place” and provide a check on the preliminary
hard construction budget provided by CCSI.
C) Select the contractor
• CCSI will summarize the RFP responses from the candidates in a spreadsheet for ease of reference.
• It is important to remember that the competing contractor candidates are competing on the basis of incomplete
plans. However certain portions of the proposals will be fixed.
• Based on BC feedback, CCSI will arrange to have all or some of the architectural firms or design/build entities make oral
presentations so that the BC may choose a contractor.
• Upon selection of the Contractor by the Parish, the Owner and the Contractor will execute a Letter of Intent (LOI).
• Warning – If this Contractor or other separate contractors fail to perform there may be legal costs associated with
enforcing the Contract terms. These costs are at the parish’s expense.
Archdiocese of Atlanta
Office of Planning and Research

6

Step 6

Step 6 – Final Design
Third, using the final design, finalize the cost of the project

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

Large Capital Process – Steps 5, 6 and 7

For the DESIGN-BUILD Approach:
•The Design/Build Entity will finalize and present the cost of the project

For the DESIGN-BID-BUILD Approach:
•The Contractor will work within the terms of the LOI through the remaining design phase providing the construction
cost data until the design is completed and within budget.
•The Architect and the Contractor will work together to agree on the final cost of the project

Archdiocese of Atlanta
Office of Planning and Research

7

Step 7

Step 7 – Request Final Approval to Begin Construction

Large Capital Process – Steps 5, 6 and 7

The seventh step is a formal request to the Archbishop for
approval to begin construction

• Cover letter from pastor
• Financial application form
Final Approval Cover Letter
Key points to include:
1. Formal request for permission to
begin construction
2. Updated cost estimate and
planned start date
3. Overview of financing plan

The final action to be taken prior to commencing construction is to request permission from the Archbishop to begin
construction. Prior to this request, all of the actions required under steps 1 through 6 should be completed.
The pastor will request final approval to begin construction by sending a letter to the Archbishop requesting his permission to
begin construction. The letter should contain the following information:
• The nature and total cost of the project
• Date construction is to begin
• The funding sources for the project
In addition, the letter should also contain an updated copy of the Financial Application. This form summarizes the financial
impact of the project and is presented to the Project Review Committee of the Archdiocesan Finance Council for its review
and recommendation to the Archbishop for final approval of any loan requested for the project.

Archdiocese of Atlanta
Office of Planning and Research

8

Overview of Large Capital Project Process

Step 2

Large Capital Process – Steps 5, 6 and 7

Step 1

Define and Review Project

• Review letter and forms
• Grant initial conceptual approval to
engage design professionals and/or a
capital campaign consultant

Request First Approval:
Initial Conceptual Approval

Step 3

Step 4

• CCSI to present Preliminary Drawings
to the Archbishop

Develop Preliminary Design

Request Second Approval:
Approval for Capital Campaign and
Detailed Drawings

Step 5

• Review letter and forms
• Grant approval to:
• Kick-off capital campaign
• Obtain detailed drawings and
cost estimate

Step 7

Secure Financing

• Review letter and forms
• Grant approval to begin construction

Request Final Approval:
Build Approval

Step 6

Finalize Design

Step 8

Step 9
Archdiocese of Atlanta
Office of Planning and Research

Construction Management
Acceptance and Dedication

Large Capital Process – Steps 5, 6 and 7

Who Do You Call?

• Peter Faletti, Director of Planning and Facilities
• Work phone
o
(680):
404-885-7279
o
(Lake Park): 404-920-7855
• Cell phone:
404-915-3785
• Email:
[email protected]
• Jenny Scheb, Planning Analyst
• Work phone:
o
(680):
404-885-7410
o
(Lake Park): 404-920-7852
• Email:
[email protected]
• http://www.archatl.com/offices/construction/
Archdiocese of Atlanta
Office of Planning and Research

10


Slide 8

Large Capital Process – Steps 5, 6 and 7

Archdiocese of Atlanta
Large Capital Process

Step 5: Secure Financing
Step 6: Finalize Design
Step 7: Request Final Approval

Archdiocese of Atlanta
Office of Planning and Research

Step 5

Step 5 – Secure Financing
First, launch the capital campaign planned during Step 3

• Launch capital campaign
• Discuss loan requirements with
Finance

Large Capital Process – Steps 5, 6 and 7

Click for a helpful guide to running a
Capital Campaign.
Contact Steve Siler, Executive Director of
Stewardship for assistance with your
campaign.

Most major capital projects will require a capital campaign to raise the money needed to fund the project. These
campaigns typically involve the following :
What you need to begin:
• Case Statement Worthy of Support
• Defined Group of Constituents
• Solid Leadership
• Plan of Action
What you need to proceed:
Phase I:
Planning or Feasibility Study
Organization
Communications
Phase II:
Advanced Gifts Solicitation
Worker Recruitment
Execution Phase
Phase III:
The Campaign
General Phase
Phase IV:
Follow-up

Archdiocese of Atlanta
Office of Planning and Research

What you need to succeed:
A commitment to follow through on
a plan.
2

Step 5

Step 5 – Secure Financing

Large Capital Process – Steps 5, 6 and 7

Second, discuss loan requirements with Finance

• Launch capital campaign
• Discuss loan requirements with
Finance

Overview:
In the best case, the parish or school raises the funds required to complete the project prior to construction. In other cases,
not all the funds required for the project have been raised prior to construction, and a loan is needed. The loan approval
process is in place to evaluate the risk a parish or school will struggle to repay the loan. In evaluating the ability of the parish
or school to repay a loan, we consider the sources of funds pledged for repayment. Generally, the two sources of funds used
for repayment of loans are those funds generated from:
1. Annual Cash Flow - offertory/tuition is greater than expenses
2. Capital Campaigns
Loans based on Cash Flow:
Parishes (and schools) which have positive annual operating cash flow can use those funds as collateral for a loan. For
instance, if a parish has a history of, and is projected to have, positive cash flow of $100,000 per year for the next 5 years, then
having a $500,000 loan approved is not difficult. Likewise, a parish that has a history of breaking even would not be a
candidate for a loan based on future cash flows from operations.
Loans based on Capital Campaign:
Parishes (and schools) can qualify for a loan based on funds anticipated from a Capital Campaign. The unpaid pledges act as
the collateral for the loan. For instance, if a parish has a Capital Campaign which has unpaid pledges of $1,000,000, it can
request a loan of roughly $900,000. We do discount the unpaid pledges based on overall history and sometimes specific
history of pledge fulfillment.
Term of Loans
The term of the loan should be short as to not interfere with the financial needs of the parish or school in the future.
The term for a loan based on cash flow should be 10 year or less. The term can be extended up to 15 years if a school is
adjacent to the parish. The term of a loan based on a Capital Campaign should coincide with the length of the Capital
Campaign, generally 3 years.

Archdiocese of Atlanta
Office of Planning and Research

3

Step 5 – Secure Financing
Second, discuss loan requirements with Finance

Step 5

• Launch capital campaign
• Discuss loan requirements with
Finance

Large Capital Process – Steps 5, 6 and 7

Minimum Cash Requirement:
At a minimum, one-third of the total cost of the project must be in cash prior to the start of the project. While this implies that
two-thirds of a project can be financed, the wise pastor or school principal will use caution when borrowing funds.
Financial Application
The Financial Application is required for all capital projects. This document is used to capture the recent financial history of the
parish or school and to forecast the financial results into the future. The forecast is used to determine the financial risk of a
project.
Multi-Phase Projects:
A Master Plan may have multiple projects spread over many years. The establishment of a new parish is a good example of a
multi-phase project. For example, the new parish would need to acquire land, then build a worship space, and later build
classrooms, build or purchase a rectory, etc. Multi-phase projects require additional financial diligence to minimize risks. For
instance, we may require a financial application that extends 10 or 15 years to ensure that all parties have a common
understanding of the timetable for full completion.
Final Approval
The Project Review Committee of the Finance Council recommends loans for approval to the Archbishop of the Archdiocese of
Atlanta. All loans are approved by the Archbishop or by the Administrator

Archdiocese of Atlanta
Office of Planning and Research

4

Step 6

Step 6 – Final Design

Large Capital Process – Steps 5, 6 and 7

First, develop the detailed engineering and construction
drawings needed to finalize the design and cost of the project

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

Depending upon the level of success of the capital campaign, the Project design may remain unchanged, reduce in
scope, be enhanced in scope or abandoned.
If the project moves forward, the next major step is the development of the detailed engineering and construction
drawings needed to finalize the design and cost of the project. These services are included in the second phase of the
contract signed by the architect or design/build entity during Step 3 of the Large Capital Project process.
For the DESIGN-BUILD Approach:
•The Design/Build Entity will finalize the design
•Go to Slide 7- Obtain final cost
For the DESIGN-BID-BUILD Approach:
•The Architect will begin developing the detailed engineering and construction drawings needed
•The Architect will prepare to work with the selected contractor to finalize the design
•Go to Slide 6- Select contractor (if needed)

Archdiocese of Atlanta
Office of Planning and Research

5

Step 6

Step 6 – Final Design

Large Capital Process – Steps 5, 6 and 7

Second, select the Construction entity – if needed
(for Design-Bid-Build approach)

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

If the model of construction requires separate design and construction teams (i.e. in the Design – Bid – Build model), the
Building Committee will need to select Constructions Professionals using a similar process for selecting Design Professionals.
CCSI will help the parish identify and qualify 3-4 Construction entities and create RFPs. The Building Committee will then
receive bids under the guidance of CCSI and choose their team:
A) Identify potential Contractors
• The Building Committee (BC) should have a list of at least 3 qualified contractors they wish to solicit proposals from
• The contractor must be capable of acquiring a Payment & Performance Bond to qualify
• CCSI can supply a list of construction firms with references from other parishes that used these firms
B) Issue the Request for Proposal (RFP) for project contractors to bid on
• CCSI will issue an established customized Request for Proposal (RFP) to the short list of construction firms. This RFP
will include a complete breakdown of the construction costs for the Project prepared by CCSI for this particular
Project.
• The contractor responses to the RFP will provide the Building Committee with a “free look” from independent sources
of what the hard construction budget should be in the current “market place” and provide a check on the preliminary
hard construction budget provided by CCSI.
C) Select the contractor
• CCSI will summarize the RFP responses from the candidates in a spreadsheet for ease of reference.
• It is important to remember that the competing contractor candidates are competing on the basis of incomplete
plans. However certain portions of the proposals will be fixed.
• Based on BC feedback, CCSI will arrange to have all or some of the architectural firms or design/build entities make oral
presentations so that the BC may choose a contractor.
• Upon selection of the Contractor by the Parish, the Owner and the Contractor will execute a Letter of Intent (LOI).
• Warning – If this Contractor or other separate contractors fail to perform there may be legal costs associated with
enforcing the Contract terms. These costs are at the parish’s expense.
Archdiocese of Atlanta
Office of Planning and Research

6

Step 6

Step 6 – Final Design
Third, using the final design, finalize the cost of the project

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

Large Capital Process – Steps 5, 6 and 7

For the DESIGN-BUILD Approach:
•The Design/Build Entity will finalize and present the cost of the project

For the DESIGN-BID-BUILD Approach:
•The Contractor will work within the terms of the LOI through the remaining design phase providing the construction
cost data until the design is completed and within budget.
•The Architect and the Contractor will work together to agree on the final cost of the project

Archdiocese of Atlanta
Office of Planning and Research

7

Step 7

Step 7 – Request Final Approval to Begin Construction

Large Capital Process – Steps 5, 6 and 7

The seventh step is a formal request to the Archbishop for
approval to begin construction

• Cover letter from pastor
• Financial application form
Final Approval Cover Letter
Key points to include:
1. Formal request for permission to
begin construction
2. Updated cost estimate and
planned start date
3. Overview of financing plan

The final action to be taken prior to commencing construction is to request permission from the Archbishop to begin
construction. Prior to this request, all of the actions required under steps 1 through 6 should be completed.
The pastor will request final approval to begin construction by sending a letter to the Archbishop requesting his permission to
begin construction. The letter should contain the following information:
• The nature and total cost of the project
• Date construction is to begin
• The funding sources for the project
In addition, the letter should also contain an updated copy of the Financial Application. This form summarizes the financial
impact of the project and is presented to the Project Review Committee of the Archdiocesan Finance Council for its review
and recommendation to the Archbishop for final approval of any loan requested for the project.

Archdiocese of Atlanta
Office of Planning and Research

8

Overview of Large Capital Project Process

Step 2

Large Capital Process – Steps 5, 6 and 7

Step 1

Define and Review Project

• Review letter and forms
• Grant initial conceptual approval to
engage design professionals and/or a
capital campaign consultant

Request First Approval:
Initial Conceptual Approval

Step 3

Step 4

• CCSI to present Preliminary Drawings
to the Archbishop

Develop Preliminary Design

Request Second Approval:
Approval for Capital Campaign and
Detailed Drawings

Step 5

• Review letter and forms
• Grant approval to:
• Kick-off capital campaign
• Obtain detailed drawings and
cost estimate

Step 7

Secure Financing

• Review letter and forms
• Grant approval to begin construction

Request Final Approval:
Build Approval

Step 6

Finalize Design

Step 8

Step 9
Archdiocese of Atlanta
Office of Planning and Research

Construction Management
Acceptance and Dedication

Large Capital Process – Steps 5, 6 and 7

Who Do You Call?

• Peter Faletti, Director of Planning and Facilities
• Work phone
o
(680):
404-885-7279
o
(Lake Park): 404-920-7855
• Cell phone:
404-915-3785
• Email:
[email protected]
• Jenny Scheb, Planning Analyst
• Work phone:
o
(680):
404-885-7410
o
(Lake Park): 404-920-7852
• Email:
[email protected]
• http://www.archatl.com/offices/construction/
Archdiocese of Atlanta
Office of Planning and Research

10


Slide 9

Large Capital Process – Steps 5, 6 and 7

Archdiocese of Atlanta
Large Capital Process

Step 5: Secure Financing
Step 6: Finalize Design
Step 7: Request Final Approval

Archdiocese of Atlanta
Office of Planning and Research

Step 5

Step 5 – Secure Financing
First, launch the capital campaign planned during Step 3

• Launch capital campaign
• Discuss loan requirements with
Finance

Large Capital Process – Steps 5, 6 and 7

Click for a helpful guide to running a
Capital Campaign.
Contact Steve Siler, Executive Director of
Stewardship for assistance with your
campaign.

Most major capital projects will require a capital campaign to raise the money needed to fund the project. These
campaigns typically involve the following :
What you need to begin:
• Case Statement Worthy of Support
• Defined Group of Constituents
• Solid Leadership
• Plan of Action
What you need to proceed:
Phase I:
Planning or Feasibility Study
Organization
Communications
Phase II:
Advanced Gifts Solicitation
Worker Recruitment
Execution Phase
Phase III:
The Campaign
General Phase
Phase IV:
Follow-up

Archdiocese of Atlanta
Office of Planning and Research

What you need to succeed:
A commitment to follow through on
a plan.
2

Step 5

Step 5 – Secure Financing

Large Capital Process – Steps 5, 6 and 7

Second, discuss loan requirements with Finance

• Launch capital campaign
• Discuss loan requirements with
Finance

Overview:
In the best case, the parish or school raises the funds required to complete the project prior to construction. In other cases,
not all the funds required for the project have been raised prior to construction, and a loan is needed. The loan approval
process is in place to evaluate the risk a parish or school will struggle to repay the loan. In evaluating the ability of the parish
or school to repay a loan, we consider the sources of funds pledged for repayment. Generally, the two sources of funds used
for repayment of loans are those funds generated from:
1. Annual Cash Flow - offertory/tuition is greater than expenses
2. Capital Campaigns
Loans based on Cash Flow:
Parishes (and schools) which have positive annual operating cash flow can use those funds as collateral for a loan. For
instance, if a parish has a history of, and is projected to have, positive cash flow of $100,000 per year for the next 5 years, then
having a $500,000 loan approved is not difficult. Likewise, a parish that has a history of breaking even would not be a
candidate for a loan based on future cash flows from operations.
Loans based on Capital Campaign:
Parishes (and schools) can qualify for a loan based on funds anticipated from a Capital Campaign. The unpaid pledges act as
the collateral for the loan. For instance, if a parish has a Capital Campaign which has unpaid pledges of $1,000,000, it can
request a loan of roughly $900,000. We do discount the unpaid pledges based on overall history and sometimes specific
history of pledge fulfillment.
Term of Loans
The term of the loan should be short as to not interfere with the financial needs of the parish or school in the future.
The term for a loan based on cash flow should be 10 year or less. The term can be extended up to 15 years if a school is
adjacent to the parish. The term of a loan based on a Capital Campaign should coincide with the length of the Capital
Campaign, generally 3 years.

Archdiocese of Atlanta
Office of Planning and Research

3

Step 5 – Secure Financing
Second, discuss loan requirements with Finance

Step 5

• Launch capital campaign
• Discuss loan requirements with
Finance

Large Capital Process – Steps 5, 6 and 7

Minimum Cash Requirement:
At a minimum, one-third of the total cost of the project must be in cash prior to the start of the project. While this implies that
two-thirds of a project can be financed, the wise pastor or school principal will use caution when borrowing funds.
Financial Application
The Financial Application is required for all capital projects. This document is used to capture the recent financial history of the
parish or school and to forecast the financial results into the future. The forecast is used to determine the financial risk of a
project.
Multi-Phase Projects:
A Master Plan may have multiple projects spread over many years. The establishment of a new parish is a good example of a
multi-phase project. For example, the new parish would need to acquire land, then build a worship space, and later build
classrooms, build or purchase a rectory, etc. Multi-phase projects require additional financial diligence to minimize risks. For
instance, we may require a financial application that extends 10 or 15 years to ensure that all parties have a common
understanding of the timetable for full completion.
Final Approval
The Project Review Committee of the Finance Council recommends loans for approval to the Archbishop of the Archdiocese of
Atlanta. All loans are approved by the Archbishop or by the Administrator

Archdiocese of Atlanta
Office of Planning and Research

4

Step 6

Step 6 – Final Design

Large Capital Process – Steps 5, 6 and 7

First, develop the detailed engineering and construction
drawings needed to finalize the design and cost of the project

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

Depending upon the level of success of the capital campaign, the Project design may remain unchanged, reduce in
scope, be enhanced in scope or abandoned.
If the project moves forward, the next major step is the development of the detailed engineering and construction
drawings needed to finalize the design and cost of the project. These services are included in the second phase of the
contract signed by the architect or design/build entity during Step 3 of the Large Capital Project process.
For the DESIGN-BUILD Approach:
•The Design/Build Entity will finalize the design
•Go to Slide 7- Obtain final cost
For the DESIGN-BID-BUILD Approach:
•The Architect will begin developing the detailed engineering and construction drawings needed
•The Architect will prepare to work with the selected contractor to finalize the design
•Go to Slide 6- Select contractor (if needed)

Archdiocese of Atlanta
Office of Planning and Research

5

Step 6

Step 6 – Final Design

Large Capital Process – Steps 5, 6 and 7

Second, select the Construction entity – if needed
(for Design-Bid-Build approach)

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

If the model of construction requires separate design and construction teams (i.e. in the Design – Bid – Build model), the
Building Committee will need to select Constructions Professionals using a similar process for selecting Design Professionals.
CCSI will help the parish identify and qualify 3-4 Construction entities and create RFPs. The Building Committee will then
receive bids under the guidance of CCSI and choose their team:
A) Identify potential Contractors
• The Building Committee (BC) should have a list of at least 3 qualified contractors they wish to solicit proposals from
• The contractor must be capable of acquiring a Payment & Performance Bond to qualify
• CCSI can supply a list of construction firms with references from other parishes that used these firms
B) Issue the Request for Proposal (RFP) for project contractors to bid on
• CCSI will issue an established customized Request for Proposal (RFP) to the short list of construction firms. This RFP
will include a complete breakdown of the construction costs for the Project prepared by CCSI for this particular
Project.
• The contractor responses to the RFP will provide the Building Committee with a “free look” from independent sources
of what the hard construction budget should be in the current “market place” and provide a check on the preliminary
hard construction budget provided by CCSI.
C) Select the contractor
• CCSI will summarize the RFP responses from the candidates in a spreadsheet for ease of reference.
• It is important to remember that the competing contractor candidates are competing on the basis of incomplete
plans. However certain portions of the proposals will be fixed.
• Based on BC feedback, CCSI will arrange to have all or some of the architectural firms or design/build entities make oral
presentations so that the BC may choose a contractor.
• Upon selection of the Contractor by the Parish, the Owner and the Contractor will execute a Letter of Intent (LOI).
• Warning – If this Contractor or other separate contractors fail to perform there may be legal costs associated with
enforcing the Contract terms. These costs are at the parish’s expense.
Archdiocese of Atlanta
Office of Planning and Research

6

Step 6

Step 6 – Final Design
Third, using the final design, finalize the cost of the project

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

Large Capital Process – Steps 5, 6 and 7

For the DESIGN-BUILD Approach:
•The Design/Build Entity will finalize and present the cost of the project

For the DESIGN-BID-BUILD Approach:
•The Contractor will work within the terms of the LOI through the remaining design phase providing the construction
cost data until the design is completed and within budget.
•The Architect and the Contractor will work together to agree on the final cost of the project

Archdiocese of Atlanta
Office of Planning and Research

7

Step 7

Step 7 – Request Final Approval to Begin Construction

Large Capital Process – Steps 5, 6 and 7

The seventh step is a formal request to the Archbishop for
approval to begin construction

• Cover letter from pastor
• Financial application form
Final Approval Cover Letter
Key points to include:
1. Formal request for permission to
begin construction
2. Updated cost estimate and
planned start date
3. Overview of financing plan

The final action to be taken prior to commencing construction is to request permission from the Archbishop to begin
construction. Prior to this request, all of the actions required under steps 1 through 6 should be completed.
The pastor will request final approval to begin construction by sending a letter to the Archbishop requesting his permission to
begin construction. The letter should contain the following information:
• The nature and total cost of the project
• Date construction is to begin
• The funding sources for the project
In addition, the letter should also contain an updated copy of the Financial Application. This form summarizes the financial
impact of the project and is presented to the Project Review Committee of the Archdiocesan Finance Council for its review
and recommendation to the Archbishop for final approval of any loan requested for the project.

Archdiocese of Atlanta
Office of Planning and Research

8

Overview of Large Capital Project Process

Step 2

Large Capital Process – Steps 5, 6 and 7

Step 1

Define and Review Project

• Review letter and forms
• Grant initial conceptual approval to
engage design professionals and/or a
capital campaign consultant

Request First Approval:
Initial Conceptual Approval

Step 3

Step 4

• CCSI to present Preliminary Drawings
to the Archbishop

Develop Preliminary Design

Request Second Approval:
Approval for Capital Campaign and
Detailed Drawings

Step 5

• Review letter and forms
• Grant approval to:
• Kick-off capital campaign
• Obtain detailed drawings and
cost estimate

Step 7

Secure Financing

• Review letter and forms
• Grant approval to begin construction

Request Final Approval:
Build Approval

Step 6

Finalize Design

Step 8

Step 9
Archdiocese of Atlanta
Office of Planning and Research

Construction Management
Acceptance and Dedication

Large Capital Process – Steps 5, 6 and 7

Who Do You Call?

• Peter Faletti, Director of Planning and Facilities
• Work phone
o
(680):
404-885-7279
o
(Lake Park): 404-920-7855
• Cell phone:
404-915-3785
• Email:
[email protected]
• Jenny Scheb, Planning Analyst
• Work phone:
o
(680):
404-885-7410
o
(Lake Park): 404-920-7852
• Email:
[email protected]
• http://www.archatl.com/offices/construction/
Archdiocese of Atlanta
Office of Planning and Research

10


Slide 10

Large Capital Process – Steps 5, 6 and 7

Archdiocese of Atlanta
Large Capital Process

Step 5: Secure Financing
Step 6: Finalize Design
Step 7: Request Final Approval

Archdiocese of Atlanta
Office of Planning and Research

Step 5

Step 5 – Secure Financing
First, launch the capital campaign planned during Step 3

• Launch capital campaign
• Discuss loan requirements with
Finance

Large Capital Process – Steps 5, 6 and 7

Click for a helpful guide to running a
Capital Campaign.
Contact Steve Siler, Executive Director of
Stewardship for assistance with your
campaign.

Most major capital projects will require a capital campaign to raise the money needed to fund the project. These
campaigns typically involve the following :
What you need to begin:
• Case Statement Worthy of Support
• Defined Group of Constituents
• Solid Leadership
• Plan of Action
What you need to proceed:
Phase I:
Planning or Feasibility Study
Organization
Communications
Phase II:
Advanced Gifts Solicitation
Worker Recruitment
Execution Phase
Phase III:
The Campaign
General Phase
Phase IV:
Follow-up

Archdiocese of Atlanta
Office of Planning and Research

What you need to succeed:
A commitment to follow through on
a plan.
2

Step 5

Step 5 – Secure Financing

Large Capital Process – Steps 5, 6 and 7

Second, discuss loan requirements with Finance

• Launch capital campaign
• Discuss loan requirements with
Finance

Overview:
In the best case, the parish or school raises the funds required to complete the project prior to construction. In other cases,
not all the funds required for the project have been raised prior to construction, and a loan is needed. The loan approval
process is in place to evaluate the risk a parish or school will struggle to repay the loan. In evaluating the ability of the parish
or school to repay a loan, we consider the sources of funds pledged for repayment. Generally, the two sources of funds used
for repayment of loans are those funds generated from:
1. Annual Cash Flow - offertory/tuition is greater than expenses
2. Capital Campaigns
Loans based on Cash Flow:
Parishes (and schools) which have positive annual operating cash flow can use those funds as collateral for a loan. For
instance, if a parish has a history of, and is projected to have, positive cash flow of $100,000 per year for the next 5 years, then
having a $500,000 loan approved is not difficult. Likewise, a parish that has a history of breaking even would not be a
candidate for a loan based on future cash flows from operations.
Loans based on Capital Campaign:
Parishes (and schools) can qualify for a loan based on funds anticipated from a Capital Campaign. The unpaid pledges act as
the collateral for the loan. For instance, if a parish has a Capital Campaign which has unpaid pledges of $1,000,000, it can
request a loan of roughly $900,000. We do discount the unpaid pledges based on overall history and sometimes specific
history of pledge fulfillment.
Term of Loans
The term of the loan should be short as to not interfere with the financial needs of the parish or school in the future.
The term for a loan based on cash flow should be 10 year or less. The term can be extended up to 15 years if a school is
adjacent to the parish. The term of a loan based on a Capital Campaign should coincide with the length of the Capital
Campaign, generally 3 years.

Archdiocese of Atlanta
Office of Planning and Research

3

Step 5 – Secure Financing
Second, discuss loan requirements with Finance

Step 5

• Launch capital campaign
• Discuss loan requirements with
Finance

Large Capital Process – Steps 5, 6 and 7

Minimum Cash Requirement:
At a minimum, one-third of the total cost of the project must be in cash prior to the start of the project. While this implies that
two-thirds of a project can be financed, the wise pastor or school principal will use caution when borrowing funds.
Financial Application
The Financial Application is required for all capital projects. This document is used to capture the recent financial history of the
parish or school and to forecast the financial results into the future. The forecast is used to determine the financial risk of a
project.
Multi-Phase Projects:
A Master Plan may have multiple projects spread over many years. The establishment of a new parish is a good example of a
multi-phase project. For example, the new parish would need to acquire land, then build a worship space, and later build
classrooms, build or purchase a rectory, etc. Multi-phase projects require additional financial diligence to minimize risks. For
instance, we may require a financial application that extends 10 or 15 years to ensure that all parties have a common
understanding of the timetable for full completion.
Final Approval
The Project Review Committee of the Finance Council recommends loans for approval to the Archbishop of the Archdiocese of
Atlanta. All loans are approved by the Archbishop or by the Administrator

Archdiocese of Atlanta
Office of Planning and Research

4

Step 6

Step 6 – Final Design

Large Capital Process – Steps 5, 6 and 7

First, develop the detailed engineering and construction
drawings needed to finalize the design and cost of the project

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

Depending upon the level of success of the capital campaign, the Project design may remain unchanged, reduce in
scope, be enhanced in scope or abandoned.
If the project moves forward, the next major step is the development of the detailed engineering and construction
drawings needed to finalize the design and cost of the project. These services are included in the second phase of the
contract signed by the architect or design/build entity during Step 3 of the Large Capital Project process.
For the DESIGN-BUILD Approach:
•The Design/Build Entity will finalize the design
•Go to Slide 7- Obtain final cost
For the DESIGN-BID-BUILD Approach:
•The Architect will begin developing the detailed engineering and construction drawings needed
•The Architect will prepare to work with the selected contractor to finalize the design
•Go to Slide 6- Select contractor (if needed)

Archdiocese of Atlanta
Office of Planning and Research

5

Step 6

Step 6 – Final Design

Large Capital Process – Steps 5, 6 and 7

Second, select the Construction entity – if needed
(for Design-Bid-Build approach)

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

If the model of construction requires separate design and construction teams (i.e. in the Design – Bid – Build model), the
Building Committee will need to select Constructions Professionals using a similar process for selecting Design Professionals.
CCSI will help the parish identify and qualify 3-4 Construction entities and create RFPs. The Building Committee will then
receive bids under the guidance of CCSI and choose their team:
A) Identify potential Contractors
• The Building Committee (BC) should have a list of at least 3 qualified contractors they wish to solicit proposals from
• The contractor must be capable of acquiring a Payment & Performance Bond to qualify
• CCSI can supply a list of construction firms with references from other parishes that used these firms
B) Issue the Request for Proposal (RFP) for project contractors to bid on
• CCSI will issue an established customized Request for Proposal (RFP) to the short list of construction firms. This RFP
will include a complete breakdown of the construction costs for the Project prepared by CCSI for this particular
Project.
• The contractor responses to the RFP will provide the Building Committee with a “free look” from independent sources
of what the hard construction budget should be in the current “market place” and provide a check on the preliminary
hard construction budget provided by CCSI.
C) Select the contractor
• CCSI will summarize the RFP responses from the candidates in a spreadsheet for ease of reference.
• It is important to remember that the competing contractor candidates are competing on the basis of incomplete
plans. However certain portions of the proposals will be fixed.
• Based on BC feedback, CCSI will arrange to have all or some of the architectural firms or design/build entities make oral
presentations so that the BC may choose a contractor.
• Upon selection of the Contractor by the Parish, the Owner and the Contractor will execute a Letter of Intent (LOI).
• Warning – If this Contractor or other separate contractors fail to perform there may be legal costs associated with
enforcing the Contract terms. These costs are at the parish’s expense.
Archdiocese of Atlanta
Office of Planning and Research

6

Step 6

Step 6 – Final Design
Third, using the final design, finalize the cost of the project

• Develop construction drawings
• Select contractor (if needed)
• Obtain final cost

Large Capital Process – Steps 5, 6 and 7

For the DESIGN-BUILD Approach:
•The Design/Build Entity will finalize and present the cost of the project

For the DESIGN-BID-BUILD Approach:
•The Contractor will work within the terms of the LOI through the remaining design phase providing the construction
cost data until the design is completed and within budget.
•The Architect and the Contractor will work together to agree on the final cost of the project

Archdiocese of Atlanta
Office of Planning and Research

7

Step 7

Step 7 – Request Final Approval to Begin Construction

Large Capital Process – Steps 5, 6 and 7

The seventh step is a formal request to the Archbishop for
approval to begin construction

• Cover letter from pastor
• Financial application form
Final Approval Cover Letter
Key points to include:
1. Formal request for permission to
begin construction
2. Updated cost estimate and
planned start date
3. Overview of financing plan

The final action to be taken prior to commencing construction is to request permission from the Archbishop to begin
construction. Prior to this request, all of the actions required under steps 1 through 6 should be completed.
The pastor will request final approval to begin construction by sending a letter to the Archbishop requesting his permission to
begin construction. The letter should contain the following information:
• The nature and total cost of the project
• Date construction is to begin
• The funding sources for the project
In addition, the letter should also contain an updated copy of the Financial Application. This form summarizes the financial
impact of the project and is presented to the Project Review Committee of the Archdiocesan Finance Council for its review
and recommendation to the Archbishop for final approval of any loan requested for the project.

Archdiocese of Atlanta
Office of Planning and Research

8

Overview of Large Capital Project Process

Step 2

Large Capital Process – Steps 5, 6 and 7

Step 1

Define and Review Project

• Review letter and forms
• Grant initial conceptual approval to
engage design professionals and/or a
capital campaign consultant

Request First Approval:
Initial Conceptual Approval

Step 3

Step 4

• CCSI to present Preliminary Drawings
to the Archbishop

Develop Preliminary Design

Request Second Approval:
Approval for Capital Campaign and
Detailed Drawings

Step 5

• Review letter and forms
• Grant approval to:
• Kick-off capital campaign
• Obtain detailed drawings and
cost estimate

Step 7

Secure Financing

• Review letter and forms
• Grant approval to begin construction

Request Final Approval:
Build Approval

Step 6

Finalize Design

Step 8

Step 9
Archdiocese of Atlanta
Office of Planning and Research

Construction Management
Acceptance and Dedication

Large Capital Process – Steps 5, 6 and 7

Who Do You Call?

• Peter Faletti, Director of Planning and Facilities
• Work phone
o
(680):
404-885-7279
o
(Lake Park): 404-920-7855
• Cell phone:
404-915-3785
• Email:
[email protected]
• Jenny Scheb, Planning Analyst
• Work phone:
o
(680):
404-885-7410
o
(Lake Park): 404-920-7852
• Email:
[email protected]
• http://www.archatl.com/offices/construction/
Archdiocese of Atlanta
Office of Planning and Research

10