Table - Round Table Österreich

Download Report

Transcript Table - Round Table Österreich

Slide 1

“Have U Heard” Round Table
Colombo Round Table 1

RT Austria AGM
Vienna

for

Kids in Need

Thank You for Hearing Us Austria !!
Table

Table

1

26

2

28

4

29

6

31

11

33

12

34

15

37

17

39

18

41

19

42

25

48

Your Support Made us come close to Their Dream ………………….

November 2009

The World Is Hearing us Today

Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/

Shaping Up

Expenses Incurred Thus far
Currency in Euros

Land Cost

25,100

Earth Filling

1,000

Building Temporary Pre-School

1,657

Building the Retention wall

3,052

Construction up to ground floor

4,193

Concrete slab (roof level of ground floor)

*12,916

* Includes Funds form RTA and RTI

--------------Excluding the land cost

47,918
=========

They also incur a monthly overhead cost of Approximately - Euro 322

Projected Expenses in Need
Currency in Euros




Concrete slab upwards (First Floor)






Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating

◦ 5% cost escalation

* As per the BOQ Provided

22,874
1,897
2,580
1,470

1,554
2,165
--------------32,577
========

Equipment for the Audiology Center
Currency in Euros







Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation

4,232
6,432
4,614
4,437
985
--------------20,700
========

With the proposed center there will also be an monthly overhead of
approximately Euro 350

What Round Table can do ?
Fund 53,000 Euros

1. Audiology laboratory Auditorium

32,577

(Euro)

2. A well equipped Audiology lab :

20,700

(Euro)

To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel

Thank you !


Slide 2

“Have U Heard” Round Table
Colombo Round Table 1

RT Austria AGM
Vienna

for

Kids in Need

Thank You for Hearing Us Austria !!
Table

Table

1

26

2

28

4

29

6

31

11

33

12

34

15

37

17

39

18

41

19

42

25

48

Your Support Made us come close to Their Dream ………………….

November 2009

The World Is Hearing us Today

Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/

Shaping Up

Expenses Incurred Thus far
Currency in Euros

Land Cost

25,100

Earth Filling

1,000

Building Temporary Pre-School

1,657

Building the Retention wall

3,052

Construction up to ground floor

4,193

Concrete slab (roof level of ground floor)

*12,916

* Includes Funds form RTA and RTI

--------------Excluding the land cost

47,918
=========

They also incur a monthly overhead cost of Approximately - Euro 322

Projected Expenses in Need
Currency in Euros




Concrete slab upwards (First Floor)






Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating

◦ 5% cost escalation

* As per the BOQ Provided

22,874
1,897
2,580
1,470

1,554
2,165
--------------32,577
========

Equipment for the Audiology Center
Currency in Euros







Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation

4,232
6,432
4,614
4,437
985
--------------20,700
========

With the proposed center there will also be an monthly overhead of
approximately Euro 350

What Round Table can do ?
Fund 53,000 Euros

1. Audiology laboratory Auditorium

32,577

(Euro)

2. A well equipped Audiology lab :

20,700

(Euro)

To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel

Thank you !


Slide 3

“Have U Heard” Round Table
Colombo Round Table 1

RT Austria AGM
Vienna

for

Kids in Need

Thank You for Hearing Us Austria !!
Table

Table

1

26

2

28

4

29

6

31

11

33

12

34

15

37

17

39

18

41

19

42

25

48

Your Support Made us come close to Their Dream ………………….

November 2009

The World Is Hearing us Today

Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/

Shaping Up

Expenses Incurred Thus far
Currency in Euros

Land Cost

25,100

Earth Filling

1,000

Building Temporary Pre-School

1,657

Building the Retention wall

3,052

Construction up to ground floor

4,193

Concrete slab (roof level of ground floor)

*12,916

* Includes Funds form RTA and RTI

--------------Excluding the land cost

47,918
=========

They also incur a monthly overhead cost of Approximately - Euro 322

Projected Expenses in Need
Currency in Euros




Concrete slab upwards (First Floor)






Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating

◦ 5% cost escalation

* As per the BOQ Provided

22,874
1,897
2,580
1,470

1,554
2,165
--------------32,577
========

Equipment for the Audiology Center
Currency in Euros







Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation

4,232
6,432
4,614
4,437
985
--------------20,700
========

With the proposed center there will also be an monthly overhead of
approximately Euro 350

What Round Table can do ?
Fund 53,000 Euros

1. Audiology laboratory Auditorium

32,577

(Euro)

2. A well equipped Audiology lab :

20,700

(Euro)

To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel

Thank you !


Slide 4

“Have U Heard” Round Table
Colombo Round Table 1

RT Austria AGM
Vienna

for

Kids in Need

Thank You for Hearing Us Austria !!
Table

Table

1

26

2

28

4

29

6

31

11

33

12

34

15

37

17

39

18

41

19

42

25

48

Your Support Made us come close to Their Dream ………………….

November 2009

The World Is Hearing us Today

Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/

Shaping Up

Expenses Incurred Thus far
Currency in Euros

Land Cost

25,100

Earth Filling

1,000

Building Temporary Pre-School

1,657

Building the Retention wall

3,052

Construction up to ground floor

4,193

Concrete slab (roof level of ground floor)

*12,916

* Includes Funds form RTA and RTI

--------------Excluding the land cost

47,918
=========

They also incur a monthly overhead cost of Approximately - Euro 322

Projected Expenses in Need
Currency in Euros




Concrete slab upwards (First Floor)






Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating

◦ 5% cost escalation

* As per the BOQ Provided

22,874
1,897
2,580
1,470

1,554
2,165
--------------32,577
========

Equipment for the Audiology Center
Currency in Euros







Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation

4,232
6,432
4,614
4,437
985
--------------20,700
========

With the proposed center there will also be an monthly overhead of
approximately Euro 350

What Round Table can do ?
Fund 53,000 Euros

1. Audiology laboratory Auditorium

32,577

(Euro)

2. A well equipped Audiology lab :

20,700

(Euro)

To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel

Thank you !


Slide 5

“Have U Heard” Round Table
Colombo Round Table 1

RT Austria AGM
Vienna

for

Kids in Need

Thank You for Hearing Us Austria !!
Table

Table

1

26

2

28

4

29

6

31

11

33

12

34

15

37

17

39

18

41

19

42

25

48

Your Support Made us come close to Their Dream ………………….

November 2009

The World Is Hearing us Today

Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/

Shaping Up

Expenses Incurred Thus far
Currency in Euros

Land Cost

25,100

Earth Filling

1,000

Building Temporary Pre-School

1,657

Building the Retention wall

3,052

Construction up to ground floor

4,193

Concrete slab (roof level of ground floor)

*12,916

* Includes Funds form RTA and RTI

--------------Excluding the land cost

47,918
=========

They also incur a monthly overhead cost of Approximately - Euro 322

Projected Expenses in Need
Currency in Euros




Concrete slab upwards (First Floor)






Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating

◦ 5% cost escalation

* As per the BOQ Provided

22,874
1,897
2,580
1,470

1,554
2,165
--------------32,577
========

Equipment for the Audiology Center
Currency in Euros







Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation

4,232
6,432
4,614
4,437
985
--------------20,700
========

With the proposed center there will also be an monthly overhead of
approximately Euro 350

What Round Table can do ?
Fund 53,000 Euros

1. Audiology laboratory Auditorium

32,577

(Euro)

2. A well equipped Audiology lab :

20,700

(Euro)

To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel

Thank you !


Slide 6

“Have U Heard” Round Table
Colombo Round Table 1

RT Austria AGM
Vienna

for

Kids in Need

Thank You for Hearing Us Austria !!
Table

Table

1

26

2

28

4

29

6

31

11

33

12

34

15

37

17

39

18

41

19

42

25

48

Your Support Made us come close to Their Dream ………………….

November 2009

The World Is Hearing us Today

Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/

Shaping Up

Expenses Incurred Thus far
Currency in Euros

Land Cost

25,100

Earth Filling

1,000

Building Temporary Pre-School

1,657

Building the Retention wall

3,052

Construction up to ground floor

4,193

Concrete slab (roof level of ground floor)

*12,916

* Includes Funds form RTA and RTI

--------------Excluding the land cost

47,918
=========

They also incur a monthly overhead cost of Approximately - Euro 322

Projected Expenses in Need
Currency in Euros




Concrete slab upwards (First Floor)






Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating

◦ 5% cost escalation

* As per the BOQ Provided

22,874
1,897
2,580
1,470

1,554
2,165
--------------32,577
========

Equipment for the Audiology Center
Currency in Euros







Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation

4,232
6,432
4,614
4,437
985
--------------20,700
========

With the proposed center there will also be an monthly overhead of
approximately Euro 350

What Round Table can do ?
Fund 53,000 Euros

1. Audiology laboratory Auditorium

32,577

(Euro)

2. A well equipped Audiology lab :

20,700

(Euro)

To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel

Thank you !


Slide 7

“Have U Heard” Round Table
Colombo Round Table 1

RT Austria AGM
Vienna

for

Kids in Need

Thank You for Hearing Us Austria !!
Table

Table

1

26

2

28

4

29

6

31

11

33

12

34

15

37

17

39

18

41

19

42

25

48

Your Support Made us come close to Their Dream ………………….

November 2009

The World Is Hearing us Today

Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/

Shaping Up

Expenses Incurred Thus far
Currency in Euros

Land Cost

25,100

Earth Filling

1,000

Building Temporary Pre-School

1,657

Building the Retention wall

3,052

Construction up to ground floor

4,193

Concrete slab (roof level of ground floor)

*12,916

* Includes Funds form RTA and RTI

--------------Excluding the land cost

47,918
=========

They also incur a monthly overhead cost of Approximately - Euro 322

Projected Expenses in Need
Currency in Euros




Concrete slab upwards (First Floor)






Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating

◦ 5% cost escalation

* As per the BOQ Provided

22,874
1,897
2,580
1,470

1,554
2,165
--------------32,577
========

Equipment for the Audiology Center
Currency in Euros







Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation

4,232
6,432
4,614
4,437
985
--------------20,700
========

With the proposed center there will also be an monthly overhead of
approximately Euro 350

What Round Table can do ?
Fund 53,000 Euros

1. Audiology laboratory Auditorium

32,577

(Euro)

2. A well equipped Audiology lab :

20,700

(Euro)

To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel

Thank you !


Slide 8

“Have U Heard” Round Table
Colombo Round Table 1

RT Austria AGM
Vienna

for

Kids in Need

Thank You for Hearing Us Austria !!
Table

Table

1

26

2

28

4

29

6

31

11

33

12

34

15

37

17

39

18

41

19

42

25

48

Your Support Made us come close to Their Dream ………………….

November 2009

The World Is Hearing us Today

Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/

Shaping Up

Expenses Incurred Thus far
Currency in Euros

Land Cost

25,100

Earth Filling

1,000

Building Temporary Pre-School

1,657

Building the Retention wall

3,052

Construction up to ground floor

4,193

Concrete slab (roof level of ground floor)

*12,916

* Includes Funds form RTA and RTI

--------------Excluding the land cost

47,918
=========

They also incur a monthly overhead cost of Approximately - Euro 322

Projected Expenses in Need
Currency in Euros




Concrete slab upwards (First Floor)






Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating

◦ 5% cost escalation

* As per the BOQ Provided

22,874
1,897
2,580
1,470

1,554
2,165
--------------32,577
========

Equipment for the Audiology Center
Currency in Euros







Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation

4,232
6,432
4,614
4,437
985
--------------20,700
========

With the proposed center there will also be an monthly overhead of
approximately Euro 350

What Round Table can do ?
Fund 53,000 Euros

1. Audiology laboratory Auditorium

32,577

(Euro)

2. A well equipped Audiology lab :

20,700

(Euro)

To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel

Thank you !


Slide 9

“Have U Heard” Round Table
Colombo Round Table 1

RT Austria AGM
Vienna

for

Kids in Need

Thank You for Hearing Us Austria !!
Table

Table

1

26

2

28

4

29

6

31

11

33

12

34

15

37

17

39

18

41

19

42

25

48

Your Support Made us come close to Their Dream ………………….

November 2009

The World Is Hearing us Today

Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/

Shaping Up

Expenses Incurred Thus far
Currency in Euros

Land Cost

25,100

Earth Filling

1,000

Building Temporary Pre-School

1,657

Building the Retention wall

3,052

Construction up to ground floor

4,193

Concrete slab (roof level of ground floor)

*12,916

* Includes Funds form RTA and RTI

--------------Excluding the land cost

47,918
=========

They also incur a monthly overhead cost of Approximately - Euro 322

Projected Expenses in Need
Currency in Euros




Concrete slab upwards (First Floor)






Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating

◦ 5% cost escalation

* As per the BOQ Provided

22,874
1,897
2,580
1,470

1,554
2,165
--------------32,577
========

Equipment for the Audiology Center
Currency in Euros







Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation

4,232
6,432
4,614
4,437
985
--------------20,700
========

With the proposed center there will also be an monthly overhead of
approximately Euro 350

What Round Table can do ?
Fund 53,000 Euros

1. Audiology laboratory Auditorium

32,577

(Euro)

2. A well equipped Audiology lab :

20,700

(Euro)

To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel

Thank you !


Slide 10

“Have U Heard” Round Table
Colombo Round Table 1

RT Austria AGM
Vienna

for

Kids in Need

Thank You for Hearing Us Austria !!
Table

Table

1

26

2

28

4

29

6

31

11

33

12

34

15

37

17

39

18

41

19

42

25

48

Your Support Made us come close to Their Dream ………………….

November 2009

The World Is Hearing us Today

Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/

Shaping Up

Expenses Incurred Thus far
Currency in Euros

Land Cost

25,100

Earth Filling

1,000

Building Temporary Pre-School

1,657

Building the Retention wall

3,052

Construction up to ground floor

4,193

Concrete slab (roof level of ground floor)

*12,916

* Includes Funds form RTA and RTI

--------------Excluding the land cost

47,918
=========

They also incur a monthly overhead cost of Approximately - Euro 322

Projected Expenses in Need
Currency in Euros




Concrete slab upwards (First Floor)






Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating

◦ 5% cost escalation

* As per the BOQ Provided

22,874
1,897
2,580
1,470

1,554
2,165
--------------32,577
========

Equipment for the Audiology Center
Currency in Euros







Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation

4,232
6,432
4,614
4,437
985
--------------20,700
========

With the proposed center there will also be an monthly overhead of
approximately Euro 350

What Round Table can do ?
Fund 53,000 Euros

1. Audiology laboratory Auditorium

32,577

(Euro)

2. A well equipped Audiology lab :

20,700

(Euro)

To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel

Thank you !


Slide 11

“Have U Heard” Round Table
Colombo Round Table 1

RT Austria AGM
Vienna

for

Kids in Need

Thank You for Hearing Us Austria !!
Table

Table

1

26

2

28

4

29

6

31

11

33

12

34

15

37

17

39

18

41

19

42

25

48

Your Support Made us come close to Their Dream ………………….

November 2009

The World Is Hearing us Today

Round Table International Recognizes the Project “Have U Heard”
Moreover this project is the first ever Project in Sri Lanka to be received
a Round Table International Presidents award of Euro 2500
http://www.roundtable.name/

Shaping Up

Expenses Incurred Thus far
Currency in Euros

Land Cost

25,100

Earth Filling

1,000

Building Temporary Pre-School

1,657

Building the Retention wall

3,052

Construction up to ground floor

4,193

Concrete slab (roof level of ground floor)

*12,916

* Includes Funds form RTA and RTI

--------------Excluding the land cost

47,918
=========

They also incur a monthly overhead cost of Approximately - Euro 322

Projected Expenses in Need
Currency in Euros




Concrete slab upwards (First Floor)






Structural work
Plumbing and sanitary fittings
Electrical wiring
Doors and windows
Painting and Decorating

◦ 5% cost escalation

* As per the BOQ Provided

22,874
1,897
2,580
1,470

1,554
2,165
--------------32,577
========

Equipment for the Audiology Center
Currency in Euros







Ear mold fabrication
Clinical Audiometer
Play Audiometer
Accu. Screen (Screening of Newborn Babies)
5% cost escalation

4,232
6,432
4,614
4,437
985
--------------20,700
========

With the proposed center there will also be an monthly overhead of
approximately Euro 350

What Round Table can do ?
Fund 53,000 Euros

1. Audiology laboratory Auditorium

32,577

(Euro)

2. A well equipped Audiology lab :

20,700

(Euro)

To measure hearing and obtain audiograms
Material & equipment to fabricate Ear molds
Equipment & material to repair hearing aids
Trained personnel

Thank you !