Transcript Table - Round Table Österreich
Slide 1
“Have U Heard” Round Table
Colombo Round Table 1
RT Austria AGM
Vienna
for
Kids in Need
Thank You for Hearing Us Austria !!
Table
Table
1
26
2
28
4
29
6
31
11
33
12
34
15
37
17
39
18
41
19
42
25
48
Your Support Made us come close to Their Dream ………………….
November 2009
The World Is Hearing us Today
Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/
Shaping Up
Expenses Incurred Thus far
Currency in Euros
Land Cost
25,100
Earth Filling
1,000
Building Temporary Pre-School
1,657
Building the Retention wall
3,052
Construction up to ground floor
4,193
Concrete slab (roof level of ground floor)
*12,916
* Includes Funds form RTA and RTI
--------------Excluding the land cost
47,918
=========
They also incur a monthly overhead cost of Approximately - Euro 322
Projected Expenses in Need
Currency in Euros
Concrete slab upwards (First Floor)
◦
◦
◦
◦
◦
Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating
◦ 5% cost escalation
* As per the BOQ Provided
22,874
1,897
2,580
1,470
1,554
2,165
--------------32,577
========
Equipment for the Audiology Center
Currency in Euros
Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation
4,232
6,432
4,614
4,437
985
--------------20,700
========
With the proposed center there will also be an monthly overhead of
approximately Euro 350
What Round Table can do ?
Fund 53,000 Euros
1. Audiology laboratory Auditorium
32,577
(Euro)
2. A well equipped Audiology lab :
20,700
(Euro)
To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel
Thank you !
Slide 2
“Have U Heard” Round Table
Colombo Round Table 1
RT Austria AGM
Vienna
for
Kids in Need
Thank You for Hearing Us Austria !!
Table
Table
1
26
2
28
4
29
6
31
11
33
12
34
15
37
17
39
18
41
19
42
25
48
Your Support Made us come close to Their Dream ………………….
November 2009
The World Is Hearing us Today
Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/
Shaping Up
Expenses Incurred Thus far
Currency in Euros
Land Cost
25,100
Earth Filling
1,000
Building Temporary Pre-School
1,657
Building the Retention wall
3,052
Construction up to ground floor
4,193
Concrete slab (roof level of ground floor)
*12,916
* Includes Funds form RTA and RTI
--------------Excluding the land cost
47,918
=========
They also incur a monthly overhead cost of Approximately - Euro 322
Projected Expenses in Need
Currency in Euros
Concrete slab upwards (First Floor)
◦
◦
◦
◦
◦
Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating
◦ 5% cost escalation
* As per the BOQ Provided
22,874
1,897
2,580
1,470
1,554
2,165
--------------32,577
========
Equipment for the Audiology Center
Currency in Euros
Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation
4,232
6,432
4,614
4,437
985
--------------20,700
========
With the proposed center there will also be an monthly overhead of
approximately Euro 350
What Round Table can do ?
Fund 53,000 Euros
1. Audiology laboratory Auditorium
32,577
(Euro)
2. A well equipped Audiology lab :
20,700
(Euro)
To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel
Thank you !
Slide 3
“Have U Heard” Round Table
Colombo Round Table 1
RT Austria AGM
Vienna
for
Kids in Need
Thank You for Hearing Us Austria !!
Table
Table
1
26
2
28
4
29
6
31
11
33
12
34
15
37
17
39
18
41
19
42
25
48
Your Support Made us come close to Their Dream ………………….
November 2009
The World Is Hearing us Today
Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/
Shaping Up
Expenses Incurred Thus far
Currency in Euros
Land Cost
25,100
Earth Filling
1,000
Building Temporary Pre-School
1,657
Building the Retention wall
3,052
Construction up to ground floor
4,193
Concrete slab (roof level of ground floor)
*12,916
* Includes Funds form RTA and RTI
--------------Excluding the land cost
47,918
=========
They also incur a monthly overhead cost of Approximately - Euro 322
Projected Expenses in Need
Currency in Euros
Concrete slab upwards (First Floor)
◦
◦
◦
◦
◦
Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating
◦ 5% cost escalation
* As per the BOQ Provided
22,874
1,897
2,580
1,470
1,554
2,165
--------------32,577
========
Equipment for the Audiology Center
Currency in Euros
Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation
4,232
6,432
4,614
4,437
985
--------------20,700
========
With the proposed center there will also be an monthly overhead of
approximately Euro 350
What Round Table can do ?
Fund 53,000 Euros
1. Audiology laboratory Auditorium
32,577
(Euro)
2. A well equipped Audiology lab :
20,700
(Euro)
To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel
Thank you !
Slide 4
“Have U Heard” Round Table
Colombo Round Table 1
RT Austria AGM
Vienna
for
Kids in Need
Thank You for Hearing Us Austria !!
Table
Table
1
26
2
28
4
29
6
31
11
33
12
34
15
37
17
39
18
41
19
42
25
48
Your Support Made us come close to Their Dream ………………….
November 2009
The World Is Hearing us Today
Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/
Shaping Up
Expenses Incurred Thus far
Currency in Euros
Land Cost
25,100
Earth Filling
1,000
Building Temporary Pre-School
1,657
Building the Retention wall
3,052
Construction up to ground floor
4,193
Concrete slab (roof level of ground floor)
*12,916
* Includes Funds form RTA and RTI
--------------Excluding the land cost
47,918
=========
They also incur a monthly overhead cost of Approximately - Euro 322
Projected Expenses in Need
Currency in Euros
Concrete slab upwards (First Floor)
◦
◦
◦
◦
◦
Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating
◦ 5% cost escalation
* As per the BOQ Provided
22,874
1,897
2,580
1,470
1,554
2,165
--------------32,577
========
Equipment for the Audiology Center
Currency in Euros
Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation
4,232
6,432
4,614
4,437
985
--------------20,700
========
With the proposed center there will also be an monthly overhead of
approximately Euro 350
What Round Table can do ?
Fund 53,000 Euros
1. Audiology laboratory Auditorium
32,577
(Euro)
2. A well equipped Audiology lab :
20,700
(Euro)
To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel
Thank you !
Slide 5
“Have U Heard” Round Table
Colombo Round Table 1
RT Austria AGM
Vienna
for
Kids in Need
Thank You for Hearing Us Austria !!
Table
Table
1
26
2
28
4
29
6
31
11
33
12
34
15
37
17
39
18
41
19
42
25
48
Your Support Made us come close to Their Dream ………………….
November 2009
The World Is Hearing us Today
Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/
Shaping Up
Expenses Incurred Thus far
Currency in Euros
Land Cost
25,100
Earth Filling
1,000
Building Temporary Pre-School
1,657
Building the Retention wall
3,052
Construction up to ground floor
4,193
Concrete slab (roof level of ground floor)
*12,916
* Includes Funds form RTA and RTI
--------------Excluding the land cost
47,918
=========
They also incur a monthly overhead cost of Approximately - Euro 322
Projected Expenses in Need
Currency in Euros
Concrete slab upwards (First Floor)
◦
◦
◦
◦
◦
Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating
◦ 5% cost escalation
* As per the BOQ Provided
22,874
1,897
2,580
1,470
1,554
2,165
--------------32,577
========
Equipment for the Audiology Center
Currency in Euros
Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation
4,232
6,432
4,614
4,437
985
--------------20,700
========
With the proposed center there will also be an monthly overhead of
approximately Euro 350
What Round Table can do ?
Fund 53,000 Euros
1. Audiology laboratory Auditorium
32,577
(Euro)
2. A well equipped Audiology lab :
20,700
(Euro)
To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel
Thank you !
Slide 6
“Have U Heard” Round Table
Colombo Round Table 1
RT Austria AGM
Vienna
for
Kids in Need
Thank You for Hearing Us Austria !!
Table
Table
1
26
2
28
4
29
6
31
11
33
12
34
15
37
17
39
18
41
19
42
25
48
Your Support Made us come close to Their Dream ………………….
November 2009
The World Is Hearing us Today
Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/
Shaping Up
Expenses Incurred Thus far
Currency in Euros
Land Cost
25,100
Earth Filling
1,000
Building Temporary Pre-School
1,657
Building the Retention wall
3,052
Construction up to ground floor
4,193
Concrete slab (roof level of ground floor)
*12,916
* Includes Funds form RTA and RTI
--------------Excluding the land cost
47,918
=========
They also incur a monthly overhead cost of Approximately - Euro 322
Projected Expenses in Need
Currency in Euros
Concrete slab upwards (First Floor)
◦
◦
◦
◦
◦
Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating
◦ 5% cost escalation
* As per the BOQ Provided
22,874
1,897
2,580
1,470
1,554
2,165
--------------32,577
========
Equipment for the Audiology Center
Currency in Euros
Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation
4,232
6,432
4,614
4,437
985
--------------20,700
========
With the proposed center there will also be an monthly overhead of
approximately Euro 350
What Round Table can do ?
Fund 53,000 Euros
1. Audiology laboratory Auditorium
32,577
(Euro)
2. A well equipped Audiology lab :
20,700
(Euro)
To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel
Thank you !
Slide 7
“Have U Heard” Round Table
Colombo Round Table 1
RT Austria AGM
Vienna
for
Kids in Need
Thank You for Hearing Us Austria !!
Table
Table
1
26
2
28
4
29
6
31
11
33
12
34
15
37
17
39
18
41
19
42
25
48
Your Support Made us come close to Their Dream ………………….
November 2009
The World Is Hearing us Today
Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/
Shaping Up
Expenses Incurred Thus far
Currency in Euros
Land Cost
25,100
Earth Filling
1,000
Building Temporary Pre-School
1,657
Building the Retention wall
3,052
Construction up to ground floor
4,193
Concrete slab (roof level of ground floor)
*12,916
* Includes Funds form RTA and RTI
--------------Excluding the land cost
47,918
=========
They also incur a monthly overhead cost of Approximately - Euro 322
Projected Expenses in Need
Currency in Euros
Concrete slab upwards (First Floor)
◦
◦
◦
◦
◦
Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating
◦ 5% cost escalation
* As per the BOQ Provided
22,874
1,897
2,580
1,470
1,554
2,165
--------------32,577
========
Equipment for the Audiology Center
Currency in Euros
Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation
4,232
6,432
4,614
4,437
985
--------------20,700
========
With the proposed center there will also be an monthly overhead of
approximately Euro 350
What Round Table can do ?
Fund 53,000 Euros
1. Audiology laboratory Auditorium
32,577
(Euro)
2. A well equipped Audiology lab :
20,700
(Euro)
To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel
Thank you !
Slide 8
“Have U Heard” Round Table
Colombo Round Table 1
RT Austria AGM
Vienna
for
Kids in Need
Thank You for Hearing Us Austria !!
Table
Table
1
26
2
28
4
29
6
31
11
33
12
34
15
37
17
39
18
41
19
42
25
48
Your Support Made us come close to Their Dream ………………….
November 2009
The World Is Hearing us Today
Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/
Shaping Up
Expenses Incurred Thus far
Currency in Euros
Land Cost
25,100
Earth Filling
1,000
Building Temporary Pre-School
1,657
Building the Retention wall
3,052
Construction up to ground floor
4,193
Concrete slab (roof level of ground floor)
*12,916
* Includes Funds form RTA and RTI
--------------Excluding the land cost
47,918
=========
They also incur a monthly overhead cost of Approximately - Euro 322
Projected Expenses in Need
Currency in Euros
Concrete slab upwards (First Floor)
◦
◦
◦
◦
◦
Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating
◦ 5% cost escalation
* As per the BOQ Provided
22,874
1,897
2,580
1,470
1,554
2,165
--------------32,577
========
Equipment for the Audiology Center
Currency in Euros
Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation
4,232
6,432
4,614
4,437
985
--------------20,700
========
With the proposed center there will also be an monthly overhead of
approximately Euro 350
What Round Table can do ?
Fund 53,000 Euros
1. Audiology laboratory Auditorium
32,577
(Euro)
2. A well equipped Audiology lab :
20,700
(Euro)
To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel
Thank you !
Slide 9
“Have U Heard” Round Table
Colombo Round Table 1
RT Austria AGM
Vienna
for
Kids in Need
Thank You for Hearing Us Austria !!
Table
Table
1
26
2
28
4
29
6
31
11
33
12
34
15
37
17
39
18
41
19
42
25
48
Your Support Made us come close to Their Dream ………………….
November 2009
The World Is Hearing us Today
Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/
Shaping Up
Expenses Incurred Thus far
Currency in Euros
Land Cost
25,100
Earth Filling
1,000
Building Temporary Pre-School
1,657
Building the Retention wall
3,052
Construction up to ground floor
4,193
Concrete slab (roof level of ground floor)
*12,916
* Includes Funds form RTA and RTI
--------------Excluding the land cost
47,918
=========
They also incur a monthly overhead cost of Approximately - Euro 322
Projected Expenses in Need
Currency in Euros
Concrete slab upwards (First Floor)
◦
◦
◦
◦
◦
Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating
◦ 5% cost escalation
* As per the BOQ Provided
22,874
1,897
2,580
1,470
1,554
2,165
--------------32,577
========
Equipment for the Audiology Center
Currency in Euros
Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation
4,232
6,432
4,614
4,437
985
--------------20,700
========
With the proposed center there will also be an monthly overhead of
approximately Euro 350
What Round Table can do ?
Fund 53,000 Euros
1. Audiology laboratory Auditorium
32,577
(Euro)
2. A well equipped Audiology lab :
20,700
(Euro)
To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel
Thank you !
Slide 10
“Have U Heard” Round Table
Colombo Round Table 1
RT Austria AGM
Vienna
for
Kids in Need
Thank You for Hearing Us Austria !!
Table
Table
1
26
2
28
4
29
6
31
11
33
12
34
15
37
17
39
18
41
19
42
25
48
Your Support Made us come close to Their Dream ………………….
November 2009
The World Is Hearing us Today
Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/
Shaping Up
Expenses Incurred Thus far
Currency in Euros
Land Cost
25,100
Earth Filling
1,000
Building Temporary Pre-School
1,657
Building the Retention wall
3,052
Construction up to ground floor
4,193
Concrete slab (roof level of ground floor)
*12,916
* Includes Funds form RTA and RTI
--------------Excluding the land cost
47,918
=========
They also incur a monthly overhead cost of Approximately - Euro 322
Projected Expenses in Need
Currency in Euros
Concrete slab upwards (First Floor)
◦
◦
◦
◦
◦
Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating
◦ 5% cost escalation
* As per the BOQ Provided
22,874
1,897
2,580
1,470
1,554
2,165
--------------32,577
========
Equipment for the Audiology Center
Currency in Euros
Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation
4,232
6,432
4,614
4,437
985
--------------20,700
========
With the proposed center there will also be an monthly overhead of
approximately Euro 350
What Round Table can do ?
Fund 53,000 Euros
1. Audiology laboratory Auditorium
32,577
(Euro)
2. A well equipped Audiology lab :
20,700
(Euro)
To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel
Thank you !
Slide 11
“Have U Heard” Round Table
Colombo Round Table 1
RT Austria AGM
Vienna
for
Kids in Need
Thank You for Hearing Us Austria !!
Table
Table
1
26
2
28
4
29
6
31
11
33
12
34
15
37
17
39
18
41
19
42
25
48
Your Support Made us come close to Their Dream ………………….
November 2009
The World Is Hearing us Today
Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/
Shaping Up
Expenses Incurred Thus far
Currency in Euros
Land Cost
25,100
Earth Filling
1,000
Building Temporary Pre-School
1,657
Building the Retention wall
3,052
Construction up to ground floor
4,193
Concrete slab (roof level of ground floor)
*12,916
* Includes Funds form RTA and RTI
--------------Excluding the land cost
47,918
=========
They also incur a monthly overhead cost of Approximately - Euro 322
Projected Expenses in Need
Currency in Euros
Concrete slab upwards (First Floor)
◦
◦
◦
◦
◦
Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating
◦ 5% cost escalation
* As per the BOQ Provided
22,874
1,897
2,580
1,470
1,554
2,165
--------------32,577
========
Equipment for the Audiology Center
Currency in Euros
Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation
4,232
6,432
4,614
4,437
985
--------------20,700
========
With the proposed center there will also be an monthly overhead of
approximately Euro 350
What Round Table can do ?
Fund 53,000 Euros
1. Audiology laboratory Auditorium
32,577
(Euro)
2. A well equipped Audiology lab :
20,700
(Euro)
To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel
Thank you !
“Have U Heard” Round Table
Colombo Round Table 1
RT Austria AGM
Vienna
for
Kids in Need
Thank You for Hearing Us Austria !!
Table
Table
1
26
2
28
4
29
6
31
11
33
12
34
15
37
17
39
18
41
19
42
25
48
Your Support Made us come close to Their Dream ………………….
November 2009
The World Is Hearing us Today
Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/
Shaping Up
Expenses Incurred Thus far
Currency in Euros
Land Cost
25,100
Earth Filling
1,000
Building Temporary Pre-School
1,657
Building the Retention wall
3,052
Construction up to ground floor
4,193
Concrete slab (roof level of ground floor)
*12,916
* Includes Funds form RTA and RTI
--------------Excluding the land cost
47,918
=========
They also incur a monthly overhead cost of Approximately - Euro 322
Projected Expenses in Need
Currency in Euros
Concrete slab upwards (First Floor)
◦
◦
◦
◦
◦
Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating
◦ 5% cost escalation
* As per the BOQ Provided
22,874
1,897
2,580
1,470
1,554
2,165
--------------32,577
========
Equipment for the Audiology Center
Currency in Euros
Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation
4,232
6,432
4,614
4,437
985
--------------20,700
========
With the proposed center there will also be an monthly overhead of
approximately Euro 350
What Round Table can do ?
Fund 53,000 Euros
1. Audiology laboratory Auditorium
32,577
(Euro)
2. A well equipped Audiology lab :
20,700
(Euro)
To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel
Thank you !
Slide 2
“Have U Heard” Round Table
Colombo Round Table 1
RT Austria AGM
Vienna
for
Kids in Need
Thank You for Hearing Us Austria !!
Table
Table
1
26
2
28
4
29
6
31
11
33
12
34
15
37
17
39
18
41
19
42
25
48
Your Support Made us come close to Their Dream ………………….
November 2009
The World Is Hearing us Today
Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/
Shaping Up
Expenses Incurred Thus far
Currency in Euros
Land Cost
25,100
Earth Filling
1,000
Building Temporary Pre-School
1,657
Building the Retention wall
3,052
Construction up to ground floor
4,193
Concrete slab (roof level of ground floor)
*12,916
* Includes Funds form RTA and RTI
--------------Excluding the land cost
47,918
=========
They also incur a monthly overhead cost of Approximately - Euro 322
Projected Expenses in Need
Currency in Euros
Concrete slab upwards (First Floor)
◦
◦
◦
◦
◦
Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating
◦ 5% cost escalation
* As per the BOQ Provided
22,874
1,897
2,580
1,470
1,554
2,165
--------------32,577
========
Equipment for the Audiology Center
Currency in Euros
Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation
4,232
6,432
4,614
4,437
985
--------------20,700
========
With the proposed center there will also be an monthly overhead of
approximately Euro 350
What Round Table can do ?
Fund 53,000 Euros
1. Audiology laboratory Auditorium
32,577
(Euro)
2. A well equipped Audiology lab :
20,700
(Euro)
To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel
Thank you !
Slide 3
“Have U Heard” Round Table
Colombo Round Table 1
RT Austria AGM
Vienna
for
Kids in Need
Thank You for Hearing Us Austria !!
Table
Table
1
26
2
28
4
29
6
31
11
33
12
34
15
37
17
39
18
41
19
42
25
48
Your Support Made us come close to Their Dream ………………….
November 2009
The World Is Hearing us Today
Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/
Shaping Up
Expenses Incurred Thus far
Currency in Euros
Land Cost
25,100
Earth Filling
1,000
Building Temporary Pre-School
1,657
Building the Retention wall
3,052
Construction up to ground floor
4,193
Concrete slab (roof level of ground floor)
*12,916
* Includes Funds form RTA and RTI
--------------Excluding the land cost
47,918
=========
They also incur a monthly overhead cost of Approximately - Euro 322
Projected Expenses in Need
Currency in Euros
Concrete slab upwards (First Floor)
◦
◦
◦
◦
◦
Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating
◦ 5% cost escalation
* As per the BOQ Provided
22,874
1,897
2,580
1,470
1,554
2,165
--------------32,577
========
Equipment for the Audiology Center
Currency in Euros
Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation
4,232
6,432
4,614
4,437
985
--------------20,700
========
With the proposed center there will also be an monthly overhead of
approximately Euro 350
What Round Table can do ?
Fund 53,000 Euros
1. Audiology laboratory Auditorium
32,577
(Euro)
2. A well equipped Audiology lab :
20,700
(Euro)
To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel
Thank you !
Slide 4
“Have U Heard” Round Table
Colombo Round Table 1
RT Austria AGM
Vienna
for
Kids in Need
Thank You for Hearing Us Austria !!
Table
Table
1
26
2
28
4
29
6
31
11
33
12
34
15
37
17
39
18
41
19
42
25
48
Your Support Made us come close to Their Dream ………………….
November 2009
The World Is Hearing us Today
Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/
Shaping Up
Expenses Incurred Thus far
Currency in Euros
Land Cost
25,100
Earth Filling
1,000
Building Temporary Pre-School
1,657
Building the Retention wall
3,052
Construction up to ground floor
4,193
Concrete slab (roof level of ground floor)
*12,916
* Includes Funds form RTA and RTI
--------------Excluding the land cost
47,918
=========
They also incur a monthly overhead cost of Approximately - Euro 322
Projected Expenses in Need
Currency in Euros
Concrete slab upwards (First Floor)
◦
◦
◦
◦
◦
Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating
◦ 5% cost escalation
* As per the BOQ Provided
22,874
1,897
2,580
1,470
1,554
2,165
--------------32,577
========
Equipment for the Audiology Center
Currency in Euros
Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation
4,232
6,432
4,614
4,437
985
--------------20,700
========
With the proposed center there will also be an monthly overhead of
approximately Euro 350
What Round Table can do ?
Fund 53,000 Euros
1. Audiology laboratory Auditorium
32,577
(Euro)
2. A well equipped Audiology lab :
20,700
(Euro)
To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel
Thank you !
Slide 5
“Have U Heard” Round Table
Colombo Round Table 1
RT Austria AGM
Vienna
for
Kids in Need
Thank You for Hearing Us Austria !!
Table
Table
1
26
2
28
4
29
6
31
11
33
12
34
15
37
17
39
18
41
19
42
25
48
Your Support Made us come close to Their Dream ………………….
November 2009
The World Is Hearing us Today
Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/
Shaping Up
Expenses Incurred Thus far
Currency in Euros
Land Cost
25,100
Earth Filling
1,000
Building Temporary Pre-School
1,657
Building the Retention wall
3,052
Construction up to ground floor
4,193
Concrete slab (roof level of ground floor)
*12,916
* Includes Funds form RTA and RTI
--------------Excluding the land cost
47,918
=========
They also incur a monthly overhead cost of Approximately - Euro 322
Projected Expenses in Need
Currency in Euros
Concrete slab upwards (First Floor)
◦
◦
◦
◦
◦
Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating
◦ 5% cost escalation
* As per the BOQ Provided
22,874
1,897
2,580
1,470
1,554
2,165
--------------32,577
========
Equipment for the Audiology Center
Currency in Euros
Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation
4,232
6,432
4,614
4,437
985
--------------20,700
========
With the proposed center there will also be an monthly overhead of
approximately Euro 350
What Round Table can do ?
Fund 53,000 Euros
1. Audiology laboratory Auditorium
32,577
(Euro)
2. A well equipped Audiology lab :
20,700
(Euro)
To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel
Thank you !
Slide 6
“Have U Heard” Round Table
Colombo Round Table 1
RT Austria AGM
Vienna
for
Kids in Need
Thank You for Hearing Us Austria !!
Table
Table
1
26
2
28
4
29
6
31
11
33
12
34
15
37
17
39
18
41
19
42
25
48
Your Support Made us come close to Their Dream ………………….
November 2009
The World Is Hearing us Today
Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/
Shaping Up
Expenses Incurred Thus far
Currency in Euros
Land Cost
25,100
Earth Filling
1,000
Building Temporary Pre-School
1,657
Building the Retention wall
3,052
Construction up to ground floor
4,193
Concrete slab (roof level of ground floor)
*12,916
* Includes Funds form RTA and RTI
--------------Excluding the land cost
47,918
=========
They also incur a monthly overhead cost of Approximately - Euro 322
Projected Expenses in Need
Currency in Euros
Concrete slab upwards (First Floor)
◦
◦
◦
◦
◦
Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating
◦ 5% cost escalation
* As per the BOQ Provided
22,874
1,897
2,580
1,470
1,554
2,165
--------------32,577
========
Equipment for the Audiology Center
Currency in Euros
Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation
4,232
6,432
4,614
4,437
985
--------------20,700
========
With the proposed center there will also be an monthly overhead of
approximately Euro 350
What Round Table can do ?
Fund 53,000 Euros
1. Audiology laboratory Auditorium
32,577
(Euro)
2. A well equipped Audiology lab :
20,700
(Euro)
To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel
Thank you !
Slide 7
“Have U Heard” Round Table
Colombo Round Table 1
RT Austria AGM
Vienna
for
Kids in Need
Thank You for Hearing Us Austria !!
Table
Table
1
26
2
28
4
29
6
31
11
33
12
34
15
37
17
39
18
41
19
42
25
48
Your Support Made us come close to Their Dream ………………….
November 2009
The World Is Hearing us Today
Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/
Shaping Up
Expenses Incurred Thus far
Currency in Euros
Land Cost
25,100
Earth Filling
1,000
Building Temporary Pre-School
1,657
Building the Retention wall
3,052
Construction up to ground floor
4,193
Concrete slab (roof level of ground floor)
*12,916
* Includes Funds form RTA and RTI
--------------Excluding the land cost
47,918
=========
They also incur a monthly overhead cost of Approximately - Euro 322
Projected Expenses in Need
Currency in Euros
Concrete slab upwards (First Floor)
◦
◦
◦
◦
◦
Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating
◦ 5% cost escalation
* As per the BOQ Provided
22,874
1,897
2,580
1,470
1,554
2,165
--------------32,577
========
Equipment for the Audiology Center
Currency in Euros
Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation
4,232
6,432
4,614
4,437
985
--------------20,700
========
With the proposed center there will also be an monthly overhead of
approximately Euro 350
What Round Table can do ?
Fund 53,000 Euros
1. Audiology laboratory Auditorium
32,577
(Euro)
2. A well equipped Audiology lab :
20,700
(Euro)
To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel
Thank you !
Slide 8
“Have U Heard” Round Table
Colombo Round Table 1
RT Austria AGM
Vienna
for
Kids in Need
Thank You for Hearing Us Austria !!
Table
Table
1
26
2
28
4
29
6
31
11
33
12
34
15
37
17
39
18
41
19
42
25
48
Your Support Made us come close to Their Dream ………………….
November 2009
The World Is Hearing us Today
Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/
Shaping Up
Expenses Incurred Thus far
Currency in Euros
Land Cost
25,100
Earth Filling
1,000
Building Temporary Pre-School
1,657
Building the Retention wall
3,052
Construction up to ground floor
4,193
Concrete slab (roof level of ground floor)
*12,916
* Includes Funds form RTA and RTI
--------------Excluding the land cost
47,918
=========
They also incur a monthly overhead cost of Approximately - Euro 322
Projected Expenses in Need
Currency in Euros
Concrete slab upwards (First Floor)
◦
◦
◦
◦
◦
Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating
◦ 5% cost escalation
* As per the BOQ Provided
22,874
1,897
2,580
1,470
1,554
2,165
--------------32,577
========
Equipment for the Audiology Center
Currency in Euros
Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation
4,232
6,432
4,614
4,437
985
--------------20,700
========
With the proposed center there will also be an monthly overhead of
approximately Euro 350
What Round Table can do ?
Fund 53,000 Euros
1. Audiology laboratory Auditorium
32,577
(Euro)
2. A well equipped Audiology lab :
20,700
(Euro)
To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel
Thank you !
Slide 9
“Have U Heard” Round Table
Colombo Round Table 1
RT Austria AGM
Vienna
for
Kids in Need
Thank You for Hearing Us Austria !!
Table
Table
1
26
2
28
4
29
6
31
11
33
12
34
15
37
17
39
18
41
19
42
25
48
Your Support Made us come close to Their Dream ………………….
November 2009
The World Is Hearing us Today
Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/
Shaping Up
Expenses Incurred Thus far
Currency in Euros
Land Cost
25,100
Earth Filling
1,000
Building Temporary Pre-School
1,657
Building the Retention wall
3,052
Construction up to ground floor
4,193
Concrete slab (roof level of ground floor)
*12,916
* Includes Funds form RTA and RTI
--------------Excluding the land cost
47,918
=========
They also incur a monthly overhead cost of Approximately - Euro 322
Projected Expenses in Need
Currency in Euros
Concrete slab upwards (First Floor)
◦
◦
◦
◦
◦
Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating
◦ 5% cost escalation
* As per the BOQ Provided
22,874
1,897
2,580
1,470
1,554
2,165
--------------32,577
========
Equipment for the Audiology Center
Currency in Euros
Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation
4,232
6,432
4,614
4,437
985
--------------20,700
========
With the proposed center there will also be an monthly overhead of
approximately Euro 350
What Round Table can do ?
Fund 53,000 Euros
1. Audiology laboratory Auditorium
32,577
(Euro)
2. A well equipped Audiology lab :
20,700
(Euro)
To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel
Thank you !
Slide 10
“Have U Heard” Round Table
Colombo Round Table 1
RT Austria AGM
Vienna
for
Kids in Need
Thank You for Hearing Us Austria !!
Table
Table
1
26
2
28
4
29
6
31
11
33
12
34
15
37
17
39
18
41
19
42
25
48
Your Support Made us come close to Their Dream ………………….
November 2009
The World Is Hearing us Today
Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/
Shaping Up
Expenses Incurred Thus far
Currency in Euros
Land Cost
25,100
Earth Filling
1,000
Building Temporary Pre-School
1,657
Building the Retention wall
3,052
Construction up to ground floor
4,193
Concrete slab (roof level of ground floor)
*12,916
* Includes Funds form RTA and RTI
--------------Excluding the land cost
47,918
=========
They also incur a monthly overhead cost of Approximately - Euro 322
Projected Expenses in Need
Currency in Euros
Concrete slab upwards (First Floor)
◦
◦
◦
◦
◦
Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating
◦ 5% cost escalation
* As per the BOQ Provided
22,874
1,897
2,580
1,470
1,554
2,165
--------------32,577
========
Equipment for the Audiology Center
Currency in Euros
Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation
4,232
6,432
4,614
4,437
985
--------------20,700
========
With the proposed center there will also be an monthly overhead of
approximately Euro 350
What Round Table can do ?
Fund 53,000 Euros
1. Audiology laboratory Auditorium
32,577
(Euro)
2. A well equipped Audiology lab :
20,700
(Euro)
To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel
Thank you !
Slide 11
“Have U Heard” Round Table
Colombo Round Table 1
RT Austria AGM
Vienna
for
Kids in Need
Thank You for Hearing Us Austria !!
Table
Table
1
26
2
28
4
29
6
31
11
33
12
34
15
37
17
39
18
41
19
42
25
48
Your Support Made us come close to Their Dream ………………….
November 2009
The World Is Hearing us Today
Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/
Shaping Up
Expenses Incurred Thus far
Currency in Euros
Land Cost
25,100
Earth Filling
1,000
Building Temporary Pre-School
1,657
Building the Retention wall
3,052
Construction up to ground floor
4,193
Concrete slab (roof level of ground floor)
*12,916
* Includes Funds form RTA and RTI
--------------Excluding the land cost
47,918
=========
They also incur a monthly overhead cost of Approximately - Euro 322
Projected Expenses in Need
Currency in Euros
Concrete slab upwards (First Floor)
◦
◦
◦
◦
◦
Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating
◦ 5% cost escalation
* As per the BOQ Provided
22,874
1,897
2,580
1,470
1,554
2,165
--------------32,577
========
Equipment for the Audiology Center
Currency in Euros
Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation
4,232
6,432
4,614
4,437
985
--------------20,700
========
With the proposed center there will also be an monthly overhead of
approximately Euro 350
What Round Table can do ?
Fund 53,000 Euros
1. Audiology laboratory Auditorium
32,577
(Euro)
2. A well equipped Audiology lab :
20,700
(Euro)
To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel
Thank you !